Tender Value
₹2.3 L
Closing Date
7 Sept 2026, 2:00 pmClosed
The Executive Engineer (O&M) Dn., Sarangarh
3 No Estimate for replacement of 25/63/100kva xmer single core cable at DT metering 141no various location under Gureli DC, (O&M) Dn Sarangarh.
106991
EE/O&M/ SGH/T-1240
Electrical Cables And Wires; Electrical and Electronics
Raigarh, Chhattisgarh
4 Sept 2026
4 Sept 2026
7 Sept 2026
ABSTRACT 1240 Gureli
Name of Work :- 3 No Estimate for replacement of 25/63/100kva xmer single core cable at DT metering 141no various location under Gureli DC, (O&M) Dn Sarangarh.
Sl. No. Name of Work Group NO/wo Internal Order No. Provision Cost of Estimate Material Cost Excluding (cent.)GST Labour Charges Total Tender Amount Contractor Quoted At % Total Value of awarded work CGST @9% On G SGST @9% On G Total Value of Work Including GST (ORDER AMT.) Company Supplied Amount OVERHEAD CHARGES Total Seving Estimate Cost - Total
11 KV LINE DP/Lt Me/lt Xmer Cable
1 Estimate for replacement of 25kva xmer single core cable at DT metering various location under Kosir DC, (O&M) Dn Sarangarh. L76028260745 L76028260745 0 0 0 45 256590 0
2 Estimate for replacement of 100kva xmer single core cable at DT metering various location underKosir DC, (O&M) Dn Sarangarh. L76028260750 L76028260749 0 0 0 48 494896 0
3 Estimate for replacement of 63kva xmer single core cable at DT metering various location under Gureli DC, (O&M) Dn Sarangarh. L76028260747 L76028260747 0 0 48 494896 0
ASSISTANT ENGINEER (O&M) S/ DN
11 KV DP FOR MATERIAL SOR Rate2024-25
UNIT With Gst GST RATE 1
SL NO SHORT TEXT QTY AMOUNT
1 PCC POLE 365 KG; 11 MTR LONG NO 7887.84
2 11KV 4 FEET CENTRE DC CROSS ARM NO 4857.46
4 11KV 45KN DISC INSULATOR T&C TYPE (POLYM NO 122.67
5 11 KV Strain hardware fittings. NO 154.41
6 11KV 5KN PIN INSULATOR (POLYMER) NO 149.74
7 M S ANGLE 65X65X6 MM KG 51.04
8 HT STAY CLAMP PCC POLE 280 KG A TYPE NO 362.87
9 STAY SET WITHOUT STAY WIRE16mm Paint11KV NO 569.59
10 STAY WIRES: - 7/3,05 MM (7/10 SWG) KG 89.28
11 HT STAY CLAMP PCC POLE 280 KG A TYPE NO 362.87
12 CONCRETE 1:3:6 RATIO M3 2970
13 EARTHING COIL 8SWG GI WIRE 50MM DIA 450M NO 145.56
16 Red Oxide Paint. L 191.67
17 Aluminium Paint. L 428.26
18 G.I. WIRES: - Barbed wire. KG 94.8
19 7130880041Danger boards 33KV & 11 KV. NO 112.23
22 M S NUTS AND BOLTS: - 16x40mm KG 84.76
14 M S NUTS AND BOLTS - 16x200mm KG 81.93
25 11 KV V CROSS ARM NO 1292.03
26 11KV top clamp NO 362.46
Cost of Material
SL NO SHORT TEXT UNIT RATE AMOUNT
1 Pit digging EA 447.78
2 Stay Pit digging EA 324.64
3 Shifting of materials to pole pit EA 68.2
4 Transportation of pole from road side to EA 559.72
5 DC Cross arm fixing complete including i EA 384.55
6 Pole erection complete (including earthi EA 1567.23
7 Concreting of stay and poles EA 642.68
8 Stay erection complete EA 223.89
9 Anticlimbing devices and danger board fi EA 96.6
10 Painting of cross arm, pole and numberi EA 111.94
11 Cross arm fixing complete with top clamp EA 96.6
12 Transportation Charges Material on EA
Total M+S Tender Amount
Company Supplied Material
SL NO SHORT TEXT UNIT RATE AMOUNT
SUPERVISION CHARGES FOR ESTIMATE
OVERHEAD CHARGES
LT LINE FOR MATERIAL RATE INCLUDING Incidental Charges @ 7.5% Ghughwa Tarapur
SL. NO SHORT TEXT UNIT RATE QTY. AMOUNT QTY. AMOUNT
1 RS Joist (175X85) mm 9.3 Mtr Long Kg 40.92 0 0
2 Suspension clamp assembly (consisting of GI Pole Clamp, GI Flat type I-hook & Nylon Cable tie). No 403.24 3 3
3 Piercing connector suitable for 25/16 Sq.mm-50/35 Sqmm AB Cable-for street light No 81.98 0 0
4 Piercing connector suitable for 50/35 Sqmm AB Cable-Distribution Box (3 Nos. per 3 phase DB & 1 No. per 1 phase DB) No 103.24 3 3
5 Piercing connector suitable for AB Cable to AB Cable Tee connections. No 143.9 0 0
6 Universal distribution connector ea 109.14 1 1
7 Anchor clamp assembly (consisting of GI Pole Clamp, GI Flat type I-hook & Nylon Cable tie). No 555.56 3 3
8 (i) Stay Set 16 mm (Complete) No 414.8 2 2
9 (ii) Stay Wire 7/10 SWG & 6 Kg/Stay Kg 66.22
10 (iii) Stay Clamp No 146.65
11 (iii) Stay Insulator No 0 0 0
12 Concreting of stay and base pad for RSJ & H-beam No 2705.72
13 M.S. Nuts and Bolts12x100 mm Kg 65.22 0 0
14 M.S. Nuts and Bolts16x40 mm Kg 65.22 1 1
15 M.S. Nuts and Bolts16x65 mm Kg 64.14 1 1
16 Earthing Set (Coil earth as per Drawing No- G/004 No 107.97 5 5
17 Distribution box 1 phase 9 connectors No 931.12 0 0
18 Distribution box 3 phase 5 connectors No 1121.63 1 1
19 Stainless steel strap with buckle for installation of Service Distribution Box. Set 55.42 0 0
20 Red Oxide Paint l 137.97 0.5 0.5
21 Aluminium Paint l 308.29 0.5 0.5
22 Service Ring No 324.16 1 1
23 PVC insulated single core 16 sq.mm. cable @ 6 mtr. per 3 phase box m 16.55 0 0
24 End Clamp Cap for 50/70 sqmm No 27.2 2 2
25 Cable Tie for AB Cable No 5.07 0 0
26 Straight through joints No 159.15 0 0
27 G.I. Wires-4,0mm (8 SWG) Kg 59.22 0 0
28 G.I. Wires-Barbed wire Kg 71.51 0 0
29 ASCR weasel conductor 0.03 sqmm m 0 0 0
Cost of Material
LT LINE FOR SERVICE
SL NO SHORT TEXT UNIT RATE QTY AMOUNT QTY AMOUNT
1 SurveyTree cuttingApproach Clearance Km 4558.19 0.25 0.25 4558.19
2 Pit digging No 303.88 3 303.88
3 Shifting of materials to pole pits No 60.78 60.78
4 Stay Pit digging No 273.49 273.49
5 Transportation of pole from road side to pole pit for a lead of 1 Km. No 303.88 303.88
6 Fixing of LT clamps complete per location including Service ring, distribution box, piercing connector No 75.97 75.97
7 Pole erection complete with earthing No 759.7 759.7
8 Concreting of stay and base pad for poles m3 850.85 850.8499999999999
9 Stay erection complete No 212.72
10 Painting of cross arm and numbering of poles. No 303.88 0 212.72
11 Stringing of line 60.78
12 Stringing of line 3P 5W ( Cable ) KM 16409.49 0 0 911.64
13 Stringing of line 3P 4W ( Cable ) KM 13066.83 0.212 0.212 60.78
14 Stringing of line 1P 3W ( Cable ) KM 9724.14 0 0
15 Labour charges for Concreting m3 578.84 0
16 Transportation Charges No 12621.46 0.25 0.25
Total M+S Tender Amount
Company Supllied Material
SL NO SHORT TEXT UNIT RATE QTY AMOUNT QTY AMOUNT
1 Conductor ACSR Scrap Kg 150.71 0 0
SUPERVISION CHARGES FOR ESTIMATE 0 0
OVERHEAD CHARGES 6715.57 6715.57
LT LINE FOR MATERIAL RATE INCLUDING Incidental Charges @ 7.5% Ghughwa Tarapur
SL. NO SHORT TEXT UNIT RATE QTY. AMOUNT QTY. AMOUNT
3 H-BEAM 152x152 mm 37.1 Kg /Mtr 11.0 Mtr long Kg 49.09 408.1 0
4 Suspension clamp assembly (consisting of GI Pole Clamp, GI Flat type I-hook & Nylon Cable tie). No 403.24 3 3 53.88
5 Piercing connector suitable for 25/16 Sq.mm-50/35 Sqmm AB Cable-for street light No 81.98 0 0
6 Piercing connector suitable for 50/35 Sqmm AB Cable-Distribution Box (3 Nos. per 3 phase DB & 1 No. per 1 phase DB) No 103.24 3 3
7 Piercing connector suitable for AB Cable to AB Cable Tee connections. No 143.9 0 0
8 Universal distribution connector ea 109.14 1 1
9 Anchor clamp assembly (consisting of GI Pole Clamp, GI Flat type I-hook & Nylon Cable tie). No 555.56 3 3
10 (i) Stay Set 16 mm (Complete) No 414.8 2 2
11 (ii) Stay Wire 7/10 SWG & 6 Kg/Stay Kg 66.22
12 (iii) Stay Clamp No 146.65
13 (iii) Stay Insulator No 0 0 0
14 Concreting of stay and base pad for RSJ & H-beam No 2705.72
15 M.S. Nuts and Bolts12x100 mm Kg 65.22 0 0
16 M.S. Nuts and Bolts16x40 mm Kg 65.22 1 1
17 M.S. Nuts and Bolts16x65 mm Kg 64.14 1 1
18 Earthing Set (Coil earth as per Drawing No- G/004 No 107.97 5 5
19 Distribution box 1 phase 9 connectors No 931.12 0 0
20 Distribution box 3 phase 5 connectors No 1121.63 1 1
21 Stainless steel strap with buckle for installation of Service Distribution Box. Set 55.42 0 0
22 Red Oxide Paint l 137.97 0.5 0.5
23 Aluminium Paint l 308.29 0.5 0.5
24 Service Ring No 324.16 1 1
25 PVC insulated single core 16 sq.mm. cable @ 6 mtr. per 3 phase box m 16.55 0 0
26 End Clamp Cap for 50/70 sqmm No 27.2 2 2
27 Cable Tie for AB Cable No 5.07 0 0
28 Straight through joints No 159.15 0 0
29 G.I. Wires-4,0mm (8 SWG) Kg 59.22 0 0
30 G.I. Wires-Barbed wire Kg 71.51 0 0
31 ASCR weasel conductor 0.03 sqmm m 0 0 0
Cost of Material
LT LINE FOR SERVICE
SL NO SHORT TEXT UNIT RATE QTY AMOUNT QTY AMOUNT
1 SurveyTree cuttingApproach Clearance Km 4558.19 0.25 0.25 4558.19
2 Pit digging No 303.88 2 303.88
3 Shifting of materials to pole pits No 60.78 60.78
4 Stay Pit digging No 273.49 273.49
5 Transportation of pole from road side to pole pit for a lead of 1 Km. No 303.88 303.88
6 Fixing of LT clamps complete per location including Service ring, distribution box, piercing connector No 75.97 75.97
7 Pole erection complete with earthing No 759.7 759.7
8 Concreting of stay and base pad for poles m3 850.85 850.8499999999999
9 Stay erection complete No 212.72
10 Painting of cross arm and numbering of poles. No 303.88 0 212.72
11 Stringing of line 60.78
12 Stringing of line 3P 5W ( Cable ) KM 16409.49 0 0 911.64
13 Stringing of line 3P 4W ( Cable ) KM 13066.83 0.212 0.212 60.78
14 Stringing of line 1P 3W ( Cable ) KM 9724.14 0 0
15 Labour charges for Concreting m3 578.84 0
16 Transportation Charges No 12621.46 0.25 0.25
Total M+S Tender Amount
Company Supllied Material
SL NO SHORT TEXT UNIT RATE QTY AMOUNT QTY AMOUNT
1 Conductor ACSR Scrap Kg 150.71 0 0
SUPERVISION CHARGES FOR ESTIMATE 0 0
OVERHEAD CHARGES 6715.57 6715.57
o28 CABLE SOR Rate2026-27 Gureli DC, Gureli DC, Gureli DC, Salheona &SariaDC, Saria
UNIT With Gst GST RATE 1 2 3 1 1
SL NO SHORT TEXT QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT
ALUMINIUM SCRAP 102 102
1 ALUMINIUM 1C 70 SQ MM UNARMOURED LT PVC 95.82 95.82
2 70 SQMM ALUMINIUM END TERMINALS (LUGS) No 18.57 18.57
11 KV VCB without control panel & CT's. 139318.47 139318.47
CONCRETE 1:3:6 RATIO 2970 2970
11 KV C.T's (OUT DOOR TYPE)300-150/5 A 13926.6 13926.6
11 KV & 33 KV VCB SCRAP 2500 2500
Cost of Material
CENTAGES @7.5% 0 0 0 0 0 0
TOTAL Cost of Material 0
11 KV DP FOR SERVICE
SL NO SHORT TEXT UNIT RATE AMOUNT AMOUNT AMOUNT AMOUNT AMOUNT
1 LABOUR SCH FOR C-7-(I) A. LABOUR CHARGE No 1151.37 45 48 82924 48 82924 0 0 0 0
2 LABOUR CHARGES FOR INSTALLETION 11KV VCB No 8677 0 0
3 for foundation of VCB No 4490 0 0
4 Transportation Charges for Xmer No 5573.9 0.5 1800 0.05 3500 3500 0 0 0 0
5 CONCRETE 1:3:6 RATIO 2970 0 0
Company Supplied Material
SL NO SHORT TEXT UNIT RATE AMOUNT AMOUNT AMOUNT AMOUNT AMOUNT
1 ALUMINIUM SCRAP No 102 102 -260 -624 -624 0 0 0 0
2 ALUMINIUM 1C 70 SQ MM UNARMOURED LT PVC No 95.82 95.82 1800 0 0 0 0 0
3 70 SQMM ALUMINIUM END TERMINALS (LUGS) No 18.57 18.57 540 0 0 0 0 0
4 ALUMINIUM 1C 150 SQ MM UNARMOURED LT PVC No 189.28 189.28 0 1920 1920 0 0 0
5 150 SQMM ALUMINIUM END TERMINALS (LUGS) No 37.14 37.14 0 384 384 0 0 0
6 ALUMINIUM 1C 300 SQ MM UNARMOURED LT PVC No 374.43 374.43 0 0
7 300 SQMM ALUMINIUM END TERMINALS (LUGS) M3 112.98 112.98 0
CENTAGES @7.5% 0 0 0 0 0
Total Material COST
SUPERVISION CHARGES FOR ESTIMATE/OTHER 0 0 0 0 0
OVERHEAD CHARGES 31457 62060 62060 0 0
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
source.json
RAW_JSON • 0.00 MB
257041-NIT_TD106991.pdf
pdf • 0.88 MB
257042-BOQ_TD106991.xls
xls • 0.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .