Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC WARD NO 04 NEAR LIC PARASIA PARASIA CHHINDWARA MADHYA PRADESH 480441 | CHHINDWARA | MADHYA PRADESH | 480441 | L1 | Accepted-AOC Lowest Rate | |
| 2 | L2₹93.3 L+₹2.7 L (2.98%)Rejected-Finance WARD NO 13 BANDHA MOHALLA PARASIA PARASIA CHHINDWARA MADHYA PRADESH 480441 | CHHINDWARA | MADHYA PRADESH | 480441 | L2 | Rejected-Finance Higher Rate | |
| 3 | L3₹97.3 L+₹6.7 L (7.40%)Rejected-Finance | L3 | Rejected-Finance Higher Rate |
Tender Value
₹1.0 Cr
EMD Value
₹1.3 L
Closing Date
5 Sept 2023, 5:00 pmClosed
Staff Officer (Mining), Pench Area, WCL
Office of the Area General Manager Western Coalfields Limited Pench Area Parasia District Chhindwara
Dismantling, Transportation, Installation, Extension and Tail End Shifting of 8 Gate Belt for Development and Depillaring Panels in Seam II and Seam IV at Naheriya Underground Mine of Pench Area
2023_WCL_286473_1
pe3350-min-e0028-2023-24
Open Tender
Miscellaneous Works
Item Rate
365 days
Naheriya Underground Mine of Pench Area
Please refer Tender documents.
7 documents required · 7 mandatory
₹1.3 L
18 Oct 2023
19 Aug 2023
7 Sept 2023
20 Aug 2023
5 Sept 2023
20 Aug 2023
20 Aug 2023 - 28 Aug 2023
Amount
PART - A - DSR Items
Excavation work in foundation trenches or drain not exceeding 1.5M in width or plan including dressing of sides and ramming of bottom lift upto 1.5M ...etc
Providing and laying in position cement concrete of specified grade excluding the cost of centring & shuttering 1:2:4 (1Cement, 2course sand, 4 graded stone 20mm)
Centering and shuttering including, strutting, propping etc Removal of of form for RCC work
PART - B - Non - DSR Items
Installation of 02 x 55 KW (800MM) belt drive head with all accessories and electrical up to initial lead 50 mtr
Extra for transportation drive head for every additonal lead upto 50 mtr. 1) 25LN/1DN (Seam-IV)= 02 leads 2) Drift Seam IV to Seam II = 03 Lead 3) 14DS/21L (Seam-II) = 03 lead 4) 44LS/36DS (Seam II) = 05 Lead 5) 39LS/31DS (Seam IV) = 04 Lead 6) 39LN/31DS (Seam IV) = 04 Lead 7) 8LN/8DN (Seam IV) = 03 Lead 8) 29LN/9DN (Seam IINE3) = 04 Lead Total 28 Lead
Transportation & installation of structure roller, stool bracket……etc and laying of belts with all accessories up to initial lead 50m (For 100M) 800mm 1) 14DS/21L -30L (Seam-II) = 270m 2) 44LS/36DS -44DS (Seam II) = 240m 3) 39LS/31DS -40DS (Seam IV) = 270m 4) 39LN/31DS -22DS (Seam IV) = 270m Total 1050m
Extra for transportation of belt structure …etc for every 50 mtrs ........ 1) 14DS/21L-30L (Seam II) = 270M x 3Lead = 810M 2) 44LS/36DS-44DS (Seam-II) = 240M x 4Lead = 960M 3) 39LS/31DS-40DS (Seam-IV) = 270M x 3Lead = 810M 4) 39LN/31DS- 22DS (Seam-IV) = 270M x 3Lead =810M Total 3300 M
Transportation & installation (1000m) of structure roller, stool bracket……etc and laying of belts with all accessories up to initial lead 50m (For 100M) 1) Drift Seam IV to 31L (Seam-II) = 180m 2) 29LN/9DN -17DN (Seam II) = 240m
Extra for transportation of belt structure …etc for every 50 mtrs ........ 1) Drift Seam IV to 31L (Seam-II) = 180m x 4Lead = 720M 2) 29LN/9DN -17DN (Seam II) = 240m x 4Lead = 960M
Shifting/Extension and installation of Tail end with all accessories up to one pillar 1) 14DS/21L -30L(Seam-II) = 2 Times 2) 44LS/36DS - 44DS (Seam-II) = 5 Times 3) 39LS/31DS - 40DS (Seam-IV) = 6 Times 4) 39LN/31DS - 22DS (Seam-IV) = 6 Times 5) Drift Seam IV to 31L (Seam II) = 4 Times 6) 29LN/9DN -17DN (Seam II) = 5 Times Total = 28 Times
Complete supply of nut & bolts
Belt fasteners hook for belt jointing
Dismantling, stacking & transportation of belt. Drive head with all accessories upto initial lead of 50 mtrs. 1) 6L/7DN - 8DN (Seam-IV) = 01 2) 8LN/8DN (Seam-IV) = 01 3) 44LS/36DS (Seam-II)=01 4) 36DS/39L (Seam-II)= = 01
Dismantling, stacking & transport of structures, rollers of belt with all accessories upto initial lead of 50 mtrs.(100 mtrs.) 1) 6L/1D (Seam II) - 8DN (Seam IV) = 210M 2) 8LN/8DN - 15DN (Seam-IV) = 210M 3) 44LS/36DS-44DS (Seam-II) = 240M 4)36DS/39L -47L (Seam-II) = 240M 5) 39LS/24DS-36DS (Seam-IV) = 360M
Total impact of GST for the purpose of CTC
DIAMOND CONSTRUCTION
AAVED SHEIKH
DIAMOND CONSTRUCTION
AAVED SHEIKH
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .