EE MJP SINDHUDURGNAGARI
EE MJP DIVISION SINDHDURGNAGARI TALUKA KUDAL
Operation And Maintenance of water supply scheme based on Tillari project for 3 months District Sindhudurg
2026_COJAL_1267657_1
MJP/N4/2ndcall/ OPERATE/ WSS/TILARI/2025-26
Open Tender
Civil Works
90 days
TILARI TAL DODAMARG
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
₹23,230
EE MJP SINDHUDURGNAGARI
12 Mar 2026
9 Jan 2026
16 Jan 2026
9 Jan 2026
15 Jan 2026
9 Jan 2026
12 Jan 2026
Subwork No.1 Repairs And maintainance of Rising main & Distribution system
Item No.1 :-Carrying out repairs to air valves/sluice valve including opening of sluice valve for laying & fixing bolts to air valves including oiling & greasing gland packing, nut bolts etc. complete.
For Air valve
For Sluice valve
Item No.2 :-Removing leakages in various dia of pipe including excavation lowering, laying & jointing & cost of material & refilling etc. complete.
RA 1- 100 MM DI PIPE
RA 2- 150 MM DI PIPE
RA 3- 200 MM DI PIPE
RA 4- 300 MM DI PIPE
RA 5- 350 MM DI PIPE
RA 6- 400 MM DI PIPE
RA 7- 1200 MM PCCP PIPE
RA 8- 900 MM PCCP PIPE
RA 9- 600 MM PCCP PIPE
Item No 3 :- Providing & Supplying Electrician, mazdoor & Helper for running of Sindhudurgnagari water works as an when required or only 20 days per month as per necessary of work . This mandays will only assist Jalsevak of Tillari water Supply scheme no master will be maintained. (for emegency work)
Mazdoor
Electrician
Item No 4:- Providing and supplying ISI standard CI flanged / S& S specials including all statutory duties & taxes such as GST levied by GOI & GOM in all respect, railway freight, insurance, unloading from railway wagon, loading into truck transport to departmental store /site, unloading stacking etc. complete.
80 mm to 300 mm
350 mm & above
Sub work No.2 O&M Mechanical and material charges.
Item No.1 :- Carrying out repairs to electrical unit / pump panels & similar units with necessary materials & instructed by engineer in charge. Lumpsum provision is made
Sub Work No.3 ESTHABLISHEMENT CHARGES FOR JAN 26- MARCH 26
1. Pump Operator
2. Valveman/Watchman/Mazdoor ( heavy)
3. Meter reader/ water rate collector
4. Filter Operator/ Chemist
Sub Work No.4 Chemical Consumption and material charges.
Item No.01:- Provision for PAC Powder required
Chemical Charges
Provision for PAC Powder required
1) Daily Demand of 8.922 ML
2) Rate of Consumption = 2.5 gm /m^3 for 90 days
Assume Turbidity = 10 NTU
Daily Requirment = 8922 x 2.5 = 22305 gm = 22.30 kg
For90 days of Summer = 90 x 22.30 = 2007 Kg. Say 2010 Kg.
Total yearly PAC Requirment = 2010 kg = 2.01 MT
Item No.02:- Provision for TCL required
1) Daily Demand 8.922 ML
2) Rate of Consumption 6 kg/ML
3) requirement - (0.6 kg/hr)/ (1.2 ML/HR)= 0.5 ppm '0.5 x 6 hr = 3 kg per day
3 kg per day x 90 day - 270 kg
Liquid Chlorine 900 Kg Container.1 Nos.x Rs.16758.00 Deptt. Container
Item No.03:- Water sample Testing Considering Testing of water / two week : 2 X 3 X 1200
Rate as per PHL SINDHUDURG.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.79 MB
keyplan.pdf
Tender Documents • 0.26 MB
BOQ_2183658.xls
BOQ • 0.42 MB
tenderform.pdf
Tender Documents • 3.77 MB
Download all tender documents and submit your bid