Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 LAccepted-Finance | L1 | Accepted-Finance BOQ Rate accepted | |
| 2 | L2₹3.7 L+₹18,473.80 (5.25%)Accepted-Finance | L2 | Accepted-Finance BOQ Rate accepted |
| Sl No | Description | Qty | Unit | BALAVINAYAKAR BROS L1 | SUBBAN ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | Cleaning the entire stretch of cold and hot water tunnels of Unit - III including removing and refixing of manhole covers, providing adequate lighting as directed by Engineer in charge, dewatering both the tunnels using diesel/ electric pump, cleaning of slush, clay and debris and removing / scrapping all the burnacles and marine vegetations without chipping in the tunnels including hire charges for pumps, all consumables for lighting and pumping arrangements, labour, T&P, lead, lift, complete. (Gasket for manhole covers will be supplied by department at free of cost). | 1,103.5 | Rm | 2,50,494.5 ₹2,95,583.51 Lowest | 2,64,840 ₹3,12,511.2 |
| 2.00 | Removal and clearing the marine vegetations etc., from the dumped area near CWPH-I and transformer yard including transporting the same with a lead of 1km away from the site etc., complete. | 42 | M3 | 7,560 ₹8,920.8 Lowest | 8,190 ₹9,664.2 |
| 3.00 | Scrapping the old RCC wall/ slab thoroughly by hard wire brush and cleaning for applying protective epoxite treatment including cost of wire brush, labour, scaffolding, etc., complete. | 29.9 | M2 | 299 ₹352.82 Lowest | 448.5 ₹529.23 |
| 4.00 | Providing 10mm thick epoxy screeding using quartz sand and epoxy components of Hindustan ciba geigy/ roto polymer/ cerachem/ fosroc or equivalent make beneath the screeding as directed by the engineer in charge at site including cost of all materials labours, leads, lifts, scaffolding charges provision of lighting arrangements, safety appliances etc., complete. | 29.9 | M2 | 69,308.2 ₹81,783.68 Lowest | 71,760 ₹84,676.8 |
| 5.00 | Providing two coats of epoxite seal coat over the pipe tunnel inside surface using epoxy compounds of Hindustan ciba geigy/ roto polymer/ cerachem/ fosroc or equivalent make as directed by the engineer in charge at site including cost of all materials labours leads lifts, providing lighting arrangements, safety appliances, etc., complete. | 29.9 | M2 | 23,920 ₹28,225.6 Lowest | 24,817 ₹29,284.06 |
Tender Value
Refer Docs
EMD Value
₹3,700
Closing Date
5 Oct 2026, 2:00 pmClosed
Chief Engineer TTPS Tuticorin
Office of the Superintending Engineer Civil TTPS
Cleaning and Patch up works to the Cold and Hot Water Tunnels of Unit 3
2026_EB_706861_1
CE SE C TTPS Spec.No. 93 26 27
Open Tender
Civil Works - Others
Item Rate
30 days
Tuticorin Thermal Power Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3,700
Yes
7 Oct 2026
22 Sept 2026
6 Oct 2026
22 Sept 2026
5 Oct 2026
22 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning the entire stretch of cold and hot water tunnels of Unit - III including removing and refixing of manhole covers, providing adequate lighting as directed by Engineer in charge, dewatering both the tunnels using diesel/ electric pump, cleaning of slush, clay and debris and removing / scrapping all the burnacles and marine vegetations without chipping in the tunnels including hire charges for pumps, all consumables for lighting and pumping arrangements, labour, T&P, lead, lift, complete. (Gasket for manhole covers will be supplied by department at free of cost). | 1,103.5 | Rm | 78.6 | ₹86,735.1 |
| 2 | Removal and clearing the marine vegetations etc., from the dumped area near CWPH-I and transformer yard including transporting the same with a lead of 1km away from the site etc., complete. | 42 | M3 | 38.5 | ₹1,617 |
| 3 | Scrapping the old RCC wall/ slab thoroughly by hard wire brush and cleaning for applying protective epoxite treatment including cost of wire brush, labour, scaffolding, etc., complete. | 29.9 | M2 | 5,155.5 | ₹1,54,149.45 |
| 4 | Providing 10mm thick epoxy screeding using quartz sand and epoxy components of Hindustan ciba geigy/ roto polymer/ cerachem/ fosroc or equivalent make beneath the screeding as directed by the engineer in charge at site including cost of all materials labours, leads, lifts, scaffolding charges provision of lighting arrangements, safety appliances etc., complete. | 29.9 | M2 | 470.9 | ₹14,079.91 |
| 5 | Providing two coats of epoxite seal coat over the pipe tunnel inside surface using epoxy compounds of Hindustan ciba geigy/ roto polymer/ cerachem/ fosroc or equivalent make as directed by the engineer in charge at site including cost of all materials labours leads lifts, providing lighting arrangements, safety appliances, etc., complete. | 29.9 | M2 | 9,007.3 | ₹2,69,318.27 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_849536.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .