Tender Value
₹13.1 Cr
EMD Value
₹26.1 L
Closing Date
28 Jul 2026, 3:00 pm
[i] Provision of Automatic signalling between WFD-JTJ section-TRD works, [ii] SBC- JTJ Section: Proposed construction of RUB at trespassing location at km 339/300- 400 between HDIH-KJM stations in ADEN/SBC sub-division- TRD works[iii] SBC-JTJ Section: Proposed construction of Pedestrian subway at Km.230/000-100 between PU-MAR stations in ADEN/BWT Sub-division [iv]Recoupment of ballast at TSS,SP/SSP and provison of cable trench covers in SBC-JTJ Section.[v]Bifurcation of elementary section at SKPT. [vi]Provision of earthing and bonds at SSP/SP,FOB and Platform shelters in SBC-JTJ Section.
B-TRD-29-2026-27-OT-18
B-TRD-29-2026-27-OT-18
Open
18 Months
Unknown (Unspecified Location)
₹0
₹26.1 L
6 Jul 2026
6 Jul 2026
14 Jul 2026
and Platform shelters in SBC-JTJ Section
Item- 01 Supply of Masonary RCC enclosure for earth pit
BANGALORE DIVISION-ELECTRICAL/SOUTH WESTERN RLY
S No. Item Description of Item Unit Qty Rate Amount
1 01 Supply of Masonary RCC enclosure for earth Numbers 230.00 548.00 126040.00
pit in square box of size 15inches x 15inches,
height of 12 inches having wall thickness of 1
1/2 inch (One and half inch) inch and
Masonry RCC covers of size 15 inches x 15
inches x 1 1/2 inch(One and half inch) . Both
enclosure and cover are to be steel
Item- 02 E2- earth leads 75mm X 8 mm mild steel laid in the ground
S No. Item Description of Item Unit Qty Rate Amount
1 02 Supply and erection of earth leads 75mm X 8 Metre 624.00 413.49 258017.76
mm mild steel laid in the ground
Schedule Schedule 08-Section -1(General)
Item- 01 Section -1(General):Bifurcation of elementary section at SKPT
S No. Item Description of Item Unit Qty Rate Amount
1 01 31(a)-Transfer of equipment from one mast Each 4.00 2302.00 9208.00
or support to another-Supply
2 02 31(a)-Transfer of equipment from one mast Each 4.00 4319.00 17276.00
or support to another.-erection
mast or support to another - extra on
erection rate for work under a power block
Schedule Schedule 09- Section -2(Concrete)(General)
Item- 01 Section -2(Concrete)(General):Bifurcation of elementary section at SKPT
S No. Item Description of Item Unit Qty Rate Amount
1 01 2(bz)-Concrete for foundation and plinth in cum 14.00 6227.00 87178.00
other than hard soil and rock-Supply
2 02 2(bz)-Concrete for foundation and plinth in cum 14.00 2339.00 32746.00
other than hard soil and rock-Erection
Schedule Schedule 10- Section -3(Ferrous)
Item- 01 Section -3(Ferrous): Bifurcation of elementary section at SKPT
S No. Item Description of Item Unit Qty Rate Amount
1 01 3(b)(ii)-Supply of Structure steel (traction MT 2.32 97468.00 226125.76
masts) fabricated and galvanised of all Type
: B-Series Mast.
2 02 3(b)(ii)-erection of Structure steel (traction MT 2.32 3393.00 7871.76
masts) fabricated and galvanised of all Type
: B-Series Mast.
3 03 3(b)(iii)-Erection of special fabricated and MT 1.00 9853.00 9853.00
galvanised steel structures other than Portals
& traction- Masts not covered under items
4 04 3( c)-Supply only of fabricated steel other MT 1.00 122247.00 122247.00
6 06 3(i)-erection of 25kV Caution Board /Plate Each 2.00 139.00 278.00
7 07 4(a)(i)-Supply without insulator of Single Each 6.00 10927.00 65562.00
bracket assembly.
8 08 4(a)(i)- erection of Single bracket assembly. Each 6.00 1389.00 8334.00
BANGALORE DIVISION-ELECTRICAL/SOUTH WESTERN RLY
(traction masts) fabricated and galvanised of
all Type : B-Series Mast - extra on erection
rate for work under a power block
12 12 32/3(b)(iii)-erection of special fabricated and MT 1.00 9853.00 9853.00
galvanised steel structures other than Portals
& traction- Masts not covered under items
3(b)(i) & 3(b)(ii) - extra on erection rate for
work under a power block
assembly- extra on erection rate for work
under a power block
(traction masts) fabricated and galvanised of
all Type : B-Series Mast -extra on erection
rates for steel work manually
15 15 33/3(b)(iii)-erection of special fabricated and MT 0.20 4926.50 985.30
galvanised steel structures other than Portals
& traction- Masts not covered under items
3(b)(i) & 3(b)(ii) -extra on erection rates for
steel work manually
Schedule Schedule 11-Section -5(Insulators):
Item- 01 Section -5(Insulators):Bifurcation of elementary section at SKPT
S No. Item Description of Item Unit Qty Rate Amount
1 01 4(ax)(i)-Supply of Insulators for items 4(a)(i) Each 6.00 4311.00 25866.00
& 4(a)(iii) Stay Arm Porcelain (CD-1050 mm)
2 02 4(ax)(iv)-Supply of Insulators for items 4(a)(i) Each 6.00 4136.00 24816.00
& 4(a)(iii) Bracket Porcelain (CD-1050 mm)
Schedule Schedule 12-Non-SOR Items: Bifurcation of elementary section at SKPT
Item- 01 E1:Preparation of Traction Working Rule Diagram along with working Instructions
S No. Item Description of Item Unit Qty Rate Amount
1 01 Preparation of Traction Working Rule Each 1.00 11417.98 11417.98
Diagram along with working Instructions
Item- 02 E2:Supply and Installation of Traction working Rule Diagram Boards
S No. Item Description of Item Unit Qty Rate Amount
1 02 Supply and Installation of Traction working Square 24.00 1222.70 29344.80
Rule Diagram Boards Foot
Item Breakup - 01-PART - B MAJOR STEEL ITEMS
3(a)(ii)-Supply only for fabricated mast K,B,S, MT series etc.
3(b)(i) -Supply of fabricated steel work other MT than masts
3(b)(i)-Erection of fabricated steel work other MT than masts by manual
3 © -Supply of fabricated steel work(SPS).
3 ©-Erection of fabricated steel work(SPS).
Undertaking work under power block on item MT No.03
Undertaking work under power block on item MT No.05 Total 38803425.00 PART - B MAJOR STEEL ITEMS:SBC-JTJ Section: Proposed construction of RUB at trespassing location Item- 02 at km 339/300-400 between HDIH-KJM stations in ADEN/SBC sub-division- TRD works S No. Item Description of Item Unit Qty Rate Amount No
3(a)(ii)-Supply only for fabricated mast K,B,S, MT series etc.
3(b)(i)-Supply of fabricated steel work other MT than masts
3(b)(i)-Erection of fabricated steel work other MT than masts
3(c)-Supply of fabricated steel work(SPS).
3(c)-Erection of fabricated steel work(SPS).
Undertaking work under power block on item MT No.10
Undertaking work under power block on item MT No.12 Total 926827.00 PART - B MAJOR STEEL ITEMS: SBC-JTJ Section: Proposed construction of Pedestrian subway at Item- 03 Km.230/000-100 between PU-MAR stations in ADEN/BWT Sub-division. S No. Item Description of Item Unit Qty Rate Amount No
3(a)(ii)-Supply only for fabricated mast K,B,S, MT series etc.
3 (c) -Supply of fabricated steel work(SPS).
3 (c)-Erection of fabricated steel work(SPS).
Undertaking work under power block on item MT No.17 Total 122790.20
Item Breakup - 02-PART-C FOUNDATION ITEMS
2a(ii)-Concrete in rocky soil
2b.-Concrete in other than hard soil and rock cum Total 13054984.00 PART - C FOUNDATION ITEMS: SBC-JTJ Section: Proposed construction of RUB at trespassing location Item- 02 at km 339/300-400 between HDIH-KJM stations in ADEN/SBC sub-division- TRD works S No. Item Description of Item Unit Qty Rate Amount No
2 a(i)-Foundation and plinth - Concrete in cum hard soil
2b-Concrete in other than hard soil and rock Total 307624.00 PART - C FOUNDATION ITEMS:SBC-JTJ Section: Proposed construction of Pedestrian subway at Item- 03 Km.230/000-100 between PU-MAR stations in ADEN/BWT Sub-division. S No. Item Description of Item Unit Qty Rate Amount No BANGALORE DIVISION-ELECTRICAL/SOUTH WESTERN RLY
2a(i)-For foundation anf plinth-Concrete in cum hard soil
2b.-Concrete in other than hard soil and rock cum Total 70115.00
Item Breakup - 03-PART - D - OHE / PSI ITEMS OTHER THAN COPPER AND MAJOR STEEL ITEMS
1a-Preparation of designs and drawings for Per Track over head equipment and verification of KM Purchasers Engineering Plan.
1 c-Preparation of station working diagram and working instruction
3(a) (i)-Erection of traction masts and main MT masts of switching stations, booster stations and L .T .supply Transformer stations by manual
3(e)-Supply of a Guy rod assembly
3(e)-Erection of a Guy rod assembly
4a(i)(a)-Supply of a single bracket assembly
4a(i)(a)-erection of a single bracket assembly Each
8v)-Supply of regulating equipment (3 pulley Each type) with counter-weight assembly for conventional OHE.
8v)-Erection of regulating equipment (3 Each pulley type) with counter-weight assembly for conventional / composite OHE.
8b(ii)-Supply of materials for termination of Each Double over head equipment conductor
8b(ii)-Erection of materials for termination of Each Double over head equipment conductor
8b(iv)-Supply of materials for termination of Each AC wire on one end.
8b(iv)-Erection of materials for termination of Each AC wire on one end.
9a-Supply of anticreep with galvanised steel Each wire
9a-Erection steel wire
11a(i)-Supply of a cut insulator
11a(i)-Erection of a cut insulator
11a ii)-Supply of a suspension insulator
11a ii)-Erection of a suspension insulator
11(b)-Supply of 25KV post insulator
11(b)-Erection of 25KV post insulator
12a(i)-Supply of a section insulator assembly Each
12a(i)-Erection assembly
13a(i)-Supply of a 25 kV single pole isolator Each without earth contact assembly.
13a(i)-Erection of a 25 kV single pole isolator Each without earth contact assembly.
15a-Supply of a copper jumper
15a-Erection of a copper jumper
16a-Supply of a structure bond
16a-Erection of a structure bond
17a-Supply of a single earth electrode
17a-Erection of a single earth electrode
17b-Supply of earth bus BANGALORE DIVISION-ELECTRICAL/SOUTH WESTERN RLY
17b-Erection of earth bus
22 b-Supply of an Iron clad 250 Volts AC Fuse Each Box
22 b-Erection of an Iron clad 250 Volts AC Each Fuse Box
27(a)(i)-Supply of 10 KVA capacity LT supply Each transformers
27(a)(i)-Erection, oil filtration, testing and Each commissioning of LT supply transformers
27(c)(i)-Supply of LT control board for 10 KVA Each AT location as per RDSO spec. No. TI/SPC/PSI/CLS/0020 with A & C slip No. 1 (8/2003)
27(c)(i)-Erection of LT control board for Each 10KVA AT location as per RDSO spec. No. TI/SPC/PSI/CLS/0020 with A & C slip No. 1 (8/2003)
28(i)-Supply of 25 kV fuse switch
28(i)-Erection of 25 kV fuse switch
30b(iii)-Supply of anti -climbing device, etc Each for LT. Supply transformer stations
30b(iii)-Erection of anti -climbing device, etc Each for LT. Supply transformer stations
31a-Transfer of equipment from one mast or Each support to another
31 d-Dismantling of overhead equipment
31 f-Splicing and extension of an anchored Each over head equipment
31g.-Dismantling of a section insulator
31i-Dismantling of an isolator
31(j)-Dismantling of a pedestal/pin insulators. Each
31 (k)-Dismantlement structure by cutting
31 (L)-Dismantlement of OHE mast structure Each of breaking the foundation
31 n-Dismantling of guy rod
31 p-Releasing of portal power/non power block
31( r)-Releasing of plinth/ pole mounted AT Each along with drop out fuse, fencing panels and LAs etc.
Erection of PTFE Neutral section assembly Numbers Erection
Undertaking work under power block on item MT No.3
Undertaking work under power block on item Each No.5
Undertaking work under power block on item Each No.7
Undertaking work under power block on item Each No.9
Undertaking work under power block on item Each No.11
Undertaking work under power block on item Each No.13
Undertaking work under power block on item Each No.15
Undertaking work under power block on item Each No.17
Undertaking work under power block on item Each No.19 BANGALORE DIVISION-ELECTRICAL/SOUTH WESTERN RLY
Undertaking work under power block on item Each No.21
Undertaking work under power block on item Each No.23
Undertaking work under power block on item Each No.25
Undertaking work under power block on item Each No.27
Undertaking work under power block on item Each No.37
Undertaking work under power block on item Each No.41
Undertaking work under power block on item Numbers No.43
Undertaking work under power block on item Each No.44
Undertaking work under power block on item Kilometre No.45
Undertaking work under power block on item Each No.46
Undertaking work under power block on item Each No.47
Undertaking work under power block on item Each No.48
Undertaking work under power block on item Each No.49
Undertaking work under power block on item Each No.50
Undertaking work under power block on item Each No.51
Undertaking work under power block on item Each No.52
Undertaking work under power block on item Numbers No.55 Total 41864469.00 PART - D - OHE / PSI ITEMS OTHER THAN COPPER AND MAJOR STEEL ITEMS: SBC-JTJ Section: Item- 02 Proposed construction of RUB at trespassing location at km 339/300-400 between HDIH-KJM stations in ADEN/SBC sub-division- TRD works S No. Item Description of Item Unit Qty Rate Amount No
1a-Preparation of designs and drawings for Per Track over head equipment and verification of KM Purchasers Engineering Plan.
3(a)(i)-Erection of traction masts and main MT masts of switching stations, booster stations and L .T .supply Transformer stations by manual
3(e)-Supply of a Guy rod assembly
3(e)-Erection of a Guy rod assembly
4ai)(a)-Supply of a single bracket assembly
4ai)(a)-Erection of a single bracket assembly Each
8v)-Supply of regulating equipment (3 pulley Each type) with counter-weight assembly for conventional OHE.
8v)-Erection of regulating equipment (3 Each pulley type) with counter-weight assembly for conventional / composite OHE.
8 b (ii)-Supply of materials for termination of Each Double over head equipment conductor
8 b (ii)-Erection of materials for termination Each of Double over head equipment conductor
8b(iv)-Supply of materials for termination of Each AC wire on one end. BANGALORE DIVISION-ELECTRICAL/SOUTH WESTERN RLY
8b(iv)-Erection of materials for termination of Each AC wire on one end.
9a-Supply of anticreep with galvanised steel Each wire
9a-Erection steel wire
11a(i)-Supply of a cut insulator
11a(i)-Erection of a cut insulator
11b-Supply of 25kV Post insulator
11b-Erection of 25kV Post insulator
13a(i)-Supply of a 25 kV single pole isolator Each without earth contact assembly.
13a(i)-Erection of a 25 kV single pole isolator Each without earth contact assembly.
15a-Supply of a copper jumper
15a-Erection of a copper jumper
16a-Supply of a structure bond
16a-Erection of a structure bond
31 a.-Transfer of equipment from one mast Each or support to another
Each 31(h)-Slewing of equipment Span
31 (k)-Dismantlement structure by cutting
31(n)-Dismantling of guy rod
31(p)-Releasing of portal power/non power block
Undertaking work under power block on item MT No.83
Undertaking work under power block on item Each No.85
Undertaking work under power block on item Each No.87
Undertaking work under power block on item Each No.89
Undertaking work under power block on item Each No.91
Undertaking work under power block on item Each No.93
Undertaking work under power block on item Each No.95
Undertaking work under power block on item Each No.97
Undertaking work under power block on item Each No.99
Undertaking work under power block on item Each No.101
Undertaking work under power block on item Each No.103
Undertaking work under power block on item Each No.106
Undertaking work under power block on item Each No.107 Span
Undertaking work under power block on item Each No.108
Undertaking work under power block on item Each No.109 Total 606972.00 PART - D - OHE / PSI ITEMS OTHER THAN COPPER AND MAJOR STEEL ITEMS: SBC-JTJ Section: Item- 03 Proposed construction of Pedestrian subway at Km.230/000-100 between PU-MAR stations in ADEN/BWT Sub-division. BANGALORE DIVISION-ELECTRICAL/SOUTH WESTERN RLY S No. Item Description of Item Unit Qty Rate Amount No
1a-Preparation of designs and drawings for Per Track over head equipment and verification of KM Purchasers Engineering Plan.
3a(i)-Erection of traction masts and main MT masts of switching stations, booster stations and L .T .supply Transformer stations by manual
3(e)-Supply of a Guy rod assembly
3(e)-Erection of a Guy rod assembly
4a(i)-Supply of a single bracket assembly
4a(i)-Erection of a single bracket assembly
8 b(ii)-Supply of materials for termination of Each Double over head equipment conductor
8 b(ii)-Erection of materials for termination of Each Double over head equipment conductor
8(v)-Supply of regulating equipment (3 pulley Each type) with counter-weight assembly for conventional OHE.
8(v)-Erection of regulating equipment (3 Each pulley type) with counter-weight assembly for conventional / composite OHE.
16a-Supply of a structure bond
16a-Erection of a structure bond
31 (k)-Dismantlement structure by cutting
31d-Dismantling of overhead equipment
31f-Splicing and extension of an anchored Each over head equipment
Undertaking work under power block on item MT No.127
Undertaking work under power block on item Each No.129
Undertaking work under power block on item Each No.131
Undertaking work under power block on item Each No.133
Undertaking work under power block on item Each No.135
Undertaking work under power block on item Each No.138
Undertaking work under power block on item Kilometre No.139
Undertaking work under power block on item Each No.140 Total 217371.40 PART - D - OHE / PSI ITEMS OTHER THAN COPPER AND MAJOR STEEL ITEMS: Recoupment of ballast Item- 04 at TSS,SP/SSP and provison of cable trench covers in SBC-JTJ Section S No. Item Description of Item Unit Qty Rate Amount No
31t.-Spreading of 20 mm Ballast in the cum SSP/SP Switch Yard - supply.
31t.-Spreading of 20 mm Ballast in the cum SSP/SP Switch Yard - spreading
Supply and erection Cable trench cover Total 237999.00 PART - D - OHE / PSI ITEMS OTHER THAN COPPER AND MAJOR STEEL ITEMS: Provision of earthing Item- 05 and bonds at SSP/SP,FOB and Platform shelters in SBC-JTJ Section S No. Item Description of Item Unit Qty Rate Amount No
17a-Supply of a single earth electrode BANGALORE DIVISION-ELECTRICAL/SOUTH WESTERN RLY
17a-Erection of a single earth electrode Total 290890.00 Schedule 04-Part E - Other than part A, B, C and D : Provision of Automatic signalling between WFD-
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
I_CT_GCC-
ATTACHMENT
18InstructionstoTenderer.pdf
ATTACHMENT
18ExplanatoryNotesdt030726.pdf
ATTACHMENT
18PriceandPayments.pdf
ATTACHMENT
18Generalconditionsofcontract.pdf 18 General Conditions of Contract
ATTACHMENT
18Preamble_1.pdf
ATTACHMENT
18FormsofTender_1.pdf
ATTACHMENT
ACS12345678910and11forGCC.pdf ACS 12345678910 and 11 for GCC
ATTACHMENT
GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27_04_22_2.pdf
ATTACHMENT
ACS12345678910and11forGCC.pdf
ATTACHMENT
18Generalconditionsofcontract.pdf
ATTACHMENT
Download all tender documents and submit your bid