| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 LAccepted-Finance | L1 | Accepted-Finance QUALIFIED | |
| 2 | L2₹3.4 L+₹10,300 (3.12%)Accepted-Finance | L2 | Accepted-Finance QUALIFIED | |
| 3 | L3₹4.2 L+₹92,300 (28.0%)Accepted-Finance | L3 | Accepted-Finance QUALIFIED | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 5 | Not Admitted-Fee/PreQual/Technical 100 FOOTA ROAD FCI COLONY BAREILLY | BAREILLY | UTTAR PRADESH | 243001 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹4.3 L
EMD Value
₹4,500
Closing Date
18 Sept 2021, 11:00 amClosed
SE, EDC-2 BULANDSHAHR
EDC-2 BULANDSHAHR
INCREASING CAPACITY OF CONNECTION OF GOVT. HOSPITAL GULAOTHI IN FULL DEPOSIT SCHEME UNDER EDD-I BULANDSHAHR.
2021_PVVNL_613748_2
26/EDC-II/BSR/21-22
Open Tender
Electrical Works
Lump-sum
7 days
EDD-I BULANDSHAHR
INCREASING CAPACITY OF CONNECTION OF GOVT. HOSPITAL GULAOTHI IN FULL DEPOSIT SCHEME UNDER EDD-I BULANDSHAHR.
2 documents required · 2 mandatory
₹1,180
SE, EDC-2 BULANDSHAHR
₹4,500
8 Oct 2021
10 Sept 2021
18 Sept 2021
10 Sept 2021
18 Sept 2021
10 Sept 2021
Amount
FOR CARRYING OUT THE DIFFERENT ELECTRICITY MATERIAL FROM ELECTRICITY STORE CENTER BSR TO 33/11 KV S/S GULAWTHI NO-01 DISTANCE APROXE 00 TO 30 KM.
Carriage of Pole support from Electricity store center, Bulandshahar/J.E. Store to site of work with loading and unloading at both ends on Kachha Packka road.
S.T. Pole 11 Mtr. Long.
250 KVA T/F
11 KV VCB OUTGOING
11 KV 3*70 SQMM XLPE CABLE & LT XLPE
3 PHASE 4 WIRE STATIC PVM METER
POLE MOUNTED CT/PT UNIT
11 KV METERING CUBICLE
Erection & fixing of STP pole 11 mtr. in H.T./L.T. Line after digging of suitable pits including fixing of all accessories by providing cross arm,LTclamp made of M.S. Flat of size 50x6mm & Insulator proper size nuts and bolts as per RESPO Drawing/Norms.
Stringing/Sagging of New conductor /line on new erected pole as per RESPO norms.
Concreting of Pole including making plinth, With Cement Concrete With Ratio 1:2:4 as per respo norms.
Erection of 11 KV CT/PT Combined Unit On Dubble Pole With Providing & Fixing Of Suitable Clamp as per RESPO norm.
Erection of 11 KV Pilfer Metering Cubcile In Meter Room With Providing & Fixing Of Suitable Nut & Bolt as per RESPO norm.
Construction Of 2*2 Meter & 1.5 Meter Height From Ground Lavel T/F Plinth, Plinth Foundation Will Be Start At Proper Mude, With Providing Cement, Sand, Bricks & Concrete In Proper Ratio & Also Providing 6 Inch Thick Concrete Slabe On Top Of T/F Plinth
Construction Of 2.6*1.8 Meter T/F Plinth Fencing With Providing & Fixing Of Proper Insuladed Material As Per RESPO Norms.
Laying Of XLPE Cable With Through HDPE Pipe As Per RESPO Norms.
Providing & Fixing Of Cable Jointing Kit 3*70 mm As Per RESPO Norms.
Providing & Laying Of AB Cable 3*50+1*25 sqmm With Through HDPE Pipe As Per RESPO Norms From T/F To Oxygen Plant Room.
Installation Of 250 KVA T/F On Plinth As Per RESPO Norms.
Earthing T/F Nuturial & Body With 100 Feet Water Lavel Pipe Earthing With Providing Earthing Realated Material Like GI Pipe 1.5 Inch & GI Street 1.5 Inch of poe with earthing material.
Installation Of Out Going VCB In Control Room As Per RESPO Norms.
Earthing Of STP With Earthing Rod As Per RESPO Norms.
Dismantling of 25 KVA / 63 KVA Transformer
All work will be done as per UPPCL/RESPO Rules.
S.S. CONTRACTOR
NEHA ENTERPRISES
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .