| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAccepted-AOC KUMBAKONAM | ₹8.3 L | L1 | Accepted-AOC Acceptted |
| 2 | L2₹8.4 LRejected-Finance | ₹8.4 L | L2 | Rejected-Finance Above Tender |
| Sl No | Description | Qty | Unit | V GNANAPRAKASAM L1 | SIVAKUMAR V L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all classes of soils such as hard stiff clay, stiff black cotton, hard red earth, shales, murram, ordinary earth, earth mix with 50% fair sized boulders etc., with initial lead and lifts including laying, spreading, leveling, sectioning breaking clods etc., including all incidental charges etc., complete as per standard specification . for Foundations SS 20B TNDSS NO. 23 &24 V, VI (S2) VI 9 | 40.9 | M3 | 10,777 ₹10,777 | 10,839 ₹10,839 |
| 2.00 | Supply filling of Stone Dust in layer of not more than 15 cm thick including watering with all layers and consolidation complying with standard specification including cost and conveyence of sand to Site and all labour charges and all other incidential charges etc,. complete as per Standard Specification TNDSS NO. 24 &25 NBC Part VI (S2) 8 | 13.2 | M3 | 9,821 ₹9,821 | 9,874 ₹9,874 |
| 3.00 | Plain Cement concrete of mix 1:4:8 (One cement four sand and eight aggregates) using 40mm gauge hard broken including cost conveyance of all materials to site including labour charges, transporting and placing in position including shoring, strutting forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification. TNDSS NO.28 V,VI S25 | 13.2 | M3 | 85,945 ₹85,945 | 86,130 ₹86,130 |
| 4.00 | Reinforced Cement concrete 1:1½:3 (One cement one point five sand and three aggregates) mix using 20mm gauge hard granite broken stone jelly in all RCC works connected to the work excluding shuttering , Centering and cost of Reinforcement grills but including curing ,finishing etc complete with standard specification and as directed by Engineer incharge. TNDSS NO. 28 V,VI S25 | 14.2 | M3 | 1,43,903 ₹1.4 L | 1,44,130 ₹1.4 L |
| 5.00 | Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle of size 25 x 25 x 3mm for boarding laid over silver oak joists(Country wood) of size 10 x 6.5cm spaced @ about 90cm c/c and supported by casurina props of 10 - 13cm dia. spaced @ 75cm c/c etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.for the following items.(RCC floor slab, roof slab, Rectangular/ square, Tee/ Ell beams, Lintels, staircase waist slabs, Landing slabs, Landing beam, Portico beam etc., ). TNDSS NO.86 K, 86 A (a) below 1.00 Height | 49.5 | M2 | 16,137 ₹16,137 | 16,236 ₹16,236 |
| 6.00 | For Column | 46.6 | M2 | 60,697 ₹60,697 | 60,813 ₹60,813 |
| 7.00 | Supplying and Fabrication of Steel and placing in position TMT rod Grills for RCC works as per design given including cost of steel and GI binding wire in Floors etc,. Complete complying with standard specification in force and as directed by department officials.- TNDSS NO. SS 86 & 86A V,VI, VII (S6) 7,3 | 1,060 | kg | 97,361 ₹97,361 | 1,00,700 ₹1.0 L |
| 8.00 | Plain Cement Concrete 1:2:4 mix (One Cement,two M Sand and four Coarse Aggregate) Using 20mm ISS HBG metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers(TNBP No.28). | 9.6 | M3 | 74,986 ₹74,986 | 75,120 ₹75,120 |
| 9.00 | Plastering walls with cement mortar 1:5 (One cement five M Sand) 12mm thick in all floors and all exposed surfaces including cost and conveyance of materials to site and all labour charges,Curing etc complete as per standard specification. | 37.5 | M2 | 11,034 ₹11,034 | 11,138 ₹11,138 |
| 10.00 | Supplying and fixing of RoofTruss using I Section for Vertical member M.S. angle frames and M.S Plates including cost of I section, angles and flats in proper position including labour charges for cutting, welding, and including labour charges for priming cost of red oxide painting and erection in a proper position etc. complete as per standard specification. | 1,340 | Kg | 1,51,688 ₹1.5 L | 1,54,100 ₹1.5 L |
Tender Value
₹9.9 L
EMD Value
₹9,910
Closing Date
17 Sept 2025, 3:00 pmClosed
Executive Officer
Veppathur Town Panchayat
Construction Of Solid Waste Management Vehicle Shed at Veppathur Office Permises in Veppathur Town Panchayat
2025_DTP_603391_1
202/2025
Open Tender
Civil Works - Others
90 days
Veppathur Town Panchayat
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹9,910
28 Mar 2026
12 Sept 2025
17 Sept 2025
12 Sept 2025
17 Sept 2025
12 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_721297.xls
BOQ • 0.29 MB