Loading…
Loading…
Tender Value
₹30.8 Cr
EMD Value
₹61.6 L
Closing Date
11 Aug 2026, 3:00 pmClosed
Yes (up to 5 members)
No
Two Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
WORKS
17 conditions · 5 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less, where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-I, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Detail instruction as per clause 2.3 of tender document
(a)The tenderer must have successfully completed any of the following (From Govt. Organisation) during last 07 (seven) years, ending last day of the month previous to the one in which tender is invited. Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work each costing not less than the amount equal to 60% of advertised value of the tender. (b) (i)In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited. Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. Note for (b)(i): Separate completed works of minimum required values for each component shall also be considered for fulfillment of technical eligibility criteria. (b)(ii) In such cases, what constitutes a component in a composite work shall be clearly pre-defined with estimated tender cost of it, as part of the tender documents without any ambiguity. Any work or set of works shall be considered to be a separate component, only when cost of the component is more than Rs 2 crore each. (b)(iii) To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 2.3.3(a) (ii) or through subcontractor fulfilling the requirements as per clause 2.3.3 or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing. Among the components of composite tender stipulated for evaluation of technical eligibility, tenderer can execute one or more specified components by engaging sub-contractor. The component(s) of work as stipulated in the tender document have to be mandatorily executed by the tenderer and others component(s) as stipulated in the tender document can be executed by the tenderer himself or by engaging sub-contractor. The components which are permitted to be executed by sub-contractor will be further classified in the tender document into those which will be considered towards technical eligibility and the remaining which will not be considered towards technical eligibility. For the component(s) which are to be mandatorily executed by the tenderer, the technical eligibility shall be assessed as per clause 2.3.2 (A) (v) (b) (i) of the tender document. In case of tenderer is JV, the Technical eligibility for the component proposed to be executed by the tenderer shall be fulfilled as per clause 2.3.2 (A) (xii) and Annexure-K. The technical eligibility for such stipulated components of work for which engagement of sub-contractor is permitted shall be evaluated
Work experience certificate from private individual shall not be considered.However, in addition to work experience certificates issued by any Govt.Organisation, work experience certificate issued by Public listed companyhaving average annual turn over of Rs500 crore and above in last 3financial years excluding the current financial year, listed on National StockExchange or Bombay Stock Exchange, incorporated/registered atleast 5years prior to the date of closing of tender, shall also be consideredprovided the work experience certificate has been issued by a personauthorized by the Public listed company to issue such certificates. In casetenderer submits work experience certificate issued by public listedcompany, the tenderer shall also submit alongwith work experiencecertificate, the relevant copy of work order, bill of quantities, bill wisedetails of payment received duly certified by Chartered Accountant, TDScertificates for all payments received and copy of final/last bill paid bycompany in support of above work experience certificate.
Detail instruction as per clause 2.3 of tender document
Defination of Similar Work :- Any Civil Engineering work involving 'Earthwork' or 'Blanketing or Subgrade' in Railway Embankment' or 'Highway Construction' or 'Runway/Taxiway system of Airport' or in Dam or in Canal and CC/RCC work in any structure.
95 conditions · 8 needing a document upload
Tenderers are compulsorily required to upload certificate as per Annexure - M as stipulated in 2.2.6 & 2.2.7 of "Special Tender Conditions and instruction to tenderers" without which the offer will be considered incomplete and will be rejected summarily. (Ref: RB letter No. 2018/CEI/CT/37/GCC/Policy dated 12-05-2020)
Bid Security Declaration: I/We, M/s (Name of bidder) am/are aware that I/We have been exempted from submission of Bid Security/Earnest Money Deposit in lieu of this Bid Security Declaration. I/We understand and accept that if I/We withdraw my/our bid within bid validity period or if awarded the tender and on being called upon to submit the Performance Guarantee/Performance Security fail to submit the same within the stipulated time period mentioned in tender documents or on being called upon to sign the contract agreement fail to sign the same within stipulated period mentioned in tender documents, I/We i.e. the bidder shall be banned from submission of bids in any Works/Service Tender issued by Indian Railways for a period of 12 months from the date of such banning done on e-platform IREPS.
Submit your bank details .i.e Name of Bank alongwith Bank Branch code, Account number IFSC code as per Annexure J Real Time Gross Saving (RTGS)/National Electronic Fund Transfer(NEFT) Model Mandate Form
Tenderer must submit Mandatory certificate as per Annexure S (Instructions for bidders from a contrary which shares a land border with India as per Clause 2.4.3)
The tenderers confirms the option of taking payment through LC arrangements. The tender affirms having read over and agreed to the terms and conditions the LC option
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The tenderers must necessarily upload/submit the legal documents, pertaining to the constitution of their Concern as applicable, along with the tender, as enumerate in clause 2.4 of spl tender condition and instruction to tenderers of tender document.
Tenderer shall certify that they are not black listed or debarred by Railways or any other Ministry/ Department/PSU (Public Sector undertaking) of the Govt. of India/State Govt. from participation in tenders/contract on the date of opening of bids either in their individual capacity or as a member of the JV frm in which they were/are members.
Tender must compulsorily upload ANNEXURE-Q regarding Employment/Partnership etc. of Retired Railway Employees without which tender will be similarly rejected.
Tenderer may please note that offers received without requisite/mandatory documents as mentioned above, will be considered as invalid tender and for which contractor shall have no claim on Railway.
The tenderer s shall visit the site of work and acquaint himself/themselves with the conditions of work viz. approach roads and accessibility, nature of soil/rock, availability of materials, electric power, water for work and drinking purposes, site for labour camps, stores, godowns, extent of lead/lift in work, availability of skilled and unskilled labour etc. that may be encountered in the course of execution of work. In short, he/they should familiarize himself/themselves fully with the conditions obtaining at site and FURNISH A CERTIFICATE TO THIS EFFECT, in the Proforma appended as Annexure-C of Tender Document.
Tenderers are compulsorily required to fill up/submit requisite details in prescribed Performa of Annexure C to G,I,J and Annexure-L as per tender document without which the offer may be considered as incomplete and be liable to be rejected.
The tenderer s may note that the Railway reserves its right to either accept or reject any Bid/s without assigning any reasons whatsoever and tenderer s shall have no claim s on this account.
The tenderers shall quote the rates of one single % age "Above/Below/At par" on the total amount comprising basic value of entire Schedule of Chapters of USSOR-2010 plus escalation (Schedule "A") and one single % age "Above / Below / At par" over entire schedule of Non schedule Items (Schedule "B") in the attached Schedule of Items, Rates and Quantities (Packet-II, Financial Bid). Every possible fluctuation, in the rate of labour, material and general commodities, and other possibilities of each and every kind which may affect the rates, should be considered and kept in view before quoting the rates and no claim on this account shall be entertained by the Railway under any circumstances except the price escalation payable as per price variation clause, if any, provided separately in the tender documents.
INCOME TAX DEDUCTION: Under Section 194-C of the Income Tax Act 1961, deduction of 2 plus surcharge as applicable on Income Tax will be made for sums paid for carrying out the work under this contract. In case of supply contract for ballast, deduction of 2 Two percent Income tax will be made for the sums paid for labour portion only i.e., loading, unloading, stacking, measurement and laying etc.
TAXES
The contractor shall be governed by the Taxes applicable at the place of actual execution of work as per clause 23.0 of Special Tender Conditions and instruction to tenderers
Only Technical cum Commercial bid will be opened first. Thereafter all Technical cum Commercial offers will be evaluated for eligibility on the basis of the documents submitted by the tenderers regarding constitution of firm, technical and financial eligibility. The shortlisted firms will thereafter be informed of the date, time and venue of the opening of their Financial bids. Financial bids of these shortlisted tenderers will be opened as scheduled and evaluated accordingly.
If on verification of credentials, at the evaluation stage, it is found that the tenderer has submitted forged/fake documents in support of his offer, his Earnest Money Deposit shall be forfeited besides banning of business for a period of upto five year Over IR.
IF THE TENDERER S DELIBERATELY GIVES WRONG INFORMATION/ CREDENTIALS/DOCUMENTS IN HIS/THEIR TENDERS AND THEREBY CREATE S CIRCUMSTANCES FOR ACCEPTANCE OF HIS/THEIR TENDER, RAILWAY RESERVES THE RIGHT TO TERMINATE THE CONTRACT AT ANY STAGE, BESIDES, BANNING OF BUSINESS FOR A PERIOD OF UPTO FIVE YEAR OVER IR.
The contractors operations and proceedings in connection with the works shall at all times be conducted during the continuance of contract in accordance with the laws, ordinance, rules and regulations for the time being in force and the contractor shall further observe and comply with the bye-laws and regulations of the Govt. of India, State Govt. and of Municipal other authorities having jurisdiction in connection w ith the works or site over operations such as these are carried out by the contractor/s and shall give all notice required by such bye-laws and regulations. The Hospital and medical regulations in force for the time being shall also be complied with by the contractor/s and his workmen.
The contractor shall be responsible for the observance of the rules and regulations under the mines act and mineral rules and Indian Metallurgical rules and regulations of State/Central Govt. concerned as amended from time to time.
Contractor shall at all times keep the railway administration indemnified against all penalties that may be imposed by the Govt. of India or State Govt. for infringements or any of the clauses of the mines act and rules made there under in respect of quarries from which the ballast for these works is procured.
Care for submission of offer
Before submitting a tender, the tenderer will be deemed to have satisfied himself by actual inspection of the site and locality of the works, that all conditions liable to be encountered during the execution of the works are taken into account and that the rates he enters in the tender forms are adequate and all inclusive to accord with the provisions in Clause-37 of the Standard General Conditions of Contract for the completion of works to the entire satisfaction of the Engineer.
Tenderers will examine the various provisions of The Central Goods and Services Tax Act, 2017(CGST)/Integrated Goods and Services Tax Act, 2017(IGST)/Union Territory Goods and Services Tax Act, 2017(UTGST)- respective state's State Goods and Services Tax Act (SGST) also, as notified by Central-State Govt & as amended from time to time and applicable taxes before bidding. Tenderer's will ensure that full benefit of Input Tax Credit (ITC) likely to be availed by them is duly considered while quoting rates.
The successful tenderer who is liable to be registered under CGST/IGST/UTGST/SGST Act shall submit GSTIN along with other details required under CGST/IGST/UTGST/SGST Act to railway immediately after the award of contract, without which no payment shall be released to the contractor. The contractor shall be responsible for deposition of applicable GST to the concerned authority.
In case the successful tenderer is not liable to be registered under CGST/IGST/UTGST/SGST Act, the railway shall deduct the applicable GST from his/their bills under reverse charge mechanism (RCM) and deposit the same to the concerned authority.
Note:- the rates of USOR item no 81010,81020 and 81030 are also applicable even for height more than 6 mtr and nothing extra will be payable on this account
Earthwork in formation including Filling and Cutting, Blanketing, Extension of Minor bridge, Construction of new RUB, Construction of High-Level Platforms, Station Building at DBSI, FOB, Goods platform at Vivekanand puri halt and other ancillary civil works like Drains, Roads, Pathways etc, New S&T Building for EI at Daya Basti, EI Huts, Vivekanand Puri and Auto Huts in connection with construction of 3rd line between DKZ -SSB section of Delhi Division on Northern Railway under Dy CE C SSB.
431-ACS-C-SSB
431-ACS-C-SSB
Open
Works - General
15 Months
North West, Delhi
₹0
₹61.6 L
21 Jul 2026
21 Jul 2026
28 Jul 2026
424 items across 25 schedules · ₹31,33,84,709.76 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Preparation of foundation for Embankment by clearing, grubbing, stripping top soil (average 150 mm) and stacking beyond foundation area, thereafter ploughing and pulverizing 150 - 200 mm of top of soil with tractor trolley, mixing water to achieve OMC with water sprinkler or left for natural drying, as required, and compaction with vibratory roller of suitable capacity to achieve 98% MDD for laying first layer of soil for embankment construction. | 100 Sqm | 29160.00 | 528.37 | 1,54,072.69 |
| 2 | Benching of existing embankment manually in steps of 30 cm height for doubling/tripling works in running line to provide proper amalgamation between the old and new embankments as per RDSO latest Specifications and guidelines RDSO/2020//GE: IRS-0004 to the entire satisfaction of Engineer in-charge. The item includes uprooting and disposing of all the vegetation, all lift, descends, ascends and additional earthwork required for filling due to removal of earth in benching in existing bank. Note: (1) The benching Work shall be done for a maximum height of 0.90 m at any time based on the progress of earthwork starting from toe of the embankment. (2) Benching work shall be certified and recorded before starting the earth work. (3) Unit for payment shall be km per metre height of the Bank. Height here means representative average height of the bank in the specified km taken from cross sectional measurements for earthwork. (4) Since the rate includes earthwork in steps, payment under this item shall be made after completion of earthwork to that level. (5) Cut soil from bank shall not be used in embankment construction and disposed off away from bank as per the direction of Engineer-in-charge. | Kilometre | 2.84 | 1,53,238.46 | 4,35,197.23 |
| Earthwork in filling in embankment, guide bunds, around buried type abutments, bridge gaps, trolley refuges, platforms etc. with contractor's own earth conforming to Soil Quality Class SQ1/SQ2/SQ3, after preparation of foundations as applicable, benching in existing banks wherever required, spreading in layers with motor grader, bringing the moisture content to OMC, mechanical compaction to specified density and dressing of bank to final profile as per R D S O Specifications: RDSO/2020/GE: IRS-0004 with latest correction slips. Note: 1) Foundation preparation, Benching including additional earthwork on account of this, wherever required, shall be paid extra under relevant schedule item for benching. 2) Payment for Earthwork under this item shall be made based on the cross section measurements calculated (i) with original ground profile of existing bank based on initial ground levels before doing benching and (ii) final profile of the bank worked out with final levels as per prevailing guidelines. | — | — | — | — | |
| 3 | Using Soil Class SQ2 | cum | 35000.00 | 352 | 1,23,20,000 |
| Earthwork in cutting in formation, trolley refuges, side drains, level crossing approaches, platforms, catch water drains, diversion of nallah & finishing to required dimension and slopes to obtain a neat appearance to standard profile inclusive of all labour, materials, plant & machinery, leading all cut spoils either to make spoil dumps or for filling in embankment with leads within 2 km on either side of edge of the cutting(s) including all lifts, ascent, descent, loading, unloading, bailing & pumping out water, if required, clearance of site and all other works incidental thereto for completing the work as per RDSO Specification No. RDSO/2020/GE: IRS-0004 with latest updated correction slips and to the satisfaction of the Engineer-in-Charge. Note: (i) All usable earth arising from cut spoils shall be led into bank formation and Unusable spoils shall be dumped / stacked away from toe of embankment. (ii) All hard rock /and boulders not fit for filling will be stacked by the contractor and will be property of the Railways. (iii)Cut trees shall be property of Railways and to be deposited in the railway godown unless specified otherwise in the Conditions of Contract. | — | — | — | — | |
| 4 | In all conditions and classifications of soil except rock | cum | 2025.00 | 107.35 | 2,17,383.75 |
| 5 | Foundation preparation in cutting - ploughing and pulverizing 15 cm of top of soil with tractor trolley, mixing water to achieve OMC with water sprinkler or allowing for natural drying, as required, and compaction with vibratory roller of suitable capacity to achieve 98% MDD for laying blanketing layer. | 100 Sqm | 202500.00 | 209.44 | 4,24,116 |
| 6 | Mechanical manufacturing of blanketing material by using only hard and durable stone crushed in mechanical crusher to different gradations, wet mixing of the same in designed proportion in Pug mill or wet mix plant to have uniform gradation including all incidental transportation, laying over finished formation in uniform layer(s) with motor grader, compaction with suitable vibratory roller to specified density and finishing to correct profile, complete as per RDSO Specification No. RDSO/2020/GE: IRS-0004 with latest correction slips. Note: This item shall be used only when entire constituent of blanketing material is mechanically manufactured by crushing of hard and durable stone into desired gradation of designed proportion. | cum | 23000.00 | 2,706.13 | 6,22,40,990 |
| Felling trees of girth (measured at a height of 1.0 m above ground level) including leading and stacking of material within 100m. Note : 1. When stumps are grubbed up in addition, the rates shall be doubled for trees cut and grubbed 2. Payment for grubbing shall only be made where specially ordered. 3. Grubbing shall be ordered only where it is essential to remove the stumps, including the roots, as per specification. 4. Grubbing shall include removal of roots of trees and saplings to a depth of 60cm below ground level or 30 cm below formation level or 15 cm below sub grade level, whichever is lower. | — | — | — | — | |
| 7 | Girth over 30 cm and up to 60 cm | Each | 40.00 | 404.06 | 16,162.4 |
| 8 | Girth over 60 cm and up to 1.5m | Each | 30.00 | 1,119.32 | 33,579.6 |
| 9 | Girth over 1.5m up to 3 m | Each | 20.00 | 2,231.95 | 44,639 |
| 10 | Girth over 3 m | Each | 5.00 | 3,741.94 | 18,709.7 |
| Turfing / planting, including all lead & lift and watering as required until properly rooted with. Note: Initially payment of only 40% will be made. Balance 60% will be paid after 3 months of maintenance period, only if the turfing is properly rooted on entire turfed area. | — | — | — | — | |
| 11 | Turfing with planted doob grass. | 100 Sqm | 39.00 | 30,959.88 | 12,074.35 |
| 12 | Cleaning out silt from bed of reservoir/canals including 50m lead and lift up to 1.5m. | cum | 250.00 | 239.76 | 59,940 |
| P r o v i d i n g portable fencing along running track where work is to be done in close vicinity of track, maintaining during execution of work and removing after completion of the work as per direction of the Engineer. Fencing shall consist of self supporting steel angles of size 50mm x 50mm x 6mm, 1.5m long provided with hooks etc. and embedded in CC 1:2:4 block of size 0.23m x 0.23m x 0.23m placed at c/c distance of 2m along track. 12mm dia rods in three horizontal layers shall be tack welded with angle posts. Note : Released material will be property of the contractor after completion of work. Cost of cement required for CC blocks shall be paid separately. | — | — | — | — | |
| 13 | With provision of painting verticals & horizontals with red luminous paints / strips of 30cm each with a gap of 30 cm. | Metre | 300.00 | 152.11 | 45,633 |
| 14 | Supplying & laying of drainage composite for use behind abutments, wing walls, return walls and Retaining walls Geocomposite drain (Vertical) as per RDSO Specification No. RDSO/2018/GE:IRS-0006 latest version with all material, labour, equipment, tools and plants, lead, lift etc. complete in all respects as per the direction of Engineer-in-Charge. | Sqm | 500.00 | 626.86 | 3,13,430 |
| Schedule total | ₹7,63,35,927.72 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
SPECIALTENDERCONDITIONSOFEARTHWORK.pdf SPECIAL TENDER CONDITIONS
ATTACHMENT
GeneralTenderConditionsofEarthwork.pdf
ATTACHMENT
SPECIALTENDERCONDITIONSOFEARTHWORK.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .