Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance | -1.50% | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.1 Cr+₹75,557.08 (0.71%)Admitted-Finance | -0.80% | ₹1.1 Cr+₹75,557.08 (0.71%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical Documents were not in order |
Tender Value
₹1.1 Cr
EMD Value
₹11.0 L
Closing Date
4 Sept 2026, 12:00 pmClosed
EXECUTIVE OFFICER
NAGAR PALIKA PARISHAD HAPUR
05 - Modinagar road per bijli ghar ke paas naale par box culvert nirman ka karya.
2026_DOLBU_1179324_5
297/23/PWD/2026-27 Dt. 22-08-2026
Open Tender
Miscellaneous Works
Percentage
365 days
HAPUR
Tender Fee, EMD and Other documents as per the tender document/NIT
2 documents required · 2 mandatory
₹2,714
EO NPP HAPUR
₹11.0 L
14 Sept 2026
24 Aug 2026
4 Sept 2026
24 Aug 2026
4 Sept 2026
24 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.000 | Box Culvert | - | - | - | - |
| 0.000 | (A) MINOR BRIDGE | - | - | - | - |
| - | Dismentelling of old interlocking bricks | - | sqm | 35 | - |
| - | Dismentelling of old exesisting road | 1 | cum | 312.23 | ₹311.92 |
| - | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | - | cum | 131.5 | - |
| - | Supplying and filling in plinth with sand under floor including watering ramming , consolidating and dressing complete. | - | cum | 391.5 | - |
| - | Plain/Reinforced Cement Concrete 1:2:4 in open foundation complete as per Drawing and Technical Specifications. | - | cum | 7,280.7 | - |
| - | Centering and shuttering including shuttering propping etc. and removal of form.for foundation, footing, bases of collumns etc. | - | sqm | 625.14 | - |
| - | Centering and shuttering including shuttering propping etc. and removal of form .for piers, abutments | - | sqm | 713.28 | - |
| - | Centering and shuttering including shuttering propping etc. and removal of form for suspended floors | - | sqm | 688.02 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.01 MB
BOQ_2217449.xls
BOQ • 0.34 MB
TD_297.pdf
Tender Documents • 2.77 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .