Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.6 LAccepted-AOC | ₹11.6 L | L1 | Accepted-AOC AWARDED FOR BEING L1 BIDDER |
| 2 | L2₹12.0 L+₹39,283.22 (3.40%)Rejected-Finance AT JAGANNATH COLONY PO SOUTH BALANDA ANGUL ODISHA 759116 | ANGUL | ANGUL | ODISHA | 759116 | ₹12.0 L+₹39,283.22 (3.40%) | L2 | Rejected-Finance REJECTED FOR NOT BEING L1 BIDDER |
| 3 | L3₹14.1 L+₹2.5 L (21.8%)Rejected-Finance AT PO DANARA PS COLLIERY DIST ANGUL ODISHA 759103 | DANARA | ANGUL | ODISHA | 759103 | ₹14.1 L+₹2.5 L (21.8%) | L3 | Rejected-Finance REJECTED FOR NOT BEING L1 BIDDER |
| 4 | L4₹16.7 L+₹5.1 L (44.2%)Rejected-Finance AT PO DANARA PS COLLIERY TALCHER DIST ANGUL ODISHA 759103 | TALCHER | ANGUL | ODISHA | 759103 | ₹16.7 L+₹5.1 L (44.2%) | L4 | Rejected-Finance REJECTED FOR NOT BEING L1 BIDDER |
Tender Value
₹17.1 L
EMD Value
₹21,400
Closing Date
16 May 2026, 5:00 pmClosed
STAFF OFFICER (CIVIL), HINGULA AREA
SO (CIVIL), OFFICE OF THE GM, HINGULA AREA, P.O._N.S.NAGAR, TALCHER, ANGUL_759148, ODISHA, INDIA
Construction of 03 Nos Ladies Toilets at Field time office, E and M Section and Blasting Section of Balram OCP Under Hingula Area.
2026_MCL_358917_1
MCL/GM(HA)/Civil/e-Tender/ 26-27/17 Dt.29.04.2026
Open Tender
Civil Works - Others
Percentage
90 days
BALRAM OCP
AS PER NIT
3 documents required · 3 mandatory
₹21,400
30 Jul 2026
6 May 2026
18 May 2026
6 May 2026
16 May 2026
6 May 2026
6 May 2026 - 9 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Item Description | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | 57.71 | Cum | 217 | ₹12,523.07 |
| 1.02 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 11.56 | Cum | 910.15 | ₹10,521.33 |
| 1.03 | Providing and laying in position excluding cement concrete of level: specified grade the cost of centering and shuttering - All work up to plinth 1:3:6 (1 Cement : 3 coarse sand (zone-Ill) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 11.56 | Cum | 5,359.15 | ₹61,951.77 |
| 1.04 | Brick work with Fly Ash Brick (230x115x75 mm size) bricks of class designation 10 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) | 7.11 | Cum | 5,457.4 | ₹38,802.11 |
| 1.05 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3(1 cement: 1.5 coarse sand (zone-Ill) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 8.47 | Cum | 7,009.05 | ₹59,366.65 |
| 1.06 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. | 997 | Kg | 101.4 | ₹1,01,095.8 |
| 1.07 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 7.46 | Cum | 8,090.3 | ₹60,353.64 |
| 1.08 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15 degree landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 6.31 | Cum | 8,464.45 | ₹53,410.68 |
| 1.09 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. | 631 | Kg | 101.4 | ₹63,983.4 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.39 MB
Tendernotice_2.pdf
PDF • 2.46 MB
BOQ_371785.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .