| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 CrAccepted-AOC JHANSI | JHANSI | UTTAR PRADESH | 284001 | ₹9.9 Cr | L1 | Accepted-AOC Financial bid accepted |
| 2 | L2₹11.5 Cr+₹1.6 Cr (16.0%)Rejected-Finance JHANSI | JHANSI | UTTAR PRADESH | 284001 | ₹11.5 Cr+₹1.6 Cr (16.0%) | L2 | Rejected-Finance L2 |
Tender Value
Refer Docs
EMD Value
₹30 L
Closing Date
7 Mar 2025, 12:00 pmClosed
S.E, Jhansi Circle, P.W.D., Jhansi
Office of the S.E, Jhansi Circle, P.W.D., Jhansi
Widening and strengthening of Gangavali link road in km 1 to 13(ODR). (Including 5 years maintenance cost)
2025_CEJNS_1011906_1
9095/44 C-jhs-cir/24, Date 11.12.2024
Open Tender
Civil Works - Roads
Item Rate
365 days
Jhansi
Please refer Tender documents.
3 documents required · 3 mandatory
₹7,950
₹30 L
Yes
Office of the S.E, Jhansi Circle, P.W.D., Jhansi
26 Mar 2025
28 Feb 2025
7 Mar 2025
28 Feb 2025
7 Mar 2025
28 Feb 2025
1 Mar 2025
Amount
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirment of table 300-2. As per Ref. to MoRTH Spec no-301+305.
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.
Construction of embankment with approved material obtained from roadway with all lifts ane leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2 complete as per M.O.R.T.&H. specification clause 305. complete in all respects.
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401.
Providing, laying, Spreading & compacting graded stone aggregate (WMM) with 1% OPC cement, (ACC, Birla Uttam, J.K. Super Brand and 3.5% Emulsion specification including premixing the material with water at OMC in mechnical mix plant carriage of mixed material by tipper to site laying in uniform layer with paver in sub-base/coarse on well prepared surface and compacting withvibratory roller to achieve the desire density.
Providing and applying tack coat with bitumen VG-10 using pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause No. 507.
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
Excavation in Foundation in ordinary soil (Loam clay, or sand) including lift upto 1.5 metre (5 fts.) and lead upto 30 m (100 fts) & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30 m. (100 fts) from the foundation trenches (S.I. No.251).
Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 km.(5 miles) from the site of work and including watering, dressing etc. Rate to include cost of all materials, labour and T&P etc. required for proper completion of the work. (Rate is Including Royality) (S.I. No.255).
Cement concrete with 4 cm (1.5") gauge approved stone ballast, approved coarse sand and cement in the proportion of 6 : 3 : 1 including supply of all materials, labour and T & P etc. required for proper completion of the work. (S.I. No.280).
Random course rubble masonary in 1:4 cement and coarse sand mortar in foundation and plinth, including supply of material as order by the Engineer-in-charge, labour, T&P etc, required for proper completion of work (Ch.-8, Additional Item-2).
Providing and Laying Reinforced cement concrete pipe NP3/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . (350 mm dia).
Providing and Laying Reinforced cement concrete pipe NP3/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets. (1000 mm dia).
Raised pointing with cement and Fine sand 1.25 F.M. mortar on brick work in proportion of 1 :2, including supply of all material, labour and T & P etc. required for proper completion of the work (S.I. No.577).
Cement concrete with 2 cm gauge approved stone ballast, approved coarse sand and cement in the proportion of 4 : 2 : 1 including supply of all materials, labour and T & P etc. required for proper completion of the work. (S.I. No.279 (New Item-a)).
R.C.C work with cement approved coarse sand and 2 cm. (3/4") gauge approved stone ballast in the proportion of 1:1.5:3 in lintels of doors and windows excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.I binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour& T&P etc. required for proper completion of the work. Binding wire cost being included in the item. (S.I. No-283(i).
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage & overlapping & hooks. (S.I. No. 504)
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. as per MORT&H Specification No. 304, Sl. No. 15.01
Fillling in foundation trenches as per drawing and technical specification Clause 305.3.9
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 M-25
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 M-30
Supplying, fitting, and placing HYSD bar reinforcement in substructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Drainage spouts complete as per drawing and technical specifications Clause 1209
Dewatering of ground water for trenches with hire charges operational & fule charges of pump with oprator etc.. Complete as per direction of E/i.
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. (PCC grade M 20) (Case-I: Using concrete Mixer (as per MoRT&H Specification No. 1500, 1700 & 2100) Sl. No. 15.11 B
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications No. 1400 & 2200 Sl. No. 15.10
Plain/Reinforced Cement Concrete for wall and slab etc. complete as per Drawing and Technical Specifications. (RCC Grade M35) (as per drawing and Technical specification MORT&H no. 1500, 1600 & 1700 Sl. No. 15.12D)
Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall. as per drawing and Technical specifications MORT&H no. 2507.2 Sl. No. 16.11)
Pointing with cement mortar (1:3) on brick work in substructure as per Technical Specifications MORT&H no. 1300 & 2200 Sl. No. 15.08)
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification MORT&H no. 2504 Sl. No. 16.05)
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing face. Complete as per drawing and Technical Specifications Clauses 2706 & 2200 Sl. No. 15.14
Kilometer stone.
5th Kilometer stone.
Hectometer.
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st year maintenance cost (0%)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost (0.25% Construction Cost)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost (0.50% Construction Cost)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost (0.75% Construction Cost)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost (1% Construction Cost)
M/S ATUL GRAM VIKAS SANSTHAN (BID ID -5024014)
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .