Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹85.0 LAccepted-AOC 168 RAMBAGH PAYEEN SRINAGAR J K 190015 | SRINAGAR | JAMMU AND KASHMIR | 190015 | ₹85.0 L | 1 | Accepted-AOC LOWEST RATE QUOTED BY FIRM |
| 2 | 2₹1.0 Cr+₹19.6 L (23.0%)Rejected-Finance | ₹1.0 Cr+₹19.6 L (23.0%) | 2 | Rejected-Finance L2 |
| 3 | 3₹1.1 Cr+₹28.0 L (33.0%)Rejected-Finance | ₹1.1 Cr+₹28.0 L (33.0%) | 3 | Rejected-Finance L3 |
| 4 | 4₹1.2 Cr+₹33.8 L (39.8%)Rejected-Finance DURAM BAGH KARL PORA CHADOORA KASHMIR B O HARI SINGH HIGH STREET SRINAGAR 190019 | BUDGAM | JAMMU AND KASHMIR | 190019 | ₹1.2 Cr+₹33.8 L (39.8%) | 4 | Rejected-Finance L4 |
| 5 | 5₹1.3 Cr+₹45.2 L (53.2%)Rejected-Finance | ₹1.3 Cr+₹45.2 L (53.2%) | 5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | J R Infratech L5 | M/S N.A. AND SONS L4 | MIRAJ KHAN & COMPANY L1 | MEHRAJ UD DIN RATHER L2 | MEHJOOR CONSTRUCTION L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 mAll kinds of soil | 493 | cum | 1,78,682.92 ₹1,78,682.92 | 98,600 ₹98,600 | 69,513 ₹69,513 Lowest | 1,23,250 ₹1,23,250 | 1,57,760 ₹1,57,760 |
| 2.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and for all lift | 296 | Cum | 1,13,592.96 ₹1,13,592.96 | 29,600 ₹29,600 Lowest | 35,816 ₹35,816 | 44,400 ₹44,400 | 1,33,200 ₹1,33,200 |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) | 44 | cum | 3,54,275.24 ₹3,54,275.24 | 3,08,000 ₹3,08,000 | 1,69,400 ₹1,69,400 Lowest | 2,64,000 ₹2,64,000 | 2,11,200 ₹2,11,200 |
| 4.00 | Centring and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete. | 886 | sqm | 7,62,668.8 ₹7,62,668.8 | 3,54,400 ₹3,54,400 | 2,12,640 ₹2,12,640 Lowest | 3,10,100 ₹3,10,100 | 2,21,500 ₹2,21,500 |
| 5.00 | Centring and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers | 478 | Sqm | 4,24,201.1 ₹4,24,201.1 | 1,91,200 ₹1,91,200 | 1,95,980 ₹1,95,980 | 2,15,100 ₹2,15,100 | 1,29,060 ₹1,29,060 Lowest |
| 6.00 | Centring and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts. | 433 | Sqm | 3,95,805.3 ₹3,95,805.3 | 1,73,200 ₹1,73,200 | 2,27,325 ₹2,27,325 | 1,94,850 ₹1,94,850 | 1,21,240 ₹1,21,240 Lowest |
| 7.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo-Mechanically Treated bars of grade Fe-'500D or more | 39,750 | kg | 34,32,412.5 ₹34,32,412.5 | 39,35,250 ₹39,35,250 | 32,59,500 ₹32,59,500 Lowest | 35,37,750 ₹35,37,750 | 38,95,500 ₹38,95,500 |
| 8.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth levelThermo-Mechanically Treated bars of grade Fe-'500D or more | 3,375 | kg | 2,91,431.25 ₹2,91,431.25 | 3,34,125 ₹3,34,125 | 2,53,125 ₹2,53,125 Lowest | 3,00,375 ₹3,00,375 | 3,71,250 ₹3,71,250 |
| 9.00 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work;using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 1.10 times of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement All works upto plinth level. Concrete of M25 grade with minimum cement content of 330 kg /cum. | 318 | cum | 32,24,793.48 ₹32,24,793.48 | 30,21,000 ₹30,21,000 | 18,93,690 ₹18,93,690 Lowest | 29,25,600 ₹29,25,600 | 33,39,000 ₹33,39,000 |
| 10.00 | All works above plinth level upto floor V level Concrete of M25 grade with minimum cement content of 330 kg /cum | 27 | cum | 2,73,803.22 ₹2,73,803.22 | 2,83,500 ₹2,83,500 | 1,68,723 ₹1,68,723 Lowest | 2,48,400 ₹2,48,400 | 2,64,600 ₹2,64,600 |
Tender Value
₹1.5 Cr
EMD Value
₹3.1 L
Closing Date
13 Oct 2025, 4:00 pmClosed
Commandant Engineer JK Zone HQR CRPFJammu
Office of the SDG CRPF JK Zone Jammu
Construction of damaged boundary wall 500 Mtr at BCS CRPF Rambagh Campus Srinagar JK
2025_CRPF_880095_1
B V 8 2025 26 JKZ C CELL BCS Rambagh Boundary wall
Open Tender
Civil Works
Works
180 days
BCS CRPF Rambagh Campus Srinagar JK
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3.1 L
18 Nov 2025
4 Oct 2025
14 Oct 2025
4 Oct 2025
13 Oct 2025
4 Oct 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .