| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.6 LAccepted-AOC | 1 | Accepted-AOC L-1 | |
| 2 | 2₹9.9 L+₹33,053.09 (3.46%)Rejected-AOC | 2 | Rejected-AOC L-2 | |
| 3 | 3₹10.2 L+₹59,830.28 (6.26%)Rejected-AOC KALIJHORA KALIJHORA BAZAR KALIJHORA BAZAR KALIJHORA BAZAR DARJEELING WEST BENGAL 734008 | DARJEELING | WEST BENGAL | 734008 | 3 | Rejected-AOC L-3 | |
| 4 | 4₹10.4 L+₹89,138.11 (9.33%)Rejected-AOC | 4 | Rejected-AOC L-4 | |
| 5 | 5₹10.6 L+₹1.0 L (10.6%)Rejected-AOC | 5 | Rejected-AOC L-5 |
Tender Value
₹13.6 L
EMD Value
₹27,260
Closing Date
21 Oct 2024, 5:00 pmClosed
KRISHAN KUMAR
PD Charkhi Dadri
Earth filling and Construction of Boundary wall at Mandhi Hariya College in Provincial Division PWD BandR Br. Ch. Dadri
2024_HRY_404391_1
202467CF88A7 4DE0 4BC6 8E91 30A3426C9368613BAR
Open Tender
Civil Works
Works
60 days
MANDHI HARIYA
As per CBD
2 documents required · 2 mandatory
₹1,000
₹27,260
Yes
13 Nov 2024
15 Oct 2024
22 Oct 2024
15 Oct 2024
21 Oct 2024
15 Oct 2024
Amount
[11.5.4]12 mm cement plaster of mix : 4. 1:6 (1 cement: 6 fine sand)
[11.93.1]Finishing walls with water proofing cement paint of required shade : 1. New work (Two or more coats applied @ 3.84 kg/10 sqm)
[17.6]Construction of Embankment with Material obtained from Borrow pits NA Construction of Embankment CBR 8% (for new road/ raising/ berms/ etc.) with approved material obtained from borrow pits, including compensation of earth with all lead and lift transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2, as per technical clause 305 of MORT&H specifications.
[4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil
[4.32]Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
[6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
[6.1.6]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size)
[6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size)
[6.15.1]Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor four level, excluding cost of centering, shuttering, finishing and reinforcement : 1. 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size)
[6.30.1]Centering and shuttering including strutting, propping etc. and removal of form for 1. Foundations, footings, bases of columns, etc. for mass concrete
[6.30.5]Centering and shuttering including strutting, propping etc. and removal of form for 5. Lintels, beams, plinth beams, girders, bressumers and cantilevers
[6.30.6]Centering and shuttering including strutting, propping etc. and removal of form for 6. Columns, Pillars, Piers, Abutments, Posts and Struts
[6.34.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect above plinth level Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more.
[7.47.2]Brick work with non modular fly ash bricks conforming to IS:12894, class designation 10 average compressive strength in super structure above plinth level up to floor IV level in : 2. Cement mortar 1:6 (1 cement: 6 Coarse sand)
[7.48.1]Brick work with modular extruded brunt fly ash clay sewer bricks (Conforming to IS: 4885 ) in cement mortar 1:4 (1 cement : 4 coarse sand) in foundation and plinth : 1. Cement Mortar 1:4 (1 cement: 4 coarse sand)
JAI SHIV CONSTRUCTION (BID ID -1154726)
Royal Construction Company (BID ID -1154815)
M/s Guru Construction Company, Ch. Dadri (BID ID -1154451)
SURENDER KUMAR CONT (BID ID -1153661)
Surender Singh Enterprises (BID ID -1153619)
DINESH TRADING CO. (BID ID -1153729)
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .