Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 LAdmitted-Fee/PreQual/Technical/Finance KANIYANUR PANCHAYAT | ₹1.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.2 L+₹5,862.56 (5.04%)Admitted-Fee/PreQual/Technical/Finance | ₹1.2 L+₹5,862.56 (5.04%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.3 L+₹16,198.66 (13.9%)Admitted-Fee/PreQual/Technical/Finance | ₹1.3 L+₹16,198.66 (13.9%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | P PICHANDI L2 | SPR TRADERS L1 | V MANI L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation and depositing on bank with in initial lead of 10m and initial lift of 2m in hard stiff clay, stiff black cotton soil,hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 12.15 | cum | 125.66 ₹1,526.77 Lowest | 215 ₹2,612.25 | 210.55 ₹2,558.18 |
| 2.00 | Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., | 1.35 | cum | 5,447.22 ₹7,353.75 | 4,600 ₹6,210 Lowest | 5,447.22 ₹7,353.75 |
| 3.00 | Cement concrete 1:3:6 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc., | 6.75 | cum | 4,195.66 ₹28,320.71 Lowest | 5,250 ₹35,437.5 | 5,340.55 ₹36,048.71 |
| 4.00 | Supply and erecting of centering including cost and conveyance of all materials to work site and all labour charges etc complete | 35.1 | Sqm | 547.5 ₹19,217.25 | 420 ₹14,742 Lowest | 547.5 ₹19,217.25 |
| 5.00 | Supplying, fabricating and placing in position Mild steel / Ribbed Tor steel grills for all RCC Works as per design given including cost of steel and GI. Binding wire in all floors etc., complete complying with standard specification. ( contractor has to make his own arrangements ) | 0.26 | MT | 91,902.66 ₹23,894.69 | 76,270 ₹19,830.2 Lowest | 91,902.66 ₹23,894.69 |
| 6.00 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc. | 2.25 | cum | 9,180.8 ₹20,656.8 | 7,830 ₹17,617.5 Lowest | 9,180.8 ₹20,656.8 |
| 7.00 | Plastering with CM 1:4 mix using 20mm TK including cost and conveyance and all labour charges etc., | 4.5 | Sqm | 579.5 ₹2,607.75 | 480 ₹2,160 Lowest | 579.5 ₹2,607.75 |
| 8.00 | GST 18% | 1 | No | 18,643.99 ₹18,643.99 | 17,749.7 ₹17,749.7 Lowest | 20,220.68 ₹20,220.68 |
Tender Value
Refer Docs
EMD Value
₹1,430
Closing Date
6 Aug 2026, 3:00 pmClosed
The panchayat president, Mangadu
The Panchayat office, Mangadu
Construction of Culvert at Kilandai street in Mangadu H/O Mangadu Panchayat
2026_RDTN_688511_1
84/07/2026
Open Tender
Civil Works
Works
90 days
The Panchayat office, Mangadu
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1,430
6 Aug 2026
25 Jul 2026
6 Aug 2026
25 Jul 2026
6 Aug 2026
25 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation and depositing on bank with in initial lead of 10m and initial lift of 2m in hard stiff clay, stiff black cotton soil,hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 12.15 | cum | - | - |
| 2 | Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., | 1.35 | cum | - | - |
| 3 | Cement concrete 1:3:6 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc., | 6.75 | cum | - | - |
| 4 | Supply and erecting of centering including cost and conveyance of all materials to work site and all labour charges etc complete | 35.1 | Sqm | - | - |
| 5 | Supplying, fabricating and placing in position Mild steel / Ribbed Tor steel grills for all RCC Works as per design given including cost of steel and GI. Binding wire in all floors etc., complete complying with standard specification. ( contractor has to make his own arrangements ) | 0.26 | MT | - | - |
| 6 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc. | 2.25 | cum | - | - |
| 7 | Plastering with CM 1:4 mix using 20mm TK including cost and conveyance and all labour charges etc., | 4.5 | Sqm | - | - |
| 8 | GST 18% | 1 | No | - | - |
stage.html
html • 0.02 MB
finance_827675.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_827675.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .