Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.4 LAccepted-Finance VILLAGE MANDRI P O CHALAHAL SUB TEHSIL DHAMI DISTT SHIMLA SHIMLA HIMACHAL PRADESH | ₹18.4 L | L1 | Accepted-Finance 1st lowest bidder |
| 2 | L2₹18.7 L+₹30,287.63 (1.65%)Rejected-Finance ANDHRA POWER HOUSE DIVISION HPSEBL CHIRGAON 171208 | SHIMLA | HIMACHAL PRADESH | 171208 | ₹18.7 L+₹30,287.63 (1.65%) | L2 | Rejected-Finance 2nd lowest bidder |
| 3 | L3₹19.5 L+₹1.2 L (6.44%)Rejected-Finance VILLAGE AND PO SHIYAH TEHSIL BHUNTAR DISTT KULLU H P | ₹19.5 L+₹1.2 L (6.44%) | L3 | Rejected-Finance 3rd lowest bidder |
| 4 | L4₹21.3 L+₹3.0 L (16.3%)Rejected-Finance | ₹21.3 L+₹3.0 L (16.3%) | L4 | Rejected-Finance 4th lowest bidder |
| Sl No | Description | Qty | Unit | Manohar Singh L1 | RAJESH L2 | Bilal Ahmed L4 | Ashish Kumar L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains including dressing of sides and ramming of bottoms in earth work in all heights and depths in all kinds of soilscomprising of pick work, jumper work and blasting work both in soft and hard rock with chiseling and wedging out of rock (where blasting is prohibited) and their intermediate classification of soils including, dewatering wherever required, setting out to required lines, levels as shown on the drawing and directed by the engineer-in-charge at site., according to the HP.PWD. specification of 1990 (one thousand nine hundred ninety) volume-I (one) and sorting out useful and unuseful material and transportation of the unuseful material for disposing at dumping site (To be arranged by the contractor) including payment of MC/ local body dumping charges it lived any as per satisfaction of Engineer-in-charge through all modes of transportation including head load, animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour (if required). All useful material such as stones, shingles aggregate and slates shall be properly stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation and used/ removed as per the direction of Engineer-in-charge. Any loss to the public and private propriety during the course of execution and disposal of serviceable and unserviceable materials shall be absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges. | 120 | Cum. | 80 ₹9,600 Lowest | 250 ₹30,000 | 250 ₹30,000 | 225 ₹27,000 |
| 2.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand) : 8 graded stone aggregate 40 mm nominal size)mechanically mix by concrete mixer including curing complete, including carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge. | 9 | Cum. | 3,500 ₹31,500 Lowest | 4,600 ₹41,400 | 3,500 ₹31,500 Lowest | 3,500 ₹31,500 Lowest |
| 3.01 | Centering and shuttering including strutting, propping etc. and removal of form, including carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge. (a) Foundations, footings, bases of columns, etc. for mass concrete | 36 | Sqm | 200 ₹7,200 Lowest | 280 ₹10,080 | 200 ₹7,200 Lowest | 225 ₹8,100 |
| 3.02 | b) Columns, Pillars, Piers, Abutments, Posts and Struts for all floor level in all heights. | 120.15 | Sqm | 150 ₹18,022.5 Lowest | 290 ₹34,843.5 | 350 ₹42,052.5 | 250 ₹30,037.5 |
| 3.03 | c) Lintels, beams, plinth beams, girders, bressumers and cantilevers for all floor level in all heights. | 70.44 | Sqm | 200 ₹14,088 Lowest | 300 ₹21,132 | 300 ₹21,132 | 300 ₹21,132 |
| 4.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level mechanically mix by concrete mixer and compacting the concrete with vibrator and curing complete excluding cost of form work and reinforcement for R.C.C. work for all floors in all heights., including curing and carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge. | 18 | Cum. | 5,500 ₹99,000 Lowest | 6,500 ₹1,17,000 | 6,600 ₹1,18,800 | 7,250 ₹1,30,500 |
| 5.00 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement mix by concrete mixer and compacting the concrete with vibrator and curing complete excluding cost of form work and reinforcement for R.C.C. work for all floors in all heights., including curing and carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge . | 13.52 | Cum. | 5,500 ₹74,360 Lowest | 7,000 ₹94,640 | 7,600 ₹1,02,752 | 8,000 ₹1,08,160 |
| 6.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) mechanically mix by concrete mixer and compacting the concrete with vibrator and curing complete excluding cost of form work and reinforcement for R.C.C. work for all floors in all heights., including curing and carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge. | 5.29 | Cum. | 7,000 ₹37,030 Lowest | 7,200 ₹38,088 | 7,800 ₹41,262 | 7,500 ₹39,675 |
| 7.00 | Providing Tor steel reinforcement including cost of binding wire for R.C.C. work including cutting, bending, binding and placing in position including cost of binding wire complete in Super-structure for all floor level in all heights, including carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge. | 36.81 | Qtl. | 7,200 ₹2,65,032 Lowest | 8,300 ₹3,05,523 | 8,000 ₹2,94,480 | 8,500 ₹3,12,885 |
| 8.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:3:6 (1 Cement : 3 coarse sand) : 6 graded stone aggregate 20 mm nominal size) mechanically mix by concrete mixer including curing complete excluding cost of centering and shuttering in: Foundation and plinth, including carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge. | 11.44 | Cum. | 4,000 ₹45,760 Lowest | 4,800 ₹54,912 | 5,200 ₹59,488 | 5,000 ₹57,200 |
Tender Value
₹19.0 L
EMD Value
₹37,800
Closing Date
10 Aug 2026, 5:00 pmClosed
Executive Engineer
HPSIDC Shimla
Repair and maintenance/ construction of shed for rearing of the Khadknath flock at Kamlahi Tutikandi Distt. Shimla (HP).
2026_SIDC_140161_1
Job No. 4
Open Tender
Civil Works
Item Rate
120 days
Shimla
Please refer Tender documents.
8 documents required · 8 mandatory
₹600
₹37,800
14 Sept 2026
30 Jul 2026
11 Aug 2026
30 Jul 2026
10 Aug 2026
30 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains including dressing of sides and ramming of bottoms in earth work in all heights and depths in all kinds of soilscomprising of pick work, jumper work and blasting work both in soft and hard rock with chiseling and wedging out of rock (where blasting is prohibited) and their intermediate classification of soils including, dewatering wherever required, setting out to required lines, levels as shown on the drawing and directed by the engineer-in-charge at site., according to the HP.PWD. specification of 1990 (one thousand nine hundred ninety) volume-I (one) and sorting out useful and unuseful material and transportation of the unuseful material for disposing at dumping site (To be arranged by the contractor) including payment of MC/ local body dumping charges it lived any as per satisfaction of Engineer-in-charge through all modes of transportation including head load, animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour (if required). All useful material such as stones, shingles aggregate and slates shall be properly stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation and used/ removed as per the direction of Engineer-in-charge. Any loss to the public and private propriety during the course of execution and disposal of serviceable and unserviceable materials shall be absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges. | 120 | Cum. | - | - |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand) : 8 graded stone aggregate 40 mm nominal size)mechanically mix by concrete mixer including curing complete, including carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge. | 9 | Cum. | - | - |
| 3.01 | Centering and shuttering including strutting, propping etc. and removal of form, including carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge. (a) Foundations, footings, bases of columns, etc. for mass concrete | 36 | Sqm | - | - |
| 3.02 | b) Columns, Pillars, Piers, Abutments, Posts and Struts for all floor level in all heights. | 120.15 | Sqm | - | - |
| 3.03 | c) Lintels, beams, plinth beams, girders, bressumers and cantilevers for all floor level in all heights. | 70.44 | Sqm | - | - |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level mechanically mix by concrete mixer and compacting the concrete with vibrator and curing complete excluding cost of form work and reinforcement for R.C.C. work for all floors in all heights., including curing and carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge. | 18 | Cum. | - | - |
| 5 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement mix by concrete mixer and compacting the concrete with vibrator and curing complete excluding cost of form work and reinforcement for R.C.C. work for all floors in all heights., including curing and carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge . | 13.52 | Cum. | - | - |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) mechanically mix by concrete mixer and compacting the concrete with vibrator and curing complete excluding cost of form work and reinforcement for R.C.C. work for all floors in all heights., including curing and carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge. | 5.29 | Cum. | - | - |
| 7 | Providing Tor steel reinforcement including cost of binding wire for R.C.C. work including cutting, bending, binding and placing in position including cost of binding wire complete in Super-structure for all floor level in all heights, including carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge. | 36.81 | Qtl. | - | - |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:3:6 (1 Cement : 3 coarse sand) : 6 graded stone aggregate 20 mm nominal size) mechanically mix by concrete mixer including curing complete excluding cost of centering and shuttering in: Foundation and plinth, including carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge. | 11.44 | Cum. | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_207841.xls
BOQ • 0.36 MB
Agreement_merged.pdf
Tender Documents • 3.88 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .