| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹20.0 LAccepted-AOC | ₹20.0 L | 1 | Accepted-AOC L1 quoted firm |
| 2 | 2₹25.6 L+₹5.6 L (27.8%)Rejected-AOC | ₹25.6 L+₹5.6 L (27.8%) | 2 | Rejected-AOC L2 quoted firm |
| 3 | 3₹28.8 L+₹8.8 L (43.9%)Rejected-AOC 12 MARIAMMAN KOIL STREET MUTHULINGAMPET LAWSPET PUDUCHERRY 605008 | PONDICHERRY | PUDUCHERRY | 605008 | ₹28.8 L+₹8.8 L (43.9%) | 3 | Rejected-AOC L3 quoted firm |
| 4 | 4₹28.9 L+₹8.8 L (44.1%)Rejected-AOC | ₹28.9 L+₹8.8 L (44.1%) | 4 | Rejected-AOC L4 quoted firm |
| 5 | 5₹30.9 L+₹10.8 L (54.1%)Rejected-AOC | ₹30.9 L+₹10.8 L (54.1%) | 5 | Rejected-AOC L5 quoted firm |
Tender Value
₹19.9 L
EMD Value
₹40,000
Closing Date
20 Apr 2023, 5:00 pmClosed
The Registrar
Electrical Wing, Admin building, Pondicherry University, RV Nagar, Kalapet, Puducherry
SITC of 22KV SF6 insulated outdoor type 1 No. 3 panel RMU and 1 No. 4 panel RMU in substation7 and 10 at Pondicherry University Campus.
2023_PU_747906_1
PU/ELW/RMU/2023-24/01
Open Tender
Electrical Works
Works
60 days
Electrical Wing, Pondicherry University
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹40,000
Yes
Electrical Wing, Admin building
9 Apr 2024
3 Apr 2023
24 Apr 2023
4 Apr 2023
20 Apr 2023
12 Apr 2023
12 Apr 2023
Amount
Supplying, Erection of 3 Panel RMU in the existing platform by carry out alteration civil work if any as may be required, installation, testing and commissioning of 22KV 630A, 21KA SF6 insulated 3 panel RMU outdoor compact switchgear with 2 Nos. manual load breaker and 1 No. manual operated vacuum circuit breaker. CT ratio 30A/1A. Make:ABB, Siemens, Schneider & Lucy.
Supplying, Erection of 4 Panel RMU in the existing platform by carry out alteration civil work if any as may be required, installation, testing and commissioning of 22KV 630A, 21KA SF6 insulated 4 panel RMU outdoor compact switchgear with 4 Nos. manual operated vacuum circuit breaker. CT ratio 150A/1A- 3Nos., 30A/1A-1 No. Make:ABB, Siemens, Schneider & Lucy.
Dismantling the end termination and shifting of existing 22KV, 630A, SF6 Schnedier make following RMU from substaion transformer yard to nearby power room without any damage as required.
a) 3 Panel
b) 4 Panel
Supplying and making indoor cable end termination with heat shrinkable jointing kit in RMU complete with all accessories including lugs suitable for following size of 3 core, XLPE aluminium conductor cable of 22KV grade as required.
a) 185 sq. mm
b) 240 sq. mm
Excavation along the lose cable and laying of one number PVC insulated and PVC sheathed/XLPE power cable of 22KV grade of following size direct in ground including sand cushioning, protective covering and refilling the trench etc., as required.
a) Above 120 sq. mm and upto 400 sq. mm
Providing & fixing 25mm x 6 mm copper strips on surface or in recess including connection with brass nut, bolt, spring washer etc., as required
Supplying and providing 2 sq. mtr of 10 mm thick ISI marked rubber mat.
Charges for supply of 3 copies of detail drawing obtaining safety certificate approval from local Electricity department/Central Electricity Authority, payment of CEA inspection/liaison fees or any other charges for fulfilling of requirements and conditions laid down by CEA complete.
Thirumalai Enterprises
PURODHA ELECTRIC CO
POWERTECH ENTERPRISES
B G K ENTERPRISES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .