| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.7 LAccepted-AOC NO 17 THROWPATHY AMMAN KOIL ST MELBHUVANAGIRI CHIDAMBARAM T K CUDDALORE DIST | CUDDALORE | TAMIL NADU | 605007 | L1 | Accepted-AOC L1 | |
| 2 | L2₹47.8 L+₹9,191 (0.19%)Rejected-Finance NO 2 69 MAIN ROAD VALLAMPADUGAI CHIDAMBARAM TK | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | P S MONOKARAN L1 | K MEENA L2 |
|---|---|---|---|---|---|
| 1.00Strengthening of BT Road to TNCSC Road at Melbuvanagiri Panchayat | |||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burrying and burning etc., | 912 | Sqm | 6.3 ₹5,745.6 Lowest | 7 ₹6,384 |
| 3.00 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m | 750 | Sqm | 23.3 ₹17,475 Lowest | 24 ₹18,000 |
| 4.00 | Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting side drain etc, complete. as per SS20 A | 820.8 | Cum | 140.45 ₹1,15,281.36 Lowest | 141 ₹1,15,732.8 |
| 5.00 | Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction | 91.2 | Cum | 671 ₹61,195.2 Lowest | 675 ₹61,560 |
| 6.00 | Plant Mix Method : Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 | 49.01 | Cum | 2,930 ₹1,43,599.3 Lowest | 2,935 ₹1,43,844.35 |
| 7.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 405.56 | Cum | 3,037 ₹12,31,685.72 Lowest | 3,040 ₹12,32,902.4 |
| 8.00 | Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5 | 2,703.75 | Sqm | 85.05 ₹2,29,953.94 Lowest | 86 ₹2,32,522.5 |
| 9.00 | Providing and laying Tack Coat over WBM/ WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 | 2,703.75 | Sqm | 19.7 ₹53,263.88 Lowest | 20 ₹54,075 |
| 10.00 | Providing and laying 50mm consolidated thick bituminous macadam using 0.20 cum fo 26.50-13.20mm, 0.43 cum of 13.20-2.36mm and 0.08 cum of 2.36mm & below size IRC metal with 34.04 Kgs of VG30/ VG40 bitumen and 2.96kg of waste plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc.,complete as per specification.(Bituminous Macadam 50mm thick Using Vibratory Roller( ( Using Plastic Waste) | 135.19 | Cum | 9,673 ₹13,07,692.87 Lowest | 9,675 ₹13,07,963.25 |
Tender Value
₹51.0 L
EMD Value
₹52,000
Closing Date
8 Sept 2025, 3:00 pmClosed
Additional Collector
Drda,Cuddalore
Strengthening of BT Road to TNCSC Road at Lalpuram Panchayat in Melbhuvanagiri Block under MGSMT PHASE III Package No.7
2025_RDTN_593896_7
A10/3065/2025/MGSMT Phase III
Open Tender
Civil Works - Roads
Item Wise
180 days
Cuddalore
As per tender
4 documents required · 4 mandatory
₹0
₹52,000
Drda,Cuddalore
24 Nov 2025
18 Aug 2025
8 Sept 2025
18 Aug 2025
8 Sept 2025
19 Aug 2025
28 Aug 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .