Loading…
Loading…
Tender Value
₹2.5 Cr
EMD Value
₹4.9 L
Closing Date
12 Jun 2026, 4:30 pm6d left
Suprintending Engineer PMGSY Ciircle Baramulla
Superintending Enginer PMGSY Circle Bla R and B complex Baramulla
Construction and maintenance of road from L045Ananwan Gund Kamal Road Km 3rd Gund Kamal to Dogar B Length 1 5 Kms Stage Complete Carriageway width 3 75Mtrs PMGSYIV BatchI 202627 Waste Plastic Package No JK084502 PMGSY Division Handwara
2026_KSRRD_147702_1
02/SE/PMGSY/ BLA/E-TENDERING OF 2026-27
Open Tender
Civil Works - Roads
548 days
Handwara
Please refer Tender documents.
22 documents required · 22 mandatory
₹10,000
₹4.9 L
Office of Superintending Enginer PMGSY Circle Blr
18 May 2026
18 May 2026
13 Jun 2026
19 May 2026
12 Jun 2026
26 May 2026
25 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Part A) Construction of Embankment | - | - | - | - | BI01010001010000000000000515BI0100001112 |
| 2 | Excavation in Soil in hilly areas by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5m and a lead upto 20m as per technical specification clause 1603.1. | 1,128 | Cum | 165.81 | ₹1,87,033.68 | BI01010001010000000000000515BI0100001113 |
| 3 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 9 of SOR ) | 556.87 | Cum | 75.32 | ₹41,943.45 | BI01010001010000000000000515BI0100001114 |
| 4 | Construction of unlined surface drain of average cross sectional area 0.4 sqm in soil to specified lines, grades,levels and dimensions Excavated material to be used in embankment with a lift upto 3m and lead of 50m (average lead 25 m) .as per technical specificaions clause 307. Mechanical means. | 500 | RM | 27.28 | ₹13,640 | BI01010001010000000000000515BI0100001115 |
| 5 | Part B) Pavenent | - | - | - | - | BI01010001010000000000000515BI0100001116 |
| 6 | Preparation of Subgrade :-Loosening of the ground upto a level of 300 mm below the subgrade level,watered, graded and compacted in layers to meet requirement of Tables300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2. (Finished work to be measured) | 1,738.26 | CUM | 71.45 | ₹1,24,198.68 | BI01010001010000000000000515BI0100001117 |
| 7 | Granular sub-base/base/surface course with local materials/ Quarry (Table 400.13) by mix in place method normal Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical including loading unloading haulage octri etc complete job Specification Clause 408. | 1,931.4 | cum | 1,600.05 | ₹30,90,336.57 | BI01010001010000000000000515BI0100001118 |
| 8 | Water Bound Macadam (WBM GRADE-II): Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405.including loading unloading haulage octri etc complete job | 454.73 | cum | 3,712.7 | ₹16,88,276.07 | BI01010001010000000000000515BI0100001119 |
| 9 | Prime Coat: Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502. (Low Porosity) including loading unloading haulage octri etc complete job | 6,063 | Sqm | 53.67 | ₹3,25,401.21 | BI01010001010000000000000515BI0100001120 |
| 10 | Bit. Macadam: P/L Waste Plastic bituminous Macadam 50mm thick, with Hot mix plant using crushed aggregate of grading as per Table 500.4 premixed with bituminous binder(3.04%), and waste plastic(0.26%) as per clause 5.1 table 3 of IRC SP 98 transported to site , laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the designed compaction as per technical specification clause 504 including cost and carriage of all materials from approved source to site of work, with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete.) | 303.15 | cum | 8,915.98 | ₹27,02,879.34 | BI01010001010000000000000515BI0100001121 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_230538.xls
BOQ • 0.38 MB
SBD_JK084502.pdf
Additional Documents • 1.84 MB
Bid_Data.pdf
Additional Documents • 0.51 MB
Download all tender documents and submit your bid