| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹21.0 LAccepted-AOC | 1 | Accepted-AOC Quoted L1 rate accepted | |
| 2 | 2₹21.5 L+₹50,537.66 (2.40%)Rejected-AOC | 2 | Rejected-AOC Quoted L2 rate rejected |
| Sl No | Description | Qty | Unit | P SIVARAMA REDDY L1 | SREE DURGA ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00CONSTRUCTION OF CREMATION SHED , CC ROAD, AND COMPOUND WALL BODI REDDY KANDIGAI IN S.R.KANDIGAI PANCHAYAT | |||||
| 2.00CREMATION SHED | |||||
| 3.00 | Provision for light jungle clearance in all labour charges etc complete | 960 | Cum | 6 ₹5,760 Lowest | 15 ₹14,400 |
| 4.00 | Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation. | 9.17 | Cum | 246 ₹2,256 Lowest | 258 ₹2,366 |
| 5.00 | Supply and filling in foundation and basement with filling sand layers not more than 15cm thick etc complete | 6.6 | Cum | 1,987 ₹13,114 Lowest | 2,500 ₹16,500 |
| 6.00 | Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed. | 11.03 | Cum | 5,715 ₹63,036 Lowest | 6,500 ₹71,695 |
| 7.00 | RCC 1:1.5:3 Mix using 20mm HBG metal including cost and conveyance and all labour charges and materials charges completed.. | 3.95 | Cum | 9,504 ₹37,541 | 9,500 ₹37,525 Lowest |
| 8.00 | RCC 1:1.5:3 Mix using 20mm HBG metal including cost and conveyance and all labour charges and materials charges completed..Above Base | 3.41 | Cum | 9,636 ₹32,859 Lowest | 9,900 ₹33,759 |
| 9.00 | Supply and errecting for centering including cost and conveyance and labour charges with materials charges with MS sheet completed | 11.16 | Cum | 516 ₹5,759 Lowest | 1,000 ₹11,160 |
| 10.00 | Supply and errecting for centering including cost and conveyance and labour charges with materials charges with MS sheet completed aboveBase | 48.59 | Cum | 1,033 ₹50,193 Lowest | 1,100 ₹53,449 |
Tender Value
Refer Docs
EMD Value
₹44,500
Closing Date
11 Jul 2025, 3:00 pmClosed
Block development officer BP
Block development office, Kottakarai, Gummidipoondi
Construction of cremation shed , compound wall ,cc road at BR kandigai in S.R kandigai pt Under NNT2025-26
2025_RDTN_578103_1
RC840/2025/A2
Open Tender
Civil Works
Item Rate
Gummdipoondi
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹44,500
30 Aug 2025
4 Jul 2025
11 Jul 2025
4 Jul 2025
11 Jul 2025
4 Jul 2025
Amount
CONSTRUCTION OF CREMATION SHED , CC ROAD, AND COMPOUND WALL BODI REDDY KANDIGAI IN S.R.KANDIGAI PANCHAYAT
CREMATION SHED
Provision for light jungle clearance in all labour charges etc complete
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
Supply and filling in foundation and basement with filling sand layers not more than 15cm thick etc complete
Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed.
RCC 1:1.5:3 Mix using 20mm HBG metal including cost and conveyance and all labour charges and materials charges completed..
RCC 1:1.5:3 Mix using 20mm HBG metal including cost and conveyance and all labour charges and materials charges completed..Above Base
Supply and errecting for centering including cost and conveyance and labour charges with materials charges with MS sheet completed
Supply and errecting for centering including cost and conveyance and labour charges with materials charges with MS sheet completed aboveBase
Supply and Fabrication of steel including cost and conveyance of all materials to site and all labour charges for placing in position etc,..completed..
Brick work in CM 1:5 mix using country Bricks including cost and conveyance of all materials to site mixing, placing,curing and all labour charges etc,..
Plastering in CM 1:5 Mix using 12mm thick including cost and conveyance and all lab our charges and materials charges completed..
Finishing the exposed surface of RCC items in CM 1:3 10mm thick for slabs beams etc complete
Color washing two coat with best quality cement paint including cost of all charges etc complete
Cement Concrete 1:2:4 (One cement, Two sand, four Hard Broken stone) using 20 mm guage machine broken hard broken granite stone jelly fincluding cost conveyance and all labour charges etc. complete.
Compound wall
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed.
Supply and Fabrication of steel including cost and conveyance of all materials to site and all labour charges for placing in position etc,..completed..
Supply and errecting for centering including cost and conveyance and labour charges with materials charges with MS sheet completed
Supply and errecting for centering including cost and conveyance and labour charges with materials charges with MS sheet completed..
RCC 1:1.5:3 Mix using 20mm HBG metal including cost and conveyance and all labour charges and materials charges completed..
Brick work in CM 1:5 mix using country Bricks including cost and conveyance of all materials to site mixing, placing,curing and all labour charges etc,..
Plastering in CM 1:5 Mix using 12mm thick including cost and conveyance and all lab our charges and materials charges completed..
Painting two coats with Exterior/interior first quality Emulsion of approved colour over one coat of primer including cost and conveyance and all lab our charges and materials charges completed..
CC Road
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
Cement Concrete 1:4:8 ( One Cement Five sand and Ten Hard Broken stone) using 40 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. comple
Towards centering chargers for all labour charges etc
Cement Concrete 1:3:6 (One cement, Three sand, six Hard Broken stone) using 20 mm guage machine broken hard broken granite stone jelly fincluding cost conveyance and all labour charges etc. complete.
Towards centering chargers for all labour charges etc
Cement Concrete 1:2:4 (One cement, Two sand, four Hard Broken stone) using 20 mm guage machine broken hard broken granite stone jelly fincluding cost conveyance and all labour charges etc. complete.
Supplying and fixing of Bitumen pad for expansion joints
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
SREE DURGA ENTERPRISES (BID ID -1398770)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_690843.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .