Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.4 LAdmitted-Finance B 126 SWARAN JAYANTI VISTAR SANIGAWAN KANPUR | L1 | Admitted-Finance | |
| 2 | L2₹9.4 L+₹1,554 (0.17%)Admitted-Finance 00 PAREVAN GOPALAPUR MARIAHUN JAUNPUR UTTAR PRADESH 222137 | JAUNPUR | UTTAR PRADESH | 222137 | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S S.P. ENTERPRISES L2 | M/S MAA SHARDA ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Filling Pot Holes/Repair with 22.4-53mm. Gauge Hard stone Ballast & Stone dust of approved quarry compacted by road roller including its cost loading, unloading at site of work also including all taxes octroi, labour T&P & water allowance etc. Complete, required completion of the work. | 111 | CUM | 3,608 ₹4,00,488 | 3,607 ₹4,00,377 Lowest |
| 2.00 | Pacca Patch repair 13.2mm. And 11.2mm Dalla grit with bitumen, after heatiing the maxfalt upto required degree of temprature by dry fuel wood, pouring its on damage surface, expreading of mixed the grit over it reqular in shhape and ramming the surface by road roller completion of the work including cost of material labour and T&P etc. required for proper completion of work. | 1,443 | SQM | 373 ₹5,38,239 | 372 ₹5,36,796 Lowest |
Tender Value
₹9.4 L
EMD Value
₹19,000
Closing Date
3 Oct 2026, 12:00 pmClosed
EXECUTIVE ENGINEER
DPCD2 GHAZIPUR
REPAIR OF SERVICE ROAD OF RAJAPUR DY. IN PATCHES FROM KM 0.00 TO KM. 3.700
2026_UPIDC_1190071_7
01 EE/2026-27
Open Tender
Civil Works
Item Rate
15 days
MARDAH
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹19,000
Yes
12 Oct 2026
26 Sept 2026
3 Oct 2026
26 Sept 2026
3 Oct 2026
26 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Filling Pot Holes/Repair with 22.4-53mm. Gauge Hard stone Ballast & Stone dust of approved quarry compacted by road roller including its cost loading, unloading at site of work also including all taxes octroi, labour T&P & water allowance etc. Complete, required completion of the work. | 111 | CUM | - | - |
| 2 | Pacca Patch repair 13.2mm. And 11.2mm Dalla grit with bitumen, after heatiing the maxfalt upto required degree of temprature by dry fuel wood, pouring its on damage surface, expreading of mixed the grit over it reqular in shhape and ramming the surface by road roller completion of the work including cost of material labour and T&P etc. required for proper completion of work. | 1,443 | SQM | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.44 MB
BOQ_2242850.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .