Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-AOC ANDAVESWAR BARDHAMAN BARDHAMAN WEST BENGAL 713346 | ANDAVESWAR | BARDHAMAN | WEST BENGAL | 713346 | L1 | Accepted-AOC TC Recommendation | |
| 2 | L2₹1.6 L+₹2,714 (1.73%)Rejected-Finance PANDAVESWAR BARDHAMAN WEST BENGAL INDIA 713346 | PANDAVESWAR | BARDHAMAN | WEST BENGAL | 713346 | L2 | Rejected-Finance TC Recommendation | |
| 3 | L3₹1.6 L+₹4,248 (2.70%)Rejected-Finance 59 R G S ROAD USHAGRAM DURGAMANDIR ASANSOL BARDHAMAN 713303 WEST BENGAL INDIA | ASANSOL | BARDHAMAN | WEST BENGAL | 713303 | L3 | Rejected-Finance TC Recommendation |
Tender Value
₹1.6 L
EMD Value
₹2,000
Closing Date
11 Mar 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Maintenance of 2MVA, 11KV 3.3KV Power transformer KS make (SI. No.KS 17 2000 06, installed at CM project sub station of Nakrakona Kumardihi B Colliery under Bankola Area
2024_ECL_303361_1
ECL/GM/BA/E TENDER/23-24/EnM/362 Dt. 01.03.2024
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
Nakrakonda Kumardihi B Colliery
Please refer to NIT document
5 documents required · 5 mandatory
₹2,000
7 May 2024
1 Mar 2024
12 Mar 2024
1 Mar 2024
11 Mar 2024
1 Mar 2024
1 Mar 2024 - 5 Mar 2024
Amount
Item Description/ Heading
Dismantling of top cover, inspection chamber 3Nos, conservator tankven pipe and H.V And L.V connection box with new gasket fixing including All materials supply
Diamantling and re fixing of primay and secondary side studs including new gasket fixing
Dismantling, dismantling, relaying and reconnection of primary and secondary cable
Drain out of transformer oil in empty barrels and after overhauling top up the same of 1000kVA 11kV/3.3kV Transformer
Supply of insulating materials for N/A tape, paspon paper, cotton tape etc
Filtration and top up of full transformer oli
supply and fixing silica gel breather with silica gel for power transformer
Transportation charge for filter machine, tools, manpower etc
Supply and jointing of 11kv grade 35sq,mm outdoor type heat shrink joint on both sides
Supply and crimping of 150/70sq.mm. copper cable end lug
Total impact of GST for the purpose of CTC
ANNAPURNA ENTERPRISE
ROY ENTERPRISE
techsummary_314243.pdf
PDF • 0.97 MB
finsummary_314243.pdf
PDF • 0.97 MB
WOENM362.pdf
PDF • 1.29 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .