Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹93,130.69Accepted-AOC | ₹93,130.69 | L1 | Accepted-AOC Low Rate Quoted |
| 2 | L2₹94,066.67Rejected-Finance | ₹94,066.67 | L2 | Rejected-Finance High Rate Quoted |
Tender Value
₹94,000
Closing Date
26 Feb 2026, 2:00 pmClosed
BLOCK DEVELOPMENT OFFICER
BLOCK DEVELOPMENT OFFICE, CHEYYAR
Renovation of Ceiling in Sengattankundil
2026_RDTN_664020_1
SengattankundilPack
Open Tender
Civil Works
Lump-sum
30 days
BLOCK DEVELOPMENT OFFICE
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
17 Jul 2026
21 Feb 2026
26 Feb 2026
21 Feb 2026
26 Feb 2026
21 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Renovation of PUES School Building Ceiling Putty Work in Sengattankundil North | |||||
| 1.01 | Chipping of concrete and roughening the surface (Refer SOR 2025-26 Pg No: 30 W-0036) | 98.35 | sqm | 43.2 | ₹4,248.72 |
| 1.02 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. | 98.35 | sqm | 308.85 | ₹30,375.4 |
| 1.03 | White washing two coats with freshly burnt white shell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed. | 98.35 | sqm | 39.26 | ₹3,861.22 |
| 1.04 | Providing Name Board Charges | 1 | Nos | 500 | ₹500 |
| 1.05 | Provision of Photo Charges | 1 | Nos | 500 | ₹500 |
| 1.06 | Provision of GST 18% | 1 | Nos | 6,929 | ₹6,929 |
| 1.07 | Labour Welfare Fund 1% | 1 | Nos | 385 | ₹385 |
| 2Renovation of PUES School Building Ceiling Putty Work in Sengattankundil West | |||||
| 2.01 | Chipping of concrete and roughening the surface (Refer SOR 2025-26 Pg No: 30 W-0036) | 98.35 | sqm | 43.2 | ₹4,248.72 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_797255.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].