| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.8 LAccepted-AOC SENGADU PO EDAPPULI NADU KOLLIHILLS TK PIN 637411 | KOLLIHILLS | NAMAKKAL | TAMIL NADU | 637411 | L1 | Accepted-AOC Lowest Bidder | |
| 2 | L2₹23.1 L+₹34,892.06 (1.53%)Rejected-AOC | L2 | Rejected-AOC Highest Bidder |
Tender Value
₹23.1 L
EMD Value
₹24,000
Closing Date
4 May 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Project Director DRDA
The Project Director DRDA
Upgradation / Strengthening/ Renewal of 1 roads including 5 years routine maintenance after completion under Package no. 31/MGSMT/2022-23 in Tirupathur Block of Tirupathur District under MGSMT 2022-23.
2023_RDTN_303441_1
E1/0802/2023
Open Tender
Civil Works
Item Rate
180 days
DRDA
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹24,000
13 Jul 2023
18 Apr 2023
4 May 2023
18 Apr 2023
4 May 2023
18 Apr 2023
Amount
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes,scrubs, saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required
Advance patch work for making up the undulation in theexisting B.T surface to an average thickness of of 50mmusing 45mm IRC size HBG metal including all charges ete
Advance patch work for making up the undulation in theexisting B.T surface to an average thickness of of 25mmusing 13.20 mm IRC size HBG metal including all charges ete
Providing and laying Tack coat over BT surface using 3Kg of 471 bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat by fuel and all other incidental charges etc...
Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 23.232 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete .
Provision for H.M. stone
Provision for K.M. stone
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Provision of 15 nos. rumble strips covered with premix bituminous carpet, 15-20 mm high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to control speed, marked with white strips of road marking naint
Provision for Hard Bed Ch 625-640 m
Earth work excavation and depositing on bank with in initial lead and inits litter 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth his small sired boulders and hard gravelly soil as per SS 201
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25 mm x 25
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance fell materials and all labour charges for mixing laying and compacting ele, complete
Un reinforced cement concrete 1:1.5:3 mix using 20 mm ISS sine HG metal including cost and conveyace of all materials and all labour charges,etc,
Provision for Sign board
Providing Name board cum Citizen Board
Routine Maintenance
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
R Santhakumar
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .