Special repairs to leaky roof arrangement Flooring Water supply and Sanitary arrangements Doors and Windows at HSC Parali in Namakkal District
2026_PWD_697993_1
NIT07-1/NKL/2026-27
Open Tender
Civil Works - Buildings
Percentage
Parali in Namakkal District
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹4,950
25 Aug 2026
25 Aug 2026
2 Sept 2026
25 Aug 2026
2 Sept 2026
25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of walls | |||||
| 1.01 | Brick / stone in clay walls under 3m high | 1.1 | m3 | 80.81 | ₹88.89 |
| 1.02 | Doors & windows including removal of frames, hinges and fastenings | 6.5 | m2 | 164.31 | ₹1,068.02 |
| 1.03 | Clean removal of Cement plaster from walls | 82 | m2 | 9.06 | ₹742.92 |
| 1.04 | Chipping of concrete and roughening the surface | 44.6 | m2 | 43.2 | ₹1,926.72 |
| 2 | Plain Cement Concrete 1:2:4 (one cement, two crushed stone sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.-Mixing by mechanical means | 2.7 | m3 | 6,457.55 | ₹17,435.39 |
| 3 | Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc. complete complying with standard specification and as directed by the departmental officers. | 54.15 | m2 | 286.3 | ₹15,503.15 |
| 4 | Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement and Three Plastering Sand) 10mm thick including mortar plasticizer at 200ml per 50Kg of cement used , hacking the surfaces and curing, etc., in all floors complying with standard specification and as directed by the departmental officers | 28.5 | m2 | 329.6 | ₹9,393.6 |
| 5 | Providing and Filling the tile joint with epoxy grout with following specification:Surface preparation including cleaning the joint to be free from dust and loose particles. Providing masking tape on either side of the tile joint edges and providing sealing the tile gap with epoxy tile joint grout and finishing neatly and as directed by the departmental officers. The rate inclusive of cost of materials and labour, etc. complete. | 25.6 | m2 | 438 | ₹11,212.8 |
| 6 | Finishing the top of roof with one course of machine pressed tiles of following size of
approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers | 9.1 | m2 | 1,342.35 | ₹12,215.38 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
HSCParali_Tencon_Nkl.pdf
Tender Documents • 1.43 MB
BOQ_839059.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].