Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H1₹9.7 CrAccepted-Finance | ₹9.7 Cr | H1 | Accepted-Finance Responsive |
| 2 | H2₹14.5 Cr+₹4.7 Cr (48.6%)Accepted-Finance | ₹14.5 Cr+₹4.7 Cr (48.6%) | H2 | Accepted-Finance Responsive |
| 3 | H3₹13.0 Cr+₹3.3 Cr (33.6%)Accepted-Finance | ₹13.0 Cr+₹3.3 Cr (33.6%) | H3 | Accepted-Finance Responsive |
| 4 | H4₹16.3 Cr+₹6.5 Cr (67.2%)Accepted-Finance | ₹16.3 Cr+₹6.5 Cr (67.2%) | H4 | Accepted-Finance Responsive |
| 5 | Rejected-Technical | - | - | Rejected-Technical Technically non Responsive |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
7 Aug 2023, 3:00 pmClosed
Ashutosh Mishra
NHIDCL HQ, New Delhi
Consultancy services for AE for Supervision of Shillong Western Bypass Road of following green field projects of (Existing km 60.900 of NH-40) to NH-106 (OLD NH-44E) (Package-I,II and III)
2023_NHIDC_755100_1
NHIDCL/Megh./AE/SWB/Pkg I,II and III/2023
Open Tender
Civil Works
EPC Contract
Meghalaya
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,900
MD NHIDCL
₹2 L
NHIDCL HQ, New Delhi
3 Sept 2024
26 May 2023
8 Aug 2023
26 May 2023
7 Aug 2023
1 Jul 2023
26 May 2023 - 16 Jun 2023
20 Jun 2023
Amount
Remuneration for Local Staff (inclusive of per Diem allowance)
Team Leader Cum Senior Highway Engineer (1 No. during Construction Period) (1*24) = 24
Resident Engineer cum Highway Engineer (2 No. during Construction Period & 1 No. during Maintainence Period) (2*24)+(1*60) = 108
Bridge/Structural Engineer (2 Nos. during Construction Period) (2*24) = 48
Senior Quality cum Material Expert (2 Nos. during Construction Period) (2*24) = 48
Sub-Professional Staff
Assistant Quality cum Material Engineer (2 No. during Construction Period & 1 No. during Maintainence Period) (2*24)+(1*60) = 108
Quantity Surveyor (2 No. during Construction Period & 1 No. during Maintainence Period) (2*24)+(1*60) = 108
Assistant Highway Engineer (2 No. during Construction Period & 1 No. during Maintainence Period) (2*24)+(1*60) = 108
Support Staff (inclusive of per diem allowance)
Office Manager cum Accountant cum Cashier (3 Nos. during Construction Period & 2 Nos. during Maintainence Period) (3*24)+(2*60) = 192
Steno cum Computer Operator (3 Nos. during Construction Period) (3*24) = 72
Office Boy (3 Nos. during Construction Period & 2 Nos. during Maintainence Period) (3*24)+(2*60) = 192
Transportation (Fixed Costs)
4*4 Vehicle Scorpio or equivalent (not more than 2 years old) (3 nos during Construction Period and 2 no. during Maintenance Period), (3*24)+(2*60) = 192 Rate per month
Motorcycle for Main Office during Construction (1*24) = 24
Motorcycle for Site Office during Construction (2*24) = 48
Motorcycle for Site Office during Maintenance (1*60) = 60
Office Rent (Fixed Costs) The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc.
Main office of minimum 200 sqm area for Construction Period and Two Site office of Minimum 100 sqm area for construction period (1*24)+(2*24) = 72
Defect Liability Period (min. 100sqm area) (2*60)
Office Supplies, Utilities and Communication (Fixed Costs)
Office Supplies (3*24)+(2*60) = 192
Drafting Supplies (3*24)+(2*60) = 192
Computer Running Costs (3*24)+(2*60) = 192
Domestic and International Communication (3*24)+(2*60) = 192
Office Furniture and Equipment (Rental)
(Rental) (3*24)+(2*60) = 192
Reports and Document Printing ( rate as per copy)
Monthly reports (Design and Construction) (84 months * 3 Copies) = 252 Copies
Half yearly Reports (14 months * 3 Copies) = 42 Copies
Various others reports as provided in the Concession Agreement such as Completion Report
Road Survey Equipment, Rate per Km
Surface defects detection and roughness measurement using Network Survey Vehicle (38.346 Km * 8 Nos.)= 306.79 Km
Pavement strength measurement using FWD (38.346 Km * 4 Nos.)= 153.38 Km
Bridge inspection using Mobile Bridge Inspection Unit ( 38 *8 Nos.)=176 Nos.
Road signs inspection using Retro Reflectometer (38.346 Km * 8 Nos.)= 306.79 Km
Contigencies A fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. (Fixed as Rs. 10,00,000)
ARMENGE Engineering private limited
Consulting Engineers Group Ltd.
SAI Consulting Engineers Pvt Ltd
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .