| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹95.4 LAccepted-Finance 503 GROUND FLOOR SECTOR 4 VAISHALI GHAZIABAD UTTAR PRADESH 201010 | GHAZIABAD | UTTAR PRADESH | 201010 | L1 | Accepted-Finance FIRST LOWEST | |
| 2 | L2₹1.2 Cr+₹20.9 L (21.9%)Rejected-Finance | L2 | Rejected-Finance SECOND LOWEST | |
| 3 | Rejected-Technical | - | Rejected-Technical PF Registration not found |
Tender Value
₹97.1 L
EMD Value
₹1.9 L
Closing Date
10 Jan 2022, 3:00 pmClosed
Executive Engineer
Office of the Executive Engineer , IInd Const.Div (E./M.), UPJN, Aligarh
Construction of 08 Nos. Tubewells of size 300X200 mm and 135mt. depth by D.C. Rig Machine and SITC of its associated Electrical/Mechanical equipments at different sites of Aligarh Nagar
2021_UPJNM_667067_1
1014/Nivida/32 dated 24.12.2021
Open Tender
Electrical Works
Item Rate
120 days
Aligarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
Executive Engineer , IInd Const.Div (E./M.), UPJN,
₹1.9 L
Yes
16 Mar 2022
29 Dec 2021
10 Jan 2022
29 Dec 2021
10 Jan 2022
29 Dec 2021
Amount
Shifting and Carting of Rig Machine and its T&P upto site and back with loading and unloading complete in all respect.
Shifting and Carting of Air Compressor and its T&P upto site and back with loading and unloading complete in all respect.
Shifting and Carting of OP unit & its T&P upto site and back with loading and unloading complete in all respect.
Carting of Tubewell Assembly upto site with loading and unloading complete in all respect.
Erection of Rig Machine and its T&P (11X1)
Dismantling of Rig Machine and its T&P (11X1)
Drilling of 675 mm dia bore from GL to 70 m BGL
Drilling of 500 mm dia bore from 70 to 100 m BGL
Drilling of 500 mm dia bore from 100 to 135 m BGL
Electrical Logging of borewell
Lowering of 300 mm dia M.S. Housing Pipe from GL to 60 m BGL
Lowering of 200 mm dia Plain/Slotted Pipe from 60 M BGL to 100 m BGL
Lowering of 200 mm dia Plain/Slotted Pipe from 100 M BGL to 120 m BGL
Shrouding of Pea-Gravel
Erection of 250 PSI Air Compressor for Development of Tubewell
Development of Tubewell by 250 PSI Air Compressor
Dismantling of 250 PSI Air Compressor after Development
Erection of OP Unit for Development of Tubewell
Development of Tubewell by OP Unit
Dismantling of OP Unit after Development
Chemical test of water sample
Barricading of site during the construction of T.W for safety precaution
Supply of 1000 lpm, 60 m Head Submersible Pump Motor Set
Supply of Switchgear for pumping plant with fully automatic digital soft starter panel suitable for SCADA operation
Supply of Main Piping and Valves of 100 mm size. Length of Column Pipes-45 m
Supply of Pressure CE/UL approved manufacturer's Smart Pressure Transmitter and depth gauge
Supply of Lifting Tackle - 2 Tonnes capacity
Supply of Special Tools and Spanners
Supply of Miscellaneous items such as Protection Rings, Cut-outs, TW Cover, Insulating Rubber Mats etc.
Supply of Servo Voltage Stabilizer 40 kVA
Painting of Main piping and valves
Erection of pumping plant and all other equipments
One month watch & ward during the period of installation
Testing at works, Commissioning and Trial Run for 1 month
Supply of Electromechanical Chemical Plant
Three months Operation and maintenance of Electrical & Mechanical items.
PUMPS ENGINEERS AND TRADERS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .