Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹87.5 LAccepted-AOC A 404 CHIRAG APARTMENT SULTANABAD COLONY BEHRAM BAUG ROAD JOGESHWARI WEST MUMBAI 400102 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400102 | ₹87.5 L | L1 | Accepted-AOC ACCEPTED |
| 2 | L2₹1.0 Cr+₹13.9 L (15.9%)Rejected-AOC | ₹1.0 Cr+₹13.9 L (15.9%) | L2 | Rejected-AOC REJECTED |
| 3 | L3₹1.0 Cr+₹17.0 L (19.4%)Rejected-Finance MAHARASHTRA | RATNAGIRI | MAHARASHTRA | 415202 | ₹1.0 Cr+₹17.0 L (19.4%) | L3 | Rejected-Finance NOT L1 |
| 4 | L4₹1.1 Cr+₹17.8 L (20.3%)Rejected-Finance 135 GROUND FLOOR DAWADIPAR BAJAR BHANDARA ROAD BHANDARA BHANDARA MAHARASHTRA 441924 | BHANDARA | MAHARASHTRA | 441924 | ₹1.1 Cr+₹17.8 L (20.3%) | L4 | Rejected-Finance NOT L1 |
| 5 | L5₹1.1 Cr+₹20.3 L (23.2%)Rejected-Finance A 201 MAHINDRA MAHINDRA CSH LTD BEHIND BMC SCHOOL DUTTAPADA ROAD BORIVALI E | ₹1.1 Cr+₹20.3 L (23.2%) | L5 | Rejected-Finance NOT L1 |
Tender Value
₹1.3 Cr
EMD Value
₹1.3 L
Closing Date
10 Jan 2022, 6:15 pmClosed
Executive Engineer (West) Division, Mumbai Slum Im
Room no. 537, 4th floor, Griha Nirman Bhavan, Bandra (East), Mumbai 400 051
Reconstruction of Prabodhan Thackeray Library Building at Siddharth Nagar, Goregaon (W)
2022_MHADA_753376_2
EE/West/MSIB /e-Tender / 76 / 2021-22
Open Tender
Civil Works
Percentage
365 days
Goregaon (West)
refer Tender Document
2 documents required · 2 mandatory
₹1,180
₹1.3 L
29 Dec 2022
4 Jan 2022
12 Jan 2022
4 Jan 2022
10 Jan 2022
4 Jan 2022
eProcurement System Government of Maharashtra Created By: Rakesh Dhanwate Created Date/Time: 05-May-2022 06:55 PM Tender Title: Reconstruction of Prabodhan Thackeray Library Building at Siddharth Nagar, Goregaon (W) Tender ID: 2022_MHADA_753376_2
Tender Inviting Authority: Executive Engineer (West),Mumbai Slum Improvement Board
Name of Work : Reconstruction of Prabodhan Thackeray Library Building at Siddharth Nagar, Goregaon (W)
Contract No: EE/West/MSIB /e-Tender / 76 / 2021-22
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 M/s Rionna Enterprises(GSTN-27AAXPH6213KIZ9) 12873106.00 12.00 14417878.72 One Crore Fourty Four Lakh Seventeen Thousand Eight Hundred and Seventy Eight
2.00 MAA CORPORATION(GSTN-27AQYPM6488L1ZJ) 12873106.00 -15.11 10927979.68 One Crore Nine Lakh Twenty Seven Thousand Nine Hundred and Seventy Nine
3.00 M/s Maval Construction(GSTN-27AGPPC3202PIZ9) 12873106.00 -.09 12861520.20 One Crore Twenty Eight Lakh Sixty One Thousand Five Hundred and Twenty
4.00 D R SHAH CONSTRUCTION CO(GSTN-27AAHFD8427D1ZH) 12873106.00 -21.21 10142720.22 One Crore One Lakh Fourty Two Thousand Seven Hundred and Twenty
5.00 M/s. Deepak Construction Company(GSTN-27ACFPT3813K1ZB) 12873106.00 0.00 12873106.00 One Crore Twenty Eight Lakh Seventy Three Thousand One Hundred and Six
6.00 Anurag Enterprises(GSTN-27AARPY1780C1Z9) 12873106.00 0.00 12873106.00 One Crore Twenty Eight Lakh Seventy Three Thousand One Hundred and Six
7.00 Pyramid Construction Company(GSTN-27ACKPL9763B1ZC) 12873106.00 0.00 12873106.00 One Crore Twenty Eight Lakh Seventy Three Thousand One Hundred and Six
8.00 M/S SWASTIK CONSTRUCTION CO(GSTN-27AAVPM5632R1ZN) 12873106.00 -.50 12808740.47 One Crore Twenty Eight Lakh Eight Thousand Seven Hundred and Fourty
9.00 A P CONSTRUCTION(GSTN-27ASLPP2887P1ZM) 12873106.00 0.00 12873106.00 One Crore Twenty Eight Lakh Seventy Three Thousand One Hundred and Six
10.00 NR Infratech(GSTN-27AJVPV1402B1Z8) 12873106.00 -16.20 10787662.83 One Crore Seven Lakh Eighty Seven Thousand Six Hundred and Sixty Two
11.00 Bhagyashri Construction(GSTN-27AATPY6646B1Z2) 12873106.00 0.00 12873106.00 One Crore Twenty Eight Lakh Seventy Three Thousand One Hundred and Six
12.00 S.K. DEVELOPERS(GSTN-27CETPP8989J2Z1) 12873106.00 0.00 12873106.00 One Crore Twenty Eight Lakh Seventy Three Thousand One Hundred and Six
13.00 KRISHNA CONTRUCTION CO(GSTN-27AACPG3118P1ZN) 12873106.00 -18.81 10451674.76 One Crore Four Lakh Fifty One Thousand Six Hundred and Seventy Four
14.00 B V ENTERPRISE(GSTN-27AWEPP8660R1ZI) 12873106.00 -16.01 10812121.73 One Crore Eight Lakh Tweleve Thousand One Hundred and Twenty One
15.00 Patel Trading Co(GSTN-27AAJFP1515F1ZF) 12873106.00 -18.18 10532775.33 One Crore Five Lakh Thirty Two Thousand Seven Hundred and Seventy Five
16.00 D M Infratech(GSTN-NA) 12873106.00 0.00 12873106.00 One Crore Twenty Eight Lakh Seventy Three Thousand One Hundred and Six
17.00 Om Infratech(GSTN-NA) 12873106.00 -16.20 10787662.83 One Crore Seven Lakh Eighty Seven Thousand Six Hundred and Sixty Two
18.00 ROYAL CONSTRUCTION(GSTN-NA) 12873106.00 -32.00 8753712.08 Eighty Seven Lakh Fifty Three Thousand Seven Hundred and Tweleve
Lowest Amount Quoted BY: ROYAL CONSTRUCTION(8753712.08)
BOQ Summary Details Tender Title: Reconstruction of Prabodhan Thackeray Library Building at Siddharth Nagar, Goregaon (W) Tender ID: 2022_MHADA_753376_2
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 ROYAL CONSTRUCTION 8753712.08 L1
2 D R SHAH CONSTRUCTION CO 10142720.22 L2
3 KRISHNA CONTRUCTION CO 10451674.76 L3
4 Patel Trading Co 10532775.33 L4
5 NR Infratech 10787662.83 L5
6 Om Infratech 10787662.83 L5
7 B V ENTERPRISE 10812121.73 L6
8 MAA CORPORATION 10927979.68 L7
9 M/S SWASTIK CONSTRUCTION CO 12808740.47 L8
10 M/s Maval Construction 12861520.20 L9
11 A P CONSTRUCTION 12873106.00 L10
12 Pyramid Construction Company 12873106.00 L10
13 Anurag Enterprises 12873106.00 L10
14 Bhagyashri Construction 12873106.00 L10
15 S.K. DEVELOPERS 12873106.00 L10
16 M/s. Deepak Construction Company 12873106.00 L10
17 D M Infratech 12873106.00 L10
18 M/s Rionna Enterprises 14417878.72 L11
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .