| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 LAccepted-AOC | ₹8.0 L | L1 | Accepted-AOC Kumud kumar Mishra is winner |
| 2 | L1₹8.0 LRejected-Finance | ₹8.0 L | L1 | Rejected-Finance L1 tenderer but could not win the transparent lottery context |
| 3 | L1₹8.0 LRejected-Finance | ₹8.0 L | L1 | Rejected-Finance L1 tenderer but could not win the transparent lottery context |
| 4 | L1₹8.0 LRejected-Finance | ₹8.0 L | L1 | Rejected-Finance L1 tenderer but could not win the transparent lottery context |
| 5 | L1₹8.0 LRejected-Finance | ₹8.0 L | L1 | Rejected-Finance L1 tenderer but could not win the transparent lottery context |
Tender Value
Refer Docs
EMD Value
₹8,050
Closing Date
6 Jul 2026, 5:00 pmClosed
SE Mayurbhanj (R and B) Division Baripada
O/o the SE Mayurbhanj (R and B) Division Baripada
Construction of Temporary barricading, thermoplastic and painting on Palbani-Asanjoda Road (Badadanda) from 3.000 km to 4.000 km for the Car festival in 2026 in the District of Mayurbhanj for the year 2026-27
2026_EICCL_133799_1
Bid Id No. SE- 07/2026-27
Open Tender
Civil Works - Roads
Percentage
30 days
Baripada
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,000
₹8,050
Yes
17 Aug 2026
30 Jun 2026
7 Jul 2026
30 Jun 2026
6 Jul 2026
30 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL Providing and laying of hot applied thermoplastic compound 2.5mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes etc complete | - | Sqm | 1 | - |
| 2 | Labour Charges for digging holes for fixing bullah on the ground etc complete.. including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, scaffolding, sundries, T&P required for the works etc. complete in all respect as directed by the Engineer-in-charge | - | Nos | - | - |
| 3 | Labour charges for Binding the bamboo with bullah with Coirr rope etc complete. including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, scaffolding, sundries, T&P required for the works etc. complete in all respect as directed by the Engineer-in-charge | - | Nos | - | - |
| 4 | Supplying of coirstring for binding bamboo with bullah in position etc complete including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, scaffolding, sundries, T&P required for the works etc. complete in all respect as directed by the Engineer-in-charge | 1 | Kg | 1 | ₹1 |
| 5 | Supplying fitting and fixing of Tarpoline for Tent on hire basis etc complete including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, scaffolding, sundries, T&P required for the works etc. complete in all respect as directed by the Engineer-in-charge | - | Sqm | - | - |
| 6 | Supplying fitting and fixing of side walling & Ceiling with cloth for tent on hire basis etc complete including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, scaffolding, sundries, T&P required for the works etc. complete in all respect as directed by the Engineer-in-charge | 0.29 | Sqm | - | - |
| 7 | Supplying of Bamboo on hire basis for barricading etc complete including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, scaffolding, sundries, T&P required for the works etc. complete in all respect as directed by the Engineer-in-charge | - | Nos | - | - |
| 8 | Construction of granular sub-base by providing Close graded Granular subbase Grading-VI material as per table 400-1, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density complete as per approved drawing and technical specifications and as per Clause 401 of MoSRT&H Specifications for Road & Bridge works (5th Revision) including cost, royality and other taxes of materials | - | Cum | - | - |
| 9 | Fly ash Brick Masonry in Cement Mortar (1:6) using bricks of size (25 Cm. x 12 Cm. x 8Cm.) in foundation and plinth with all cost etc complete including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, scaffolding, sundries, T&P required for the works etc. complete in all respect as directed by the Engineer-in-charge | - | Cum | - | - |
| 10 | Supplying fitting & Fixing of front table on hire basis etc complete including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, scaffolding, sundries, T&P required for the works etc. complete in all respect as directed by the Engineer-in-charge | - | Nos | - | - |
stage.html
html • 0.16 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_598926.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
BOQ_598926.xls
BOQ • 0.30 MB
dtcn.pdf
Tender Documents • 4.82 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .