Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹2.4 L
EMD Value
₹4,760
Closing Date
26 Dec 2022, 1:00 pmClosed
Executive Engineer
Executive Engineer, JDA Division No.1, Rail Head Complex, Jammu
Laying of crates and filling RBM along Nallah at Birpur Housing Colony Samba. ( 2nd Time)
2022_HAUDD_199215_1
JDA-I/2022-23/e-NIT/135 Dated 10.12.2022
Open Tender
Civil Works
Item Rate
15 days
Jammu
As per SBD
3 documents required · 3 mandatory
₹300
Vice Chairman, JDA
₹4,760
30 Dec 2022
10 Dec 2022
26 Dec 2022
10 Dec 2022
26 Dec 2022
10 Dec 2022
Amount
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil :
Hand packing stones in wire crates of 20' x 4' x 4' size, made of mesh 5" x 5" with mesh wire dia meter 2.70/3.70 mm, including cost of crates, and stone boulde of nominal size 225 mm all leads and lifts
Dumping stones, including cost of stones on horizontal and slopes , behind crates including all leads and lifts
Filling River Bed Material (RBM) in layers upto 20 CM rolling every third and Top most layer and consoliddation , including all leads and lifts as per direction of Engineer in charge
Darshan Kumar
RACHIT DUBEY
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .