| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-Finance | L1 | Accepted-Finance L1 Bidder | |
| 2 | L2₹1.7 Cr+₹29.5 L (20.6%)Accepted-Finance | L2 | Accepted-Finance L2 Bidder | |
| 3 | L3₹1.8 Cr+₹32.1 L (22.5%)Rejected-Finance NOWROZABAD BAZARPURA NOWROZABAD NOWROZABAD UMARIA MADHYA PRADESH 484555 | UMARIA | MADHYA PRADESH | 484555 | L3 | Rejected-Finance L3 Bidder | |
| 4 | L4₹2.0 Cr+₹60.5 L (42.3%)Rejected-Finance | L4 | Rejected-Finance L4 Bidder | |
| 5 | L5₹2.3 Cr+₹84.4 L (59.0%)Rejected-Finance 4TH FLOOR B K MARKET BACK SIDE PREMISES NO 16 B SHAKESPEARE SARANI KOLKATA 700071 | KOLKATA | KOLKATA | WEST BENGAL | 700071 | L5 | Rejected-Finance L5 Bidder |
| Sl No | Description | Qty | Unit | kamlesh singh L4 | M/s AJAY SHRIVAS L2 | GOLD STAR ENGINEERING SERVICES L3 | NKAS Services Private Limited L5 | United Coal Carriers L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Ash Excavation and Loading :- Excavation and loading of ash from ash dyke in vechicle, including construction and maintanence of temporary roads on ash dyke, by mechanical means including prevention of fugitive emission of area complete including all leads and lifts, all other incidental charges such as water sprinkling, cost of labour, equipment and material etc. complete as per specifications, drawing and direction of Engineer-in-charge and guidelines of MoEF&CC/MPPCB for ash handling.
(Note:- In case ash is proivded from ash silo by MPPGCL, no payment towards this item will be made.) | 1,00,000 | CuM | 18,00,000 ₹21,24,000 Lowest | 46,00,000 ₹54,28,000 | 25,00,000 ₹29,50,000 | 26,00,000 ₹30,68,000 | 30,00,000 ₹35,40,000 |
| 2.00 | Transportation and Unloading :-
Transportation of ash from ash dyke in closed/covered container or any other methods to prevent air pollution during transportation from ash pond to abandoned mine/low lying area Trench ABCD patch located near village Bakho, Tehsil - Burhar, Distt- Shahdol (M.P.) including unloading, watering if required during unloading of ash through sprinklers or other means to prevent fugitive emission of ash. All works are to be carried out as per norms of MOEF&CC, MP Pollution control Board, MOU of SECL Sohagpur area and GoMP. Quoted rates must be inclusive of cost of labour, equipment and material etc. required to complete the work in all respect as directed by Engineer-in-Charge.
Total lead of 15.36 KM. | 1,00,000 | CuM | 1,18,00,000 ₹1,23,90,000 | 63,00,000 ₹74,34,000 Lowest | 1,10,00,000 ₹1,29,80,000 | 1,56,00,000 ₹1,63,80,000 | 89,00,000 ₹1,05,02,000 |
| 3.00 | Filling and Compaction of Ash i/c dozing:-Ash work in filling with dozing and compacting by mechanical means to achieve maximum in–situ dry density 95% of MDD of the material found out as per I.S. 2720 (Part VII) at OMC, by use of suitable vibratory rollers with static weight 6 to 10 tonnes or as required, as per relevant specifications, including cleaning of area (where ash filling is to be done) by uprooting of all type of vegetation, grass, bushes, sapling etc. by any means and stripping of top layer of minimum 150 mm or to such depth as decided by the Engineer in charge, depending upon the quality of ash to be used in forming ash filling etc. The work shall include disposal of all unsuitable material and stacking of suitable earth/soil (to be used later for top soil cover over ash fill) outside the working zone/area, dewatering, all man and machinery, providing barricading, fencing and construction of 15 feet high wind breaking wall of G.I. sheet all along the dumping site, suitable dust supression system to prevent fugitive dust emission, construction of temporary approach/ haul road etc. complete with all leads and lifts as per tender specifications/ drawings and direction of Engineer-in-charge and compliance of relevant guide lines/ specifications of MoEF&CC,MPPCB & MOU of SECL Sohagpur area for fly ash handling and filling in low lying areas. | 1,00,000 | CuM | 45,00,000 ₹53,10,000 | 38,55,000 ₹45,48,900 | 20,00,000 ₹23,60,000 | 22,10,000 ₹26,07,800 | 10,00,000 ₹11,80,000 Lowest |
| 4.00 | Overburden excavation and loading Excavation and loading of overburden from near by area in vehicle, including construction and maintenance of temporary roads on near by area, by mechanical means including prevention of fugitive emission of area complete including all leads and lifts, all other incidental charges such as water sprinkling, cost of labour, equipment and material etc. complete as per specifications, drawing and direction of Engineer-in-charge and guidelines,/ specifications of MoEF&CC,MPPCB & MOU of SECL Sohagpur area for ash handling. | 4,356.6 | CuM | 68,964.98 ₹81,378.68 Lowest | 3,11,845.43 ₹3,67,977.61 | 87,132 ₹1,02,815.76 | 1,69,907.4 ₹2,00,490.74 | 1,24,163.1 ₹1,46,512.46 |
| 5.00 | Transportation of Overburden:-Transportation of overburden from material available near unused/aboandoned open mines trench ABCD patch in closed/covered container or any other methods to prevent air pollution during transportation from material available near unused/aboandoned open mines trench ABCD patch to abandoned mine/low lying area Trench ABCD patch located near village Bakho, Tehsil - Burhar, Distt- Shahdol (M.P.) including unloading, watering if required during unloading of overburden through sprinklers or other means to prevent fugitive emission of overburden. All works are to be carried out as per norms of MOEF& CC, MP Pollution control Board, MOU of SECL Sohagpur area and GoMP. Quoted rates must be inclusive of cost of labour, equipment and material etc. required to complete the work in all respect as directed by Engineer-in-Charge.
Total lead of 1.00 KM. | 4,356.6 | CuM | 2,09,116.8 ₹2,19,572.64 | 2,52,682.8 ₹2,98,165.7 | 1,30,698 ₹1,54,223.64 | 3,39,814.8 ₹3,56,805.54 | 43,566 ₹51,407.88 Lowest |
| 6.00 | Filling and compaction of Over burden i/c dozing:-Over burden filling with dozing and compacting by mechanical means to achieve maximum in–situ dry density 95% of MDD of the material found out as per I.S. 2720 (Part VII) at OMC, by use of suitable vibratory rollers with static weight 6 to 10 tonnes or as required, as per relevant specifications. including providing suitable dust supression system to prevent fugitive dust emission, construction of temporary approach/ haul road etc. complete with all leads and lifts as per tender specifications/ drawings and direction of Engineer-in-charge and compliance of relevant guide lines/ specifications of MoEF&CC,MPPCB & MOU of SECL Sohagpur area for ash handling. | 4,356.6 | CuM | 1,96,047 ₹2,31,335.46 | 2,52,682.8 ₹2,98,165.7 | 1,30,698 ₹1,54,223.64 | 1,13,271.6 ₹1,33,660.48 | 43,566 ₹51,407.88 Lowest |
Tender Value
₹1.9 Cr
EMD Value
₹2 L
Closing Date
6 Apr 2026, 3:00 pmClosed
CE GEN
SE PNW ATPS
Loading , transporation and filling of ash in the unused/abandoned open mines trench ABCD of Sharda OCM mines located near village Bakho Distt Shahdol (MP) including other related works required as per MPPCB norms at ATPS Chachai.
2026_MPPGC_484618_1
1655
Open Tender
Civil Works - Others
Item Rate
365 days
ATPS CHACHAI
AS PER NIT
19 documents required · 19 mandatory
₹5,000
Yes
₹2 L
Yes
12 Oct 2026
25 Feb 2026
8 Apr 2026
25 Feb 2026
6 Apr 2026
25 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Ash Excavation and Loading :- Excavation and loading of ash from ash dyke in vechicle, including construction and maintanence of temporary roads on ash dyke, by mechanical means including prevention of fugitive emission of area complete including all leads and lifts, all other incidental charges such as water sprinkling, cost of labour, equipment and material etc. complete as per specifications, drawing and direction of Engineer-in-charge and guidelines of MoEF&CC/MPPCB for ash handling.
(Note:- In case ash is proivded from ash silo by MPPGCL, no payment towards this item will be made.) | 1,00,000 | CuM | - | - |
| 2 | Transportation and Unloading :-
Transportation of ash from ash dyke in closed/covered container or any other methods to prevent air pollution during transportation from ash pond to abandoned mine/low lying area Trench ABCD patch located near village Bakho, Tehsil - Burhar, Distt- Shahdol (M.P.) including unloading, watering if required during unloading of ash through sprinklers or other means to prevent fugitive emission of ash. All works are to be carried out as per norms of MOEF&CC, MP Pollution control Board, MOU of SECL Sohagpur area and GoMP. Quoted rates must be inclusive of cost of labour, equipment and material etc. required to complete the work in all respect as directed by Engineer-in-Charge.
Total lead of 15.36 KM. | 1,00,000 | CuM | - | - |
| 3 | Filling and Compaction of Ash i/c dozing:-Ash work in filling with dozing and compacting by mechanical means to achieve maximum in–situ dry density 95% of MDD of the material found out as per I.S. 2720 (Part VII) at OMC, by use of suitable vibratory rollers with static weight 6 to 10 tonnes or as required, as per relevant specifications, including cleaning of area (where ash filling is to be done) by uprooting of all type of vegetation, grass, bushes, sapling etc. by any means and stripping of top layer of minimum 150 mm or to such depth as decided by the Engineer in charge, depending upon the quality of ash to be used in forming ash filling etc. The work shall include disposal of all unsuitable material and stacking of suitable earth/soil (to be used later for top soil cover over ash fill) outside the working zone/area, dewatering, all man and machinery, providing barricading, fencing and construction of 15 feet high wind breaking wall of G.I. sheet all along the dumping site, suitable dust supression system to prevent fugitive dust emission, construction of temporary approach/ haul road etc. complete with all leads and lifts as per tender specifications/ drawings and direction of Engineer-in-charge and compliance of relevant guide lines/ specifications of MoEF&CC,MPPCB & MOU of SECL Sohagpur area for fly ash handling and filling in low lying areas. | - | CuM | - | - |
| 4 | Overburden excavation and loading Excavation and loading of overburden from near by area in vehicle, including construction and maintenance of temporary roads on near by area, by mechanical means including prevention of fugitive emission of area complete including all leads and lifts, all other incidental charges such as water sprinkling, cost of labour, equipment and material etc. complete as per specifications, drawing and direction of Engineer-in-charge and guidelines,/ specifications of MoEF&CC,MPPCB & MOU of SECL Sohagpur area for ash handling. | 4,356.6 | CuM | - | - |
| 5 | Transportation of Overburden:-Transportation of overburden from material available near unused/aboandoned open mines trench ABCD patch in closed/covered container or any other methods to prevent air pollution during transportation from material available near unused/aboandoned open mines trench ABCD patch to abandoned mine/low lying area Trench ABCD patch located near village Bakho, Tehsil - Burhar, Distt- Shahdol (M.P.) including unloading, watering if required during unloading of overburden through sprinklers or other means to prevent fugitive emission of overburden. All works are to be carried out as per norms of MOEF& CC, MP Pollution control Board, MOU of SECL Sohagpur area and GoMP. Quoted rates must be inclusive of cost of labour, equipment and material etc. required to complete the work in all respect as directed by Engineer-in-Charge.
Total lead of 1.00 KM. | 4,356.6 | CuM | 1 | ₹4,356.6 |
| 6 | Filling and compaction of Over burden i/c dozing:-Over burden filling with dozing and compacting by mechanical means to achieve maximum in–situ dry density 95% of MDD of the material found out as per I.S. 2720 (Part VII) at OMC, by use of suitable vibratory rollers with static weight 6 to 10 tonnes or as required, as per relevant specifications. including providing suitable dust supression system to prevent fugitive dust emission, construction of temporary approach/ haul road etc. complete with all leads and lifts as per tender specifications/ drawings and direction of Engineer-in-charge and compliance of relevant guide lines/ specifications of MoEF&CC,MPPCB & MOU of SECL Sohagpur area for ash handling. | 4,356.6 | CuM | 1 | ₹4,356.6 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.95 MB
SBDworkmergednew.pdf
Tender Documents • 11.57 MB
Schedule484618.pdf
Tender Documents • 0.86 MB
TenderAcceptanceLetter484618.pdf
Other Document • 0.28 MB
BGFORMATE484618.PDF
Other Document • 0.17 MB
InstructionsToBidderForOnlineBidSubmission450051.pdf
Tender Documents • 0.45 MB
TECHNICALBID484618.xls
Tender Documents • 0.09 MB
BOQ_570065.xls
BOQ • 0.29 MB
ExtensionnoticeII484618.pdf
PDF • 0.23 MB
ExtensionnoticeII484618.pdf
PDF • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .