Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.2 LAccepted-AOC | L1 | Accepted-AOC Found lowest one bidder | |
| 2 | L1₹13.2 LRejected-AOC N A | NA | NA | 121004 | L1 | Rejected-AOC Quoted high rate as compared to L1 | |
| 3 | L1₹13.2 LRejected-AOC SH TSERING DORJEY C 438 S O SONAM YANGFAIL R O CHUSHUL | LEH LADAKH | LADAKH | 194101 | L1 | Rejected-AOC Quoted high rate as compared to L1 | |
| 4 | L1₹13.2 LRejected-AOC | L1 | Rejected-AOC Quoted high rate as compared to L1 | |
| 5 | L1₹13.2 LRejected-AOC | L1 | Rejected-AOC Quoted high rate as compared to L1 |
Tender Value
₹22 L
Closing Date
17 Nov 2022, 2:00 pmClosed
Executive Engineer
REW Leh
Construction of link road from Phezey Naga to Gonpa at Satto, Block Durbuk
2022_RDD_8396_1
NIT 53 - UTL REWL OF 2022-23
Open Tender
Civil Works - Others
Item Rate
60 days
Leh
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
Payable To Executive Engineer
Exempted
15 Mar 2023
11 Nov 2022
19 Nov 2022
11 Nov 2022
17 Nov 2022
11 Nov 2022
Amount
Earth work in excavati..;n by mechanical means (Hydraulic excavator) over areas (Exceeding 30cm in depth, 1.5mtr in width as well as 10sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.50 m, disposed earth to be levelled and neatly dressed: All kinds of soil
Dry random rubble masonry with hard stone infoundation and plinth: Using nallah stone without bond stone
Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size ) Nallah
Earth work in rough excavation, banking excavated earth in layers not exceeding 20 em in depth, breaking clods, watering, rolling each layer with half tonne roller or wooden L?or steel rammers, and rolling every third and top -most layer with power roller of minimun 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or tilling up ground depressions lead upto 50 mtr and lift upto 1. 5 mtr. in : All kinds of soil:
Carriage of earth from an average lead of 2 km by MT
Carriage of stone from an average lead of 10 km by MT
Carriage of sand and aggregate from an average lead of 15 km by MT
Carriage of cement from an average lead of 117 km by MT
M/S STANZIN DORJE
M/S SONAM TSERING
M/S NAWANG DORJAY GOVT CONTRACTOR
M/S STANZIN TAKPA
M/S DORJAY NAMGAIL
M/S DORJEY DADUL
M/S KONCHOK GYALSON
Ramzan Din
M/S KONCHOK RANGDOL
M/S RIGZIN NAMGAIL
M/S TUNDUP GURMET
M/S NAWANG GIALSON GOVT CONTRACTOR
M/S TSEWANG NAMGAIL
M/S PUNCHOK DORJAY GOVT CONTRACTOR
stage.html
html • 0.09 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .