| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹42.2 LAccepted-AOC AT NAKULABASAPUR PO HENSAMULA TALCHER DIST ANGUL ODISHA PIN 759103 | TALCHER | ANGUL | ODISHA | 759103 | ₹42.2 L Quoted ₹35.8 L | L-1 | Accepted-AOC ACCEPTED AND AWARDED BY COMPETENT AUTHORITY |
| 2 | L-2₹41.5 LRejected-Finance AT AMBICA SAHI WARD NO 05 PO BARIPADA DIST MAYURBHA PIN 757001 | MAYURBHANJ | ODISHA | 757001 | ₹41.5 L | L-2 | Rejected-Finance SINCE THE BIDDER IS NOT L-1 |
| 3 | L-3₹61.7 LRejected-Finance BHUBANESWARI BHUBANESWARI ODISHA | ₹61.7 L | L-3 | Rejected-Finance SINCE THE BIDDER IS NOT L-1 |
| 4 | L-4₹63.5 LRejected-Finance AT DERA COLLIERY TALCHER ANGUL ODISHA 759100 | TALCHER | ANGUL | ODISHA | 759100 | ₹63.5 L | L-4 | Rejected-Finance SINCE THE BIDDER IS NOT L-1 |
| Sl No | Description | Qty | Unit | M/S.RAKHI ELECTRICALS L1 | Santosh Kumar Sahoo L2 | M/S DIVYA SHAKTI ENTERPRISES L3 | OMM SHANKAR TRANSPORT L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Installation and fitting of short length delivery(Including bends, short pieces, taper pieces & fitting of Sluice valve and NRV) and complete suction pipeline of pump installed on pontoon/surface by fitting short/long pieces, bend, taper, reducer, foot valve etc with supporting where ever required for successful operation of pump as per direction of engineer in charge. The work includes transportation/shifting of foot valve and other required items from pump section workshop to work site. | 60 | set | 3,000 ₹1,80,000 Lowest | 3,600 ₹2,16,000 | 4,850 ₹2,91,000 | 5,000 ₹3,00,000 |
| 2.00 | Dismantling of short length delivery (Including bends, short pieces, taper pieces & fitting of Sluice valve and NRV) and complete suction pipeline of pump installed on pontoon/surface by dismantling/seperating short/long pieces, bend, taper, reducer and foot valve etc all complete as per direction of engineer in charge.The work also include submitting dismantled material to pump section workshop if required. | 60 | set | 2,500 ₹1,50,000 Lowest | 3,380 ₹2,02,800 | 4,150 ₹2,49,000 | 4,250 ₹2,55,000 |
| 3.00 | Extension/shortening of suction by providing short/long piece/bend/taper piece along with dismantling and refitting of foot valve with its section as per requirement including aligning and providing support wherever required for successful operation of pump as per direction of engineer in charge.The work includes transportation/shifting of foot valve and other required items from pump section workshop to work site and vice-versa. | 50 | set | 2,200 ₹1,10,000 Lowest | 3,000 ₹1,50,000 | 4,000 ₹2,00,000 | 4,250 ₹2,12,500 |
| 4.00 | Dismantling of Suction & Foot valve, 8 inch as per direction of engineer in charge.The work includes transportation/shifting of foot valve and other required items from pump section workshop to work site and vice-versa. | 30 | set | 1,000 ₹30,000 Lowest | 2,000 ₹60,000 | 2,360 ₹70,800 | 2,500 ₹75,000 |
| 5.00 | Dismantling of suction & Foot valve with not & bolts, 10 inch as per direction of engineer in charge.The work includes transportation/shifting of foot valve and other required items from pump section workshop to work site and vice-versa. | 20 | set | 1,575 ₹31,500 Lowest | 3,000 ₹60,000 | 2,980 ₹59,600 | 3,200 ₹64,000 |
| 6.00 | Dismantling of suction & Foot valve with not & bolts, 12 inch as per direction of engineer in charge.The work includes transportation/shifting of foot valve and other required items from pump section workshop to work site and vice-versa. | 10 | set | 1,800 ₹18,000 Lowest | 3,000 ₹30,000 | 3,650 ₹36,500 | 3,850 ₹38,500 |
| 7.00 | Fitting of suction & Foot valve with not & bolts, 08 inch as per direction of engineer in charge.The work includes transportation/shifting of foot valve and other required items from pump section workshop to work site and vice-versa. | 30 | set | 1,800 ₹54,000 | 1,700 ₹51,000 Lowest | 2,450 ₹73,500 | 2,550 ₹76,500 |
| 8.00 | Fitting of suction & Foot valve with not & bolts, 10 inch as per direction of engineer in charge.The work includes transportation/shifting of foot valve and other required items from pump section workshop to work site and vice-versa. | 20 | set | 2,500 ₹50,000 | 2,100 ₹42,000 Lowest | 3,000 ₹60,000 | 3,250 ₹65,000 |
| 9.00 | Fitting of Foot valve ,12 inch as per direction of engineer in charge.The work includes transportation/shifting of foot valve and other required items from pump section workshop to work site and vice-versa. | 10 | set | 2,500 ₹25,000 Lowest | 2,500 ₹25,000 Lowest | 3,650 ₹36,500 | 3,800 ₹38,000 |
| 10.00 | Dismantling & Installation of Non Return Valve or Gate/sluice valve with short pieces, bend, taper etc including aligning, surface leveling and supporting where ever required all complete in mines area as per direction of engineer in charge. (6 inch) | 20 | set | 250 ₹5,000 Lowest | 420 ₹8,400 | 650 ₹13,000 | 700 ₹14,000 |
Tender Value
₹70.9 L
EMD Value
₹88,600
Closing Date
25 Mar 2026, 5:00 pmClosed
SO EnM LINGARAJ AREA
OFFICE OF THE GENERAL MANAGER LINGARAJ AREA, AT/PO- DEULBERA COLLIERY, DIST- ANGUL, ODISHA, 759102
Day to day works related to dismantling, shifting, laying, fitting, commissioning, installation of pipelines/pumps in the mines for dewatering, tanker loading etc. as and when required basis for the period of 365 days as per the direction of engineer
2026_MCL_355995_1
GM/LA/SO/EnM/e-Ten/25-26/63 DT-09.03.2026
Open Tender
Miscellaneous Works
Item Rate
365 days
LINGARAJ OCP
AS PER NIT
5 documents required · 5 mandatory
₹88,600
11 Jul 2026
9 Mar 2026
27 Mar 2026
10 Mar 2026
25 Mar 2026
10 Mar 2026
10 Mar 2026 - 18 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Installation and fitting of short length delivery(Including bends, short pieces, taper pieces & fitting of Sluice valve and NRV) and complete suction pipeline of pump installed on pontoon/surface by fitting short/long pieces, bend, taper, reducer, foot valve etc with supporting where ever required for successful operation of pump as per direction of engineer in charge. The work includes transportation/shifting of foot valve and other required items from pump section workshop to work site. | 60 | set | 4,816.2 | ₹2,88,972 |
| 2 | Dismantling of short length delivery (Including bends, short pieces, taper pieces & fitting of Sluice valve and NRV) and complete suction pipeline of pump installed on pontoon/surface by dismantling/seperating short/long pieces, bend, taper, reducer and foot valve etc all complete as per direction of engineer in charge.The work also include submitting dismantled material to pump section workshop if required. | 60 | set | 4,172.2 | ₹2,50,332 |
| 3 | Extension/shortening of suction by providing short/long piece/bend/taper piece along with dismantling and refitting of foot valve with its section as per requirement including aligning and providing support wherever required for successful operation of pump as per direction of engineer in charge.The work includes transportation/shifting of foot valve and other required items from pump section workshop to work site and vice-versa. | 50 | set | 3,942.2 | ₹1,97,110 |
| 4 | Dismantling of Suction & Foot valve, 8 inch as per direction of engineer in charge.The work includes transportation/shifting of foot valve and other required items from pump section workshop to work site and vice-versa. | 30 | set | 2,355.78 | ₹70,673.4 |
| 5 | Dismantling of suction & Foot valve with not & bolts, 10 inch as per direction of engineer in charge.The work includes transportation/shifting of foot valve and other required items from pump section workshop to work site and vice-versa. | 20 | set | 2,977.93 | ₹59,558.6 |
| 6 | Dismantling of suction & Foot valve with not & bolts, 12 inch as per direction of engineer in charge.The work includes transportation/shifting of foot valve and other required items from pump section workshop to work site and vice-versa. | 10 | set | 3,600.08 | ₹36,000.8 |
| 7 | Fitting of suction & Foot valve with not & bolts, 08 inch as per direction of engineer in charge.The work includes transportation/shifting of foot valve and other required items from pump section workshop to work site and vice-versa. | 30 | set | 2,355.78 | ₹70,673.4 |
| 8 | Fitting of suction & Foot valve with not & bolts, 10 inch as per direction of engineer in charge.The work includes transportation/shifting of foot valve and other required items from pump section workshop to work site and vice-versa. | 20 | set | 2,977.93 | ₹59,558.6 |
| 9 | Fitting of Foot valve ,12 inch as per direction of engineer in charge.The work includes transportation/shifting of foot valve and other required items from pump section workshop to work site and vice-versa. | 10 | set | 3,600.08 | ₹36,000.8 |
| 10 | Dismantling & Installation of Non Return Valve or Gate/sluice valve with short pieces, bend, taper etc including aligning, surface leveling and supporting where ever required all complete in mines area as per direction of engineer in charge. (6 inch) | 20 | set | 607.35 | ₹12,147 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.77 MB
Tendernotice_2.pdf
PDF • 1.31 MB
BOQ_368848.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].