Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAccepted-Finance NOT SPECIFIED | ₹4.0 L | L1 | Accepted-Finance L1 |
| 2 | L2₹5.1 LRejected-Finance | ₹5.1 L | L2 | Rejected-Finance L2 |
| 3 | L3₹5.2 LRejected-Finance VILL DHINGLY P O KUNHOO TEHSIL KARSOG DISTT MANDI H P | ₹5.2 L | L3 | Rejected-Finance L3 |
Updated dates
Tender Value
₹5.0 L
EMD Value
₹4,957
Closing Date
1 Jan 2026, 2:00 pmClosed
Resident Engineer
Resident Engineer, GPHD, Jeori
Construction of discharge measurement site at intake of Chaba Power House u/s of raised weir.
2025_HPSEB_123421_1
HPSEBL/GPHD/DB-9/2025-26-124
Open Tender
Civil Works - Canal
30 days
Chaba
Please refer Tender documents.
4 documents required · 4 mandatory
₹590
₹4,957
10 Feb 2026
12 Dec 2025
2 Jan 2026
12 Dec 2025
1 Jan 2026
12 Dec 2025
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.
Wire crates of G.I. wire filles with boulders with square cut faces against the wire. (Wire crates to be measured and paid for separately).
Wire crates made of G.I. wire filled with boulders with square cut faces against the wire (Boulder filling to be measured and paid for separetaly). G.I. wire 5mm thick corresponding to SWG-6. 15cm.x15cm. mesh.
Boulder/stone filling behind crate wall.
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchorblocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand) : 8 graded stone aggregate 40 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form work for : Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
10.2 Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Gauge marrking at wall face through a special painter 2 Nos faces on each side centre of wall
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_181283.xls
BOQ • 0.28 MB
124tender.pdf
Tender Documents • 0.94 MB
Download all tender documents and submit your bid