Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.4 CrAccepted-AOC BEHIND SATGURU ICE FACTORY GANESH NAGAR GONDIA 441601 | GONDIA | GONDIA | MAHARASHTRA | 441601 | ₹17.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹17.8 Cr+₹44.7 L (2.57%)Accepted-AOC | ₹17.8 Cr+₹44.7 L (2.57%) | L2 | Accepted-AOC L2 |
| 3 | L3₹18.2 Cr+₹77.4 L (4.45%)Rejected-AOC | ₹18.2 Cr+₹77.4 L (4.45%) | L3 | Rejected-AOC L3 |
| 4 | L4₹19.2 Cr+₹1.8 Cr (10.5%)Rejected-AOC | ₹19.2 Cr+₹1.8 Cr (10.5%) | L4 | Rejected-AOC L4 |
| 5 | L5₹19.5 Cr+₹2.1 Cr (12.2%)Rejected-AOC 677 SARASWAT SANSKRITI UDAIN II RAIBARELLY ROAD ELDECO UDYAN 2 LUCKNOW UTTAR PRADESH 226025 | LUCKNOW | UTTAR PRADESH | 226025 | ₹19.5 Cr+₹2.1 Cr (12.2%) | L5 | Rejected-AOC L5 |
Tender Value
₹22.3 Cr
EMD Value
₹11.1 L
Closing Date
6 Jun 2025, 6:00 pmClosed
Ex.Engr.Construction Dn.(S.P.)Nagpur
Ex.Engr.Construction Dn.(S.P.)Nagpur
CONSTRUCTION OF BOYS AND GIRLS HOSTEL BUILDING WITH ELECTRIFICATION FOR DISTRICT SPORTS COMPLEX GADA KAMPTEE DIST. NAGPUR
2025_PWR_1183603_1
NAG/SP/CD/02/2025-26
Open Tender
Civil Works
Item Wise
545 days
KAMPTEE DIST. NAGPUR
please refer tender document
3 documents required · 3 mandatory
₹3,540
₹11.1 L
Chief Engineer,P.W. Region, Nagpur
2 Jan 2026
24 May 2025
9 Jun 2025
24 May 2025
6 Jun 2025
24 May 2025
27 May 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1L | |||||
| 1.1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. | 1,735.24 | One Square Metre | 100 | ₹1,73,524 |
| 2 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means | 2,273.4 | One Cubic Metre | 100 | ₹2,27,340 |
| 3 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.50 m to 3.0 m) By Mechanical Means | 2,273.4 | One Cubic Metre | 100 | ₹2,27,340 |
| 4 | Excavation for foundation in Hard murum including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 3.0 m to 4.50 m.) By Mechanical Means | 576.56 | One Cubic Metre | 100 | ₹57,656 |
| 5 | Filling in plinth and floors with contractors material/brought from outside and approved by Engineer incharge in layers of 15 cm to 20 cm including watering and compaction etc. complete. | 2,107.02 | One Cubic Metre | 100 | ₹2,10,702 |
| 6 | Providing soling using 80 mm size trap metal in 15 cm. layer including filling voids with Crushed sand/grit, ramming, watering etc. complete. | 537.61 | One Cubic Metre | 100 | ₹53,761 |
| 7 | Transportation of material obtained from debries of various sort including necessary excavation/ loosing including loading, unloading and disposing as directed . (For 3.00 km lead) | 2,845.7 | One Cubic Metre | 100 | ₹2,84,570 |
| 8 | Providing preconstructionalantitermite treatment as per I.S. 6313 (Part-II) treatment by treating the backfill in immediate contact with foundation at the rate of 5 litres of emulsion concentrate of 1.0 percent of clorophyrifos per One Square Metre of vertical surface area covering 10 years guarantee on bond paper. | 154.58 | One Square Metre | 100 | ₹15,458 |
| 9 | Providing preconstructionalantitermite treatment as per I.S. 6313 (Part-I) to the soil along the external face of building by punching holes of 1.2 of 1.5 C.M. diametre about 30 -60 cm deep at 15 cm c/c as close to the wall as possible and to inject 0.5 percent of aldrin or clorophyrifos at the rate of 7.5 litres per hole and sealing the same with proper filling and covering 10 years guarantee on bond paper. | 335.58 | One Square Metre | 100 | ₹33,558 |
stage.html
html • 0.01 MB
tech_bid_open.pdf
tech_eval.pdf
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
171407341.pdf
Tender Documents • 0.99 MB
171407343.html
Tender Documents • 0.05 MB
172045802.pdf
Tender Documents • 0.18 MB
172045803.html
Tender Documents • 0.01 MB
172109108.pdf
Tender Documents • 0.15 MB
172109109.html
Tender Documents • 0.01 MB
T.No.2GadaBoysandgirlshostelkamptee.pdf
Tender Documents • 4.69 MB
T.No.2GadaBoysandgirlshostelkamptee.xls
Tender Documents • 0.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .