Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | SINGLE₹12.7 LAccepted-AOC SHUKIA MORE MORWA DISTT SINGRAULI MP | MORWA | SINGRAULI | MP | SINGLE | Accepted-AOC AWARD OF WORK TO SINGLE BIDDER |
Tender Value
₹13.1 L
EMD Value
₹16,400
Closing Date
24 Jul 2023, 11:00 amClosed
GENERAL MANAGER EXCAVATION
NCL KHADIA PROJECT, SHAKTINAGAR, SONEBHADRA, U.P.
Dismantling and re-fitment of Bearing stands, Rope drums and complete Hoist and Drag gear box of ESH 20/90 Baidyanath Dragline of Khadia Project
2023_NCL_283246_1
KHD/G.M. (Excv)/E-Tender/23-24/328
Open Tender
Excavation Department Work
Item Rate
35 days
NCL KHADIA PROJECT, SHAKTINAGAR
Please refer Tender documents.
5 documents required · 5 mandatory
₹16,400
12 Sept 2023
8 Jul 2023
25 Jul 2023
8 Jul 2023
24 Jul 2023
10 Jul 2023
8 Jul 2023 - 13 Jul 2023
Amount
• Scope of Work/Technical Specifications etc: 1. Replacement of complete Bearing stand Hoist/Drag system along with rope drums L&R.
Labour charges for Cuttting of locks and stoppers, losening and tightening of studs and bolts, Removal of Hoist & Drag Gear Box covers and re-fitment. Note:- It includes a group of 02 Nos. Skilled Welder, 02 Nos. Skilled Fitter, 04 Nos. Semi Skilled Fitter & 06 Nos. Un-Skilled manpower in 02 shifts for 04 days.
Labour charges for Dismantling, removal, re-fitment and alignment of Hoist/Drag motors. Note:- It includes a group of 02 Nos. Skilled Welder, 02 Nos. Skilled Fitter, 04 Nos. Semi Skilled Fitter & 04 Nos. Un-Skilled manpower in 02 shifts for 05 days.
Labour charges for Removal and refitment of blower motor assy. and electrical connections. Note:- It includes a group of 02 Nos. Skilled Welder, 04 Nos. Skilled Fitter, 02 Nos. Skilled Electrician & 04 Nos. Un-Skilled manpower in 02 shifts for 03 days.
Labour charges for Removal and Re-fitment of Hoist & Drag intermediate shafts, break drum shafts, Double helical Gears. Note:- It includes a group of 02 Nos. Skilled Welder, 04 Nos. Skilled Fitter, 06 Nos. Semi-Skilled Fitter & 06 Nos. Un-Skilled manpower in 02 shifts for 06 days.
Labour charges for Removal and Refitment of LHS & RHS rope drums of Hoist & Drag Mechanism. Note:- It includes a group of 02 Nos. Skilled Welder, 02 Nos. Skilled Fitter, 02 Nos. Semi-Skilled Fitter, & 04 Nos. Un-Skilled manpower in 02 shifts for 04 days.
Labour charges for Removal and Refitment & alignment of complete bearing stand assy. of Hoist & Drag Mechanism. Note:- It includes a group of 03 Nos. Skilled Welder, 04 Nos. Skilled Fitter, 06 Nos. Semi-Skilled Fitter & 06 Nos. Un-Skilled manpower in 02 shifts for 08 days.
Labour charges for Removal and Refitment of Hoist and Drag Ropes from and to rope Drums. Note:- It includes a group of 02 Nos. Skilled Welder, 02 Nos. Skilled Fitter, 04 Nos. Semi-Skilled Fitter & 06 Nos. Un-Skilled manpower in 02 shifts for 04 days.
Supervision charges for above job Note:- It includes 01 No. Highly Skilled Supervisor in 02 shifts for 34 days.
Charges of Grinding Wheel 100mm*25mm.
Hiring Charges
Welding Machines - 02 Nos. per day.
Grinder Heavy Duty - 02 Nos. per day.
Gas Cutting Set With Accessories - 02 Nos. per day. .
Charges for Special tools and tackles, safety harness, Rope tray lock bolts etc.
Transportation Charges- 02 Nos. vehicle per day
Crane 14T - 1 No. per day .
Total impact of GST for the purpose of CTC
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_293286.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .