| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹5 LAccepted-AOC | l1 | Accepted-AOC l1 | |
| 2 | l2₹6.3 L+₹1.3 L (25.9%)Rejected-Finance 2214 URBAN ESTATE JIND | JIND | HARYANA | 126101 | l2 | Rejected-Finance l2 | |
| 3 | l3₹26.8 L+₹21.8 L (435.2%)Rejected-Finance | l3 | Rejected-Finance l3 |
Tender Value
Refer Docs
Closing Date
5 Apr 2021, 9:00 amClosed
md
sugarmillmeham
varioustypeofjobwork
2021_HBC_166447_1
MSM/PUR/2021/014
Open Tender
Construction Works
Works
45 days
sugarmillmeham
Please refer Tender documents.
2 documents required · 2 mandatory
₹100
Exempted
23 Apr 2021
27 Mar 2021
5 Apr 2021
27 Mar 2021
5 Apr 2021
27 Mar 2021
Amount
Welding of mill roller shaft journals.
Welding of mill roller side
Welding& grinding of mill Crown pinion one side
Welding of mill roller shaft crown pinion seat
Welding of crown pinion bore
Conventional Arcing of mill rollers
To make tips at landing of mill rollers With electrode CCR 62/1 or equivalent.
a) Cleaning of mills machinery parts i.e. crown pinions, mill rollers shaft, mill couplings etc. for ultrasonic purpose. b) Scrapping, cleaning & painting of various parts of mills e.g. Head stocks, trash beams, transmissions covers, plumber blocks, troughs, structural columns, platforms railings, fiberizor & cane leveler casings, side cover plates, juice tanks, Donnelly chutes, couplings, hydraulic grabs, pipe lines, juice screen structure, cleaning & liming of mills foundation etc.
Cleaning & washing at mill house from cane carrier to bagasse elevator, Including factory floor, mill house crane, factory columns, fiberizor pit, below cane carrier, near electric panels of bagasse elevator etc.
Removal work of water, mud, bagasse, earth, oil etc from Mills & transmission gears foundation trenches.
Scrapping of sugar from different machinery, to be filled in bags and shifted to directed location, then washing all equipments from inner e.g. So2 Gas line, clarifier etc. and outer side Including floor with water from juice tank to drier house. Terms & Condition – 1. The work should be completed within 40 days after completion of the crushing season. 2. For washing mill provide pump, pipe and water. 3. All required material like kassi, belcha etc will be in the party scope.
Cleaning of both boilers for the season 2021-22 Scope of work – 1. General cleaning of furnace area, super heater external cleaning, external cleaning of the boiler tubes, cleaning of furnace walls, chamber economizer coils, Air heater cleaning, cleaning of air heater tubes with flexible shaft if required, cleaning of complete ducting, cleaning of wet scrapper including all ducting, washing of structure, truss and boiler house with water. 2. Cleaning and painting of feed tank, deareator tank, and boiler drum and drum internals. 3. 3. Total garbage to be lifted by contractor as and when required to suitable place. 4. Cleaning and painting of ID, FD, SA fan impeller and casing inside and outside. 5. In addition to above any work related to cleaning at boilers section will be in scope of party.
AJAY KUMAR CONTRACTOR
DILBAG
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .