Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.4 CrAccepted-AOC | ₹2.4 Cr Quoted ₹56.2 L | 1 | Accepted-AOC CAL placed |
| 2 | 2₹60 L+₹10.7 L (19.0%)Accepted-AOC | ₹60 L+₹10.7 L (19.0%) Quoted ₹66.9 L | 2 | Accepted-AOC CAL placed |
| 3 | 3₹74.5 L+₹18.2 L (32.4%)Rejected-AOC | ₹74.5 L+₹18.2 L (32.4%) | 3 | Rejected-AOC Not suitable |
| 4 | 4₹95 L+₹38.8 L (68.9%)Rejected-AOC 2ND FLOOR TWIN TOWER 2 FATEHGARH CHURIAN ROAD OPP BAJWA HOSPITAL AMRITSAR PUNJAB 143001 | AMRITSAR | PUNJAB | 143001 | ₹95 L+₹38.8 L (68.9%) | 4 | Rejected-AOC Not suitable |
| 5 | Rejected-Technical | - | - | Rejected-Technical You have not uploalded documentary evidence for successful execution of similar contract in the past with other consumer, power Supply/distribution Co. or utilities of Electricity boards in last 5 consecutive years eventhough specifically called for. |
Tender Value
Refer Docs
EMD Value
₹3 L
Closing Date
23 Sept 2019, 5:00 pmClosed
DMM SB I
Materials Management department , Billee Bhavan, Kussara Store Mazgaon east Mumbai 400010
Annual Rate Contract for LV/HV/EHV Cable Laying Activity in Trenches
2019_BEST_473206_1
DMM(SB)/11/44598/2019-20/A
Open Tender
Electrical Works
Item Wise
365 days
Kussara Store Mazgaon Mumbai
please refer Tender Document
7 documents required · 7 mandatory
₹10,000
Yes
via Payment Gateway
₹3 L
Yes
17 Dec 2020
7 Aug 2019
25 Sept 2019
7 Aug 2019
23 Sept 2019
7 Aug 2019
Items :
Cost of Excavation and making Trenches including breaking existing concrete RCC/Concrete Pavement with proper Barricading & Backfilling
Cost of Excavation and making Trenches including breaking existing Asphalt with proper Barricading & Backfilling
Cost of Excavation and making Trenches including breaking existing Paver Blocks or similar surface with proper Barricading & Backfilling
Rate for LV Cable Laying per Running Meter in Trenches which includes Laying of Pipes wherever required, Pulling of cable (through excavated Trenches or Pipes), Bedding (by sand or sieved earth), Tiling & Removal of Debris (remained after Backfilling of the Trenches)
Rate for HV Cable Laying per Running Meter in Trenches which includes Laying of Pipes wherever required, Pulling of cable (through excavated Trenches or Pipes), Bedding (by sand or sieved earth), Tiling & Removal of Debris (remained after Backfilling of the Trenches)
Rate for EHV Cable Laying per Running Meter in Trenches which includes Laying of Pipes wherever required, Pulling of cable (through excavated Trenches or Pipes), Bedding (by sand or sieved earth), Tiling & Removal of Debris (remained after Backfilling of the Trenches)
M/S SVS Electric
DM Enterprises
The Imperial Electric Company
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .