Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹80.8 L
EMD Value
₹80,806
Closing Date
25 Nov 2026, 5:00 pm3d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer
RWSS Division, Rayagada At Ambaguda Near Indoor Stadium Rayagada 765001
Construction of twin E-type quarter with site development at Tikiri of Kashipur RWSS Section under RWSS Division, Rayagada for the year 2026-27
2026_RWSS_145633_1
05/RWSS/RGD/2026-27
National Competitive Bid
Civil Works - Buildings
Percentage
330 days
Rayagada
Please refer to DTCN
2 documents required · 2 mandatory
₹10,000
₹80,806
Yes
10 Nov 2026
10 Nov 2026
26 Nov 2026
10 Nov 2026
25 Nov 2026
10 Nov 2026
10 Nov 2026 - 21 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of E type quarter at Tikiri of Kashipur RWS&S Section under RWSS Division | |||||
| 1.001 | Clearing and grubbing roads and land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. | 442.87 | Cum | 8.74 | ₹3,870.68 |
| 1.002 | Earth work in excavation in foundation trenches, column foundation, pit, etc in all kind of soil including moorum stony earth and earth mixed with boulders except sheet rock and boulders not requiring blasting including dressing of sides and levelling the bed up to the required depth and depositing the excavated materials away from the work site with initial lead of 50 mtr and all lifts, including shoring, shuttering & dewatering (if required) with cost of labour, labour cess, hire & running charges of all machineries, sundries & T&P required for the work complete as directed by the Engineer in charge. | 114.03 | Cum | 315.5 | ₹35,976.47 |
| 1.003 | -Do-
Beyond 1.5mtr to 3.00 mtr Depth | 15.85 | Cum | 338.2 | ₹5,360.47 |
| 1.004 | Filling the Foundation and Plinth, Sides of Foundation, etc. with excavated materials (excluding rock), in layers not exceeding 0.225 m in depth including cost of watering, ramming, dressing and levelling the top to proper level & gradient, cost of labour, conveyance, loading, unloading, T&P, etc, all complete as per the direction of Engineer-in-Charge. | 110.17 | Cum | 175.3 | ₹19,312.8 |
| 1.005 | Disposal of surplus/ excavated materials by mechanical means within 5km. Lead away from the site including cost of all labour , T&P complete as per the direction of the Engineer-in-charge. | 19.71 | Cum | 278.8 | ₹5,495.15 |
| 1.006 | Supplying, diluting and preparing Chemical Emulsion like CHLORPYRIPHOS or other chemicals approved by Central Insecticides Board or as directed by the manufacturer and spraying the mixture uniformly by sprayer as pre-constructional Anti Termite Treatment and creating a chemical barrier under and around the column pits, wall trenches, basement excavation, top surface of plinth filling, junction of walls and floors along with external perimeter of the building, expansion joints, surrounding the pipes and conduits etc. complete at the rate of 7.5 liters (or as directed by the manufacturer) per sqm on vertical and 5.0 liters per sqm on horizontal surfaces, 50% of the emulsion to be filled in the holes made in trenches at 150mm center to center etc.complete as per IS:6313/1981(Part-II) and as per the direction of the Engineer-in-charge including cost of all materials, labour, taxes, etc. complete. | 242.34 | Sqm | 104.5 | ₹25,324.53 |
| 1.007 | Supplying and Filling with Sand in Foundation and Plinth in layers not exceeding 20 cm in depth, well watered and compact , top surface dressed and levelled to proper level and gradient including cost of all materials , conveyance,taxes, royalties, loading, unloading, cost of all labour, T&P, etc.All compelete as per the dirrection of Engineer-in-charge. | 64.69 | Cum | 557.7 | ₹36,077.61 |
| 1.008 | Providing and lying Plain Cement Concrete of proportion (1:3:6) in foundation & floor using 40 mm & down grade black hard crusher broken granite stone metal, washed and screened sharp sand of approved quality from approved quarry including hoisting, lowering, laying the concrete, ramming, watering and curing etc. complete to required thickness including cost of all materials, conveyance, loading, unloading, royalties, cost of labours, T&P, hire & running charges of concrete mixer, etc. all complete as per the direction of the Engineer -in -charge. | 3.98 | Cum | 6,262.5 | ₹24,924.75 |
| 1.009 | (b) Ground Floor filling | 23.92 | Cum | 5,919.5 | ₹1,41,594.44 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.47 MB
BOQ_619278.xls
BOQ • 0.69 MB
01_SBD_ETypeKashipur_05_2026-27.pdf
Tender Documents • 3.91 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .