Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 LAdmitted-Fee/PreQual/Technical/Finance | -31.13% | ₹1.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.7 L+₹2,625.64 (1.57%)Admitted-Fee/PreQual/Technical/Finance | -30.05% | ₹1.7 L+₹2,625.64 (1.57%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.7 L+₹4,910.91 (2.93%)Admitted-Fee/PreQual/Technical/Finance | -29.11% | ₹1.7 L+₹4,910.91 (2.93%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-ITR not uploded |
Tender Value
₹2.4 L
EMD Value
₹4,860
Closing Date
2 Sept 2026, 4:00 pmClosed
Executive Engineer ID Ompora
Executive Engineer ID Ompora
Improvements to Maninar khul by way of Bed concreting and jackting at village Khag
2026_IFC_320620_2
enit No 7 of 08 2026
Open Tender
Civil Works
Percentage
20 days
Budgam
Please refer Tender documents.
5 documents required · 5 mandatory
₹200
Chief Engineer Kmr I and FC Deptt.
₹4,860
8 Sept 2026
12 Aug 2026
3 Sept 2026
12 Aug 2026
2 Sept 2026
12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dumping stone excluding cost of stones. in Horizontal on level | 8.51 | cum | 237.9 | ₹2,024.53 |
| 2 | Supplyof stones/Boulders/soling (nallah) nominal size 225 mm | 8.51 | cum | 700 | ₹5,957 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 13.79 | cum | 7,104.35 | ₹97,968.99 |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level thermo-Mechanically Treated bars of grade Fe-500D or more. | 965.3 | kg | 123.2 | ₹1,18,924.96 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 0.44 | cum | 6,591.25 | ₹2,900.15 |
| 6 | Carriage of Materials from source upto road site by Mechnical transport including cost of loading unloading and stacking .
Stone soling from Kandhama avg. lead of 11 Kms | 8.51 | cum | 343.71 | ₹2,924.97 |
| 6.1 | 20mm agg.from Kandhama avg. lead of 11 kms | 12.8 | cum | 292.13 | ₹3,739.26 |
| 6.2 | Cement from Khag avg. lead of 05 kms | 4.55 | MT | 178.43 | ₹812.39 |
| 6.3 | Steel from Khag avg. lead of 05 kms | 0.97 | MT | 178.43 | ₹172.18 |
| 6.4 | Sand from Shilvat avg. lead of 45 kms | 6.4 | Cum | 685.94 | ₹4,390.02 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.96 MB
BOQ_1066405.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .