Loading
Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.3 LAccepted-AOC 5A 582 CALDWELL COLONY TUTICORIN 628008 | TUTICORIN | THOOTHUKUDI | TAMIL NADU | 628008 | ₹37.3 L Quoted ₹34.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹36.5 LRejected-Finance M 18 HOUSING BOARD UNIT MADAYANKUTTAI POST METTUR DAM 636 452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | ₹36.5 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | CKEE ENGINEERING PRIVATE LIMITED L1 | THIAGARAJAN ENGINEERING CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Supply of Turn over panel clip assembly for alignment of 30 Nos of Final reheater coil inlet & outlet tubes of bottom area, coil No: 31 to 60 Nos from LH side of boiler inter pass area (1 set consists of Arresting of Bar - 2 Nos, Locking pin - 9 Nos, Holding clamp - 03 Nos) | 60 | Set | 38,369 ₹23.0 L | 40,196 ₹24.1 L |
| 2.00 | Supply of Horizontal plate with holding pin for Horizontal alignment of Final reheater coil inlet & outlet tubes of bottom area No: 31 to 60 Nos from LH side of boiler inter pass area | 6 | Set | 44,136 ₹2.6 L | 46,237 ₹2.8 L |
| 3.00 | Erection of Turn over panel clip assembly with leading, lifting, holding, positioning for proper alignment of 30 Nos Final reheater coil inlet & outlet tubes of bottom area, Coil No: 31 to 60 Nos from LH side of boiler inter pass area.
i.e., leading, lifting, holding, positioning, welding the arresting bar, locking pin & holding clamp in Turn over panel clip assembly for alignment of 30 Nos Final reheater coil inlet & outlet tubes of bottom area, Coil No: 31 to 60 Nos from LH side of boiler inter pass area., | 60 | Set | 5,309 ₹3.2 L | 5,562 ₹3.3 L |
| 4.00 | Erection of Horizontal plate with holding pin with leading, lifting, holding, positioning for proper Horizontal alignment of 30 Nos Final reheater coil inlet & outlet tubes of bottom area, Coil No: 31 to 60 Nos from LH side of boiler inter pass area
i.e., Positioning, welding the Horizontal plate with holding pin in Turn over panel clip assembly for Horizontal alignment of 30 Nos Final reheater coil inlet & outlet tubes of bottom area, Coil No: 31 to 60 Nos from LH side of boiler inter pass area | 6 | Set | 10,618 ₹63,708 | 11,123 ₹66,738 |
| 5.00 | Arrangement of temporary platform and scaffolding arrangement for erection of Turn over panel clip assembly to alignment of 30 Nos Final reheater coil inlet & outlet tubes of bottom area, Coil No: 31 to 60 Nos from LH side of boiler inter pass areai.e., Providing Platform arrangement at 35° slope of goose neck water wall area, by following highest safety standards including charges for transportation and leading, lifting of scaffolding materials to inside boiler of required area, hire charges for T&P’s etc. | 60 | m2 | 2,440 ₹1.5 L | 2,556 ₹1.5 L |
| 6.00 | Complete dismantling of damaged pitch arrester in inlet & outlet of tubes in Final Reheater, tube No: 31 to 60 Nos from LH side of boiler. This work involves arresting, cutting, leading and removal of damaged pitch arrester in the form of 2 layers and devolution of scraps to central stores. | 60 | Nos | 6,545 ₹3.9 L | 6,857 ₹4.1 L |
Tender Value
Refer Docs
EMD Value
₹36,000
Closing Date
25 Aug 2025, 2:00 pmClosed
CE/ MTPS2
O/o.CE/ MTPS2
Supply and erection of Turn over panel clip 31 to 60
2025_EB_593480_1
OT 177 Supply and erection of Turn over panel clip 31 to 60
Open Tender
Maintenance Works
28 days
MTPS2
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹36,000
Yes
12 Mar 2026
18 Aug 2025
26 Aug 2025
18 Aug 2025
25 Aug 2025
18 Aug 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid