Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹9.9 L+₹496.23 (0.05%)Admitted-Fee/PreQual/Technical/Finance LAKSHMI NAGAR ACHHALDA AURAIYA | ETAWAH | UTTAR PRADESH | 206120 | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹9.9 L+₹893.22 (0.09%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹9.9 L
EMD Value
₹10,000
Closing Date
16 Sept 2026, 6:00 pmClosed
Executive Engineering UPSIC KANPUR
Executive Engineering UPSIC KANPUR
CONSTRUCTION OF Smart Class And Bautification of Mahesh Bhatt School, Khapra Mohal At Cantt. Vidhan Sabha, Kanpur Nagar
2026_MSME_1183078_1
1068/EE4/26-27
Open Tender
Civil Works
Percentage
120 days
KANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Executive Engineering UPSIC KANPUR
₹10,000
25 Sept 2026
7 Sept 2026
17 Sept 2026
7 Sept 2026
16 Sept 2026
7 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Scraping old white or colour wash including disposal of refuse materials as directed by Engineer-in-charge with a distance of 60 mts . | 235.06 | cum | 14 | ₹3,290.84 |
| 2 | 12 mm thick Plaster 1:4 ….. Complete item13.1.1 | 162.62 | cum | 274.99 | ₹44,718.87 |
| 3 | Providing wall putty on new surface with approved quality of Berger/J.K/Birla or similar make in two coats.13.80 | 278.41 | cum | 123.65 | ₹34,425.4 |
| 4 | Finishing walls with texured exterior paint of required shade. New work (two or more coats applied @3.28 lit/10 sqm 13.45.1 | 278.41 | cum | 177.17 | ₹49,325.9 |
| 5 | Providing And fixing PVC Fallceiling … Complete item 12.52.2 | 129.21 | cum | 1,639.22 | ₹2,11,803.62 |
| 6 | Class 150 brickwork in 1:4 cement & coarse sand mortor in Super structure. | 1.16 | cum | 7,404.22 | ₹8,588.9 |
| 7 | Providing and laying 600x600mm vitrified tiles with water absorbation less than 0.08% and make conforming to IS :15622 of approved make, in all colours and shades laid on 20mm thick cement mortar 1:4 cement slurry @ 3.3 kg/sqm including grouting the joints with white cement and matching pigments etc....... Complete item | 129.21 | Cumt | 1,230.91 | ₹1,59,045.88 |
| 8 | Designing,fabricating,testing installing and fixing in position curtain wall with aluminium composite panel cladding, with grooves for linear as well as curvillinear portion of the builing for all heighs and level etc including as per dsr 8.32 | 79.3 | cum | 3,973.79 | ₹3,15,121.55 |
| 9 | Supply And Fixing Of Granite Stone Board… Complete item | 1 | job | 6,444 | ₹6,444 |
| 10 | Supply And providing of Furniture...complte item | 1 | job | 1,59,705 | ₹1,59,705 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
TermsandConditionTenderCivilWorks.pdf
Tender Documents • 0.05 MB
BOQ_2224867.xls
BOQ • 0.27 MB
CorrigendumEE4.pdf
PDF • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .