Tender Value
₹4.0 L
EMD Value
₹8,057
Closing Date
10 Jul 2026, 11:00 am2d left
EE-I/DAMODAR CANAL DIVISION
EE-I/DAMODAR CANAL DIVISION
M/R to Canal and Canal Bank of Dy- 3 M.C. (in between Ch. 0.00 and Ch 126.00), Dy- 4 (in between Ch. 0.00 and Ch 31.00), Dy- 4A (in between Ch. 0.00 and Ch 41.73), Dy- 4B (in between Ch. 0.00 and Ch 58.00), Dy- 4C (in between Ch. 0.00 and Ch 250.00),
2026_IWD_1030275_16
WBIW/EE-I/DCD/e-NIT-08/2026-27
Open Tender
CIVIL WORKS
90 days
Hd. Qtr. Sub Division
Please refer Tender documents.
7 documents required · 7 mandatory
₹8,057
Yes
2 Jul 2026
2 Jul 2026
10 Jul 2026
2 Jul 2026
10 Jul 2026
2 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by Engineer-in-charge. | 44,006 | Sqm | 2.38 | ₹1,04,734.28 |
| 2 | Clearing and removal of debris (including floating debris) including sludge & slush mixed with all sorts of industrial waste, solid/semi-solid compact mass formed due to water hyacinth in combination with industrial wastes, carcasses, municipal garbage sludge, polypacks, thick and thorny jungles and long grass etc. and depositing, spreading the same on the canal bank and later burnt to ashes when dry including all leads and lifts complete. | 1,109 | Sqm | 35.75 | ₹39,646.75 |
| 3 | Supplying, dressing and stacking at site bamboo pins above 5 cm. diameter and upto 7.5 cm. diameter. (Dia. to be measured at mid length). | 520 | Metre | 34.56 | ₹17,971.2 |
| 4 | Driving bamboo pins in standing or flowing water including scaffolding and driving appliances.
Where boats are not necessary. | 346.67 | Metre | 13.11 | ₹4,544.84 |
| 5 | Supplying, fitting and fixing with iron nails half split bamboo wailing pieces (av. dia. of bamboo not less than 5.0 cm.) | 100 | Metre | 26.22 | ₹2,622 |
| 6 | Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg). | 3,062 | Each | 7.15 | ₹21,893.3 |
| 7 | Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,( tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials).NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag. | 3,062 | Each Bag | 8.34 | ₹25,537.08 |
| 8 | Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts. | 3,062 | Each Bag | 3.58 | ₹10,961.96 |
| 9 | Earthwork in excavation in the canals / drainage channels / borrow pits / River bed / slope of bank as noted below as per designed section & throwing the spoils in layers of 25 cm. for making banks as per profile or to deposit the same in any other place within an initial lead of 30 metre and initial lift of 1.5 metre including breaking clods, rough dressing etc. complete as per direction of the Engineer-in-charge.
Ordinary soil / local soil / soil mixed with moorum or kankar / silt, dry or moist / slushy silt / sticky soil. | 961.72 | Cum | 129.91 | ₹1,24,937.05 |
| 10 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and\ depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking.
Beyond 1.00 km and upto 2.00 km | 48.38 | Cum | 341.21 | ₹16,507.74 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.65 MB
2911i.pdf
Tender Documents • 1.26 MB
BOQ_2529816.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid