Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.1 LAccepted-Finance ALIGARH | UTTAR PRADESH | 202001 | 1 | Accepted-Finance 1 | |
| 2 | 2₹8.9 L+₹89,340.25 (11.1%)Rejected-Finance | 2 | Rejected-Finance 2 | |
| 3 | 3₹9.1 L+₹1.0 L (12.8%)Rejected-Finance | 3 | Rejected-Finance 3 |
| Sl No | Description | Qty | Unit | DEVENDRA KUMAR SHARMA L1 | JITENDRA SINGH CONSTRUCTION L2 | Phoughat Construction L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in road diversion and making bundha U/s & down stream of site Removing after competion of work or as directed by Engineer in charge. | 488 | Cum | 42 ₹20,496 Lowest | 60 ₹29,280 | 100 ₹48,800 |
| 2.00 | Supply & fixing of informatory board /caution board including painting wirtting and fixing with CC 1:2:4 including all cost of material, labour and T&P etc. complete | 1 | Nos | 5,000 ₹5,000 Lowest | 5,200 ₹5,200 | 5,000 ₹5,000 Lowest |
| 3.00 | Earth Work in Excavation of Foundation in dry ordinary soil including lift upto 1.5 M and Lead upto 30 M and including filling, watering and ramming excavated earth into the trenched or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth.including all cost of material, labour & T&P etc. or as directed by Engineer in charge. | 139 | Cum | 71.25 ₹9,903.75 Lowest | 90 ₹12,510 | 1,500 ₹2,08,500 |
| 4.00 | Providing and laying Plain Cement concrete (1:2:4) in with stone ballast 20mm to 40mm granite stone grit, cement , coarse sand including cost of all material, labour and T&P etc.complete.or as directed by Engineer in charge. | 17 | Cum | 6,000 ₹1,02,000 | 6,800 ₹1,15,600 | 500 ₹8,500 Lowest |
| 5.00 | Ordinary centering & shuttering for R.C.C. work including all cost of material, labour and T&P etc. complete or as directed by Engineer in charge. | 126 | Sqm. | 300 ₹37,800 | 500 ₹63,000 | 150 ₹18,900 Lowest |
| 6.00 | Ordinary centering & shuttering for C.C work including all cost of material, labour and T&P etc. complete or as directed by Engineer in charge. | 19 | Sqm. | 400 ₹7,600 | 800 ₹15,200 | 350 ₹6,650 Lowest |
| 7.00 | Steel Reinforcement including cutting, bending, binding, placing in position including cost of all material, labour and T&P etc.complete.or as directed by Engineer in charge. | 1.85 | MT | 65,000 ₹1,20,250 | 72,000 ₹1,33,200 | 600 ₹1,110 Lowest |
| 8.00 | Supplying and laying one layer of tar felt ISI marked at the junction of wall and roof or at any place as per dirction of E/I including neccessary over lap giving one coat of approved mastic paint below the tarfelt and including supply of all material, labour and T&P etc. required for proper completion of work . | 6 | Sqm | 200 ₹1,200 Lowest | 500 ₹3,000 | 5,000 ₹30,000 |
| 9.00 | Supplying and Fixing 75 mm Dia PVC pipe i/c all Material Labour , T&P etc. including all cost of material, labour and T&P etc. complete | 15 | RM | 100 ₹1,500 Lowest | 150 ₹2,250 | 200 ₹3,000 |
| 10.00 | Providing and laying RCC M20(1:1.5:3) with cement , coarse sand stone grit including cost of all material, labour and T&P etc.complete.or as directed by Engineer in charge. | 25 | Cum | 7,000 ₹1,75,000 | 8,053 ₹2,01,325 | 140 ₹3,500 Lowest |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
25 Sept 2026, 12:00 pmClosed
Executive Engineer
UMBDGC KHURJA
HEAD REPAIR AND OTHER WORK OF UTRAOLY MINOR
2026_UPIDC_1187630_18
07/EE/2026-27
Open Tender
Civil Works
Item Rate
30 days
UMBDGC KHURJA
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹20,000
2 Oct 2026
19 Sept 2026
25 Sept 2026
19 Sept 2026
25 Sept 2026
19 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in road diversion and making bundha U/s & down stream of site Removing after competion of work or as directed by Engineer in charge. | 488 | Cum | - | - |
| 2 | Supply & fixing of informatory board /caution board including painting wirtting and fixing with CC 1:2:4 including all cost of material, labour and T&P etc. complete | 1 | Nos | - | - |
| 3 | Earth Work in Excavation of Foundation in dry ordinary soil including lift upto 1.5 M and Lead upto 30 M and including filling, watering and ramming excavated earth into the trenched or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth.including all cost of material, labour & T&P etc. or as directed by Engineer in charge. | 139 | Cum | - | - |
| 4 | Providing and laying Plain Cement concrete (1:2:4) in with stone ballast 20mm to 40mm granite stone grit, cement , coarse sand including cost of all material, labour and T&P etc.complete.or as directed by Engineer in charge. | 17 | Cum | - | - |
| 5 | Ordinary centering & shuttering for R.C.C. work including all cost of material, labour and T&P etc. complete or as directed by Engineer in charge. | 126 | Sqm. | - | - |
| 6 | Ordinary centering & shuttering for C.C work including all cost of material, labour and T&P etc. complete or as directed by Engineer in charge. | 19 | Sqm. | - | - |
| 7 | Steel Reinforcement including cutting, bending, binding, placing in position including cost of all material, labour and T&P etc.complete.or as directed by Engineer in charge. | 1.85 | MT | - | - |
| 8 | Supplying and laying one layer of tar felt ISI marked at the junction of wall and roof or at any place as per dirction of E/I including neccessary over lap giving one coat of approved mastic paint below the tarfelt and including supply of all material, labour and T&P etc. required for proper completion of work . | 6 | Sqm | - | - |
| 9 | Supplying and Fixing 75 mm Dia PVC pipe i/c all Material Labour , T&P etc. including all cost of material, labour and T&P etc. complete | 15 | RM | - | - |
| 10 | Providing and laying RCC M20(1:1.5:3) with cement , coarse sand stone grit including cost of all material, labour and T&P etc.complete.or as directed by Engineer in charge. | 25 | Cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
BOQ_2236418.xls
BOQ • 0.26 MB
0001.pdf
PDF • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .