| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.8 CrAccepted-AOC | ₹7.8 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹7.9 Cr+₹12.9 L (1.67%)Rejected-Finance 1 234 8 | ALIGARH | UTTAR PRADESH | 202001 | ₹7.9 Cr+₹12.9 L (1.67%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹9.0 Cr+₹1.2 Cr (16.1%)Rejected-Finance 76 NEW COLONY CHAUGIRJI ETAWAH | ETAWAH | UTTAR PRADESH | 206001 | ₹9.0 Cr+₹1.2 Cr (16.1%) | L3 | Rejected-Finance Rejected |
Tender Value
₹12.5 Cr
EMD Value
₹25 L
Closing Date
14 Feb 2025, 12:00 pmClosed
SE BSR Circle PWD Bulandshahr
SE BSR Circle PWD Bulandshahr
Widening and Strengthening of Lakhwati Khanpur Gasupur Basighat road (ODR) from Km 1 to 9 in District Bulandshahr
2025_CEMRT_1002870_1
8750/96M/E-Tender/BSR Circle/2024-25 dt. 06.12.2024
Open Tender
Civil Works - Roads
Item Wise
365 days
Bulandshahr
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,714
₹25 L
SE BSR Circle PWD Bulandshahr
12 Mar 2025
7 Feb 2025
14 Feb 2025
7 Feb 2025
14 Feb 2025
7 Feb 2025
7 Feb 2025 - 10 Feb 2025
10 Feb 2025
Amount
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. As per Clause 3.13 Including cost of all material, labour, T&P, and all taxes complete but excluding cost of GST.
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. As per Clause 3.19 Including cost of all material, labour, T&P, and all taxes complete but excluding cost of GST.
Construction of sub-grade and earthen shoulders with approved material obtained from Right of way with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2. As per clause 3.18 Including cost of all material, labour, T&P, and all taxes complete but excluding cost of GST.
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 4.01 (B) Including cost of all material, labour, T&P, and all taxes complete but excluding cost of GST.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. As per clause 4.14 Including cost of all material, labour, T&P, and all taxes complete but excluding cost of GST.
Providing, laying and spreading of graded stone aggregate (ETA) after mixing with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying with 1% OPC cement and 3.50% Emulsion in uniform single layer on sub base/subgrade and compacting with the road roller to achieve the desire density. As per clause 4.14 Including cost of all material, labour, T&P, and all taxes complete but excluding cost of GST.
Providing and applying tack coat with VG-10 bitumen using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. As per clause 5.2 (ii) Including cost of all material, labour, T&P, and all taxes complete but excluding cost of GST.
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with VG-30 bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction As per clause 5.5(B) Including cost of all material, labour, T&P, and all taxes complete but excluding cost of GST.
Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. As per clause 6.10 Including cost of all material, labour, T&P, and all taxes complete but excluding cost of GST.
Construction of un-reinforced dowel jointed at expansion and construction joint only,plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M 30(Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and construction joints, applying debonding strips, primer, sealant, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified) and water finishing to lines and grade as per drawing and finished with Power Trowel Cum Floter-Trimix Flooring Machine.Technical Specification Clause 1501. As per sor SI. No. 20.15(B) Including cost of all material, labour, T&P, and all taxes complete but excluding cost of GST.
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. As per clause 12.04 Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.
RCC Grade M20 using batching plant transit mixer & concrete pump As per clause 13.05 (E) Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. As per clause 13.6 Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications. As per clause 12.05 Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.
Supply and fixing of 600 mm dia NP3 type Hume Pipe S&S in position including labour and T&P etc. required for proper completion of work. Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.
Supply and fixing of 350 mm dia NP3 type Hume Pipe S&S in position including labour and T&P etc. required for proper completion of work. Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.
Providing & laying of 1000 mm NP-3 hume pipe in position including supply of all material, labour, T&P all taxes, labour cess etc required for proper completion of work as per specifications including all type of taxes, octroi, tolls,cess but excluding cost of GST and as per direction of engineer incharge. Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.
Pointing with cement mortar (1:3) on brick work in substructure as per Technical Specifications As per clause 13.02 Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.
Plastering with cement mortar (1:3) on brick work in sub-structure as per Technical Specifications As per clause 13.03 Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15 As per Clause 13.05 Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.
Sand filling in Foundation trenches as per drawing and Technical Specifications as per clause 15.23. Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.
Plain/Reinforced Cement Concrete (RCC Grade M-30) for wall and slab etc. compelete as per drawing and Technical Specifications. As per clause13.05 Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.
Providing weep holes in Brick masonry /Plain/ Reinforced concrete abutment, wing wall/ return wall with 110 mm dia PVC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications. as per clause 13.08 Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification. As per cluase 15.23 Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.
Drainage Spouts complete as per drawing and Technical specification as per clause 14.09 Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres As per Clause 2.04 Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.
Brick on edge pavement with straight over burnt brick on parties with bricks, laid dry joints filled with fine sand including preparation of base to proper slope, and its ramming, spreading layer of 1 cm. (3/8") depth of local sand over the subgrade and including supply of all materials, labour Tools &plants etc. required for proper completion of the work. as per SOR SI. No 20.05 Including cost of all material, labour, T&P and all taxes complete but excluding cost of GST.
Maintenance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintenance of First Year @0.00% of Total Work Amount)
Maintenance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintenance of Second Year @0.25% of Total Work Amount)
Maintenance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintenance of Third Year @0.50% of Total Work Amount)
Maintenance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintenance of Fourth Year @0.75% of Total Work Amount)
Maintenance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintenance of Fifth Year @1% of Total Work Amount)
Santosh Kumar Sharma (BID ID -4951010)
M/S GOVERDHAN ASSOCIATES (BID ID -4955966)
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_1789437.xls
BOQ • 0.31 MB
162777924.pdf
Tender Documents • 0.88 MB
162777927.pdf
Tender Documents • 1.32 MB
162777932.html
Tender Documents • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .