| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC 611 VPO JUAN SONIPAT HARYANA 131024 | SONIPAT | SONIPAT | HARYANA | 131024 | ₹1.1 Cr | L1 | Accepted-AOC ok |
| 2 | l2₹1.1 Cr+₹4.9 L (4.55%)Rejected-AOC GODARA ESTATE KAIMRI ROAD 125001 | HISAR | HARYANA | 125001 | ₹1.1 Cr+₹4.9 L (4.55%) | l2 | Rejected-AOC ok |
| 3 | L3₹1.2 Cr+₹7.4 L (6.82%)Rejected-AOC | ₹1.2 Cr+₹7.4 L (6.82%) | L3 | Rejected-AOC ok |
| 4 | L4₹1.2 Cr+₹11.4 L (10.5%)Rejected-AOC 2162 SECTOR 1 4 NEAR URBAN HEALTH CENTER HISAR 125001 | HISAR | HARYANA | 125001 | ₹1.2 Cr+₹11.4 L (10.5%) | L4 | Rejected-AOC ok |
| 5 | L5₹1.3 Cr+₹21.0 L (19.5%)Rejected-AOC HOUSE NO 953 SECTOR 23 HUDA BHIWANI TEHSIL AND DISTRICT BHIWANI | BHIWANI | BHIWANI | HARYANA | ₹1.3 Cr+₹21.0 L (19.5%) | L5 | Rejected-AOC ok |
Tender Value
₹1.3 Cr
EMD Value
₹2.5 L
Closing Date
3 Oct 2022, 5:00 pmClosed
SATYENDER KUMAR
L.W.S. Divn. Ch-Dadri
Estimate for rehabilitation of birhi mr. from RD 0 to 12500 and Birhi Sub Mr. from RD 0 to 7000
2022_HRY_239322_1
2022D1B961E3 2DAD 4653 B3F5 369BD11E9706134IRR
Open Tender
Civil Works
Works
180 days
BIRHI KALAN
2 documents required · 2 mandatory
₹15,000
₹2.5 L
Yes
23 Dec 2022
15 Sept 2022
4 Oct 2022
15 Sept 2022
3 Oct 2022
15 Sept 2022
Amount
[11.61.1]White washing with lime to give an even shade : 1. New work (three or more coats) Through Rate
[14.10.1.2.1]Lining with design mix concrete of grade M-15 with minimum cement content 240kg/cum, 75mm thick in curve portion and side slope manually including rendering with cement sand (1:3) slurry, form work, dressing and preparation of sub grade as per directions of Engineer-in-charge. 1.2.1. In slope Manually Through Rate
[14.14.2]Curing Lining for 28 days 2. On Side slopes Through Rate
[14.15]Extra allowance for providing templates in curved portion of lining Through Rate
[4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil Through Rate
[4.33]Excavating, supplying and filling of local earth (including royalty) by mechanical transport up to a lead of 1 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. Through Rate
[5.23.2]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 2. Nominal concrete 1:2:4 or leaner mix (i/c equivalent design mix) Through Rate
[5.25]Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. Through Rate
[5.7.4]Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 4. In cement mortar Through Rate
[6.1.4]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 4. 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) Through Rate
[6.22.1.2]Providing and laying in position ready mixed plain cement concrete, with cement content as per approved design mix and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for plain cement concrete work, including pumping of R.M.C. from transit mixer to site of laying and curing, excluding the cost of centering, shuttering and finishing, including cost of curing, admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge. 1.2. All works above plinth and up to floor IV level : M-15 grade plain cement concrete (cement content considered @ 240 kg/cum) Through Rate
[6.22.2.2]Providing and laying in position ready mixed plain cement concrete, with cement content as per approved design mix and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for plain cement concrete work, including pumping of R.M.C. from transit mixer to site of laying and curing, excluding the cost of centering, shuttering and finishing, including cost of curing, admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge. 2.2. All works up to Plinth Level : M-15 grade plain cement concrete. (cement content considered @ 240 kg/cum) Through Rate
[6.25.1]Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. 1. All works up to plinth level Through Rate
[6.29.1]Centering and shuttering including strutting, propping etc. and removal of form work for : 1. Foundations, footings, bases for columns Through Rate
[6.29.2]Centering and shuttering including strutting, propping etc. and removal of form work for : 2. Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. Through Rate
[6.30.3]Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platform Through Rate
[6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level 6. Thermo-Mechanically Treated bars of grade Fe-500D or more. Through Rate
[6.58]Providing and fixing in position 12mm thick bitumen impregnated fibre board conforming to IS: 1838, including cost of primer, sealing compound Grade-A in expansion joints. Through Rate
[7.21.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) Through Rate
[9.57.1]Providing and fixing on wall face Unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes. 1. 75 mm diameter Through Rate
cement sand plaster 1:5 under CC Lining.( 10 MM THICK)
Brick work common burnt clay with Non modular bricks in cement sand mortar1:3 in foundation and plinth
PROVIDING AND LAYING 150 MICRON PLOYTHENE
Credit of old Steel
CREDIT OF TILE LINING
M/s Yashpal and Company
Rajiv Tihal Contractor Baliyali
J.S.R. CONSTRUCTION COMPANY
MAHA LAXMI CONSTRUCTION COMPANY
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .