Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹375.3 CrAdmitted-Finance PLOT NO 94 SECTOR 4 ADARSH NAGAR PHALODI | PHALODI | PHALODI | RAJASTHAN | ₹375.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹402.3 Cr+₹27.0 Cr (7.20%)Admitted-Finance SRSC TOWER CP 1 105 PART C PHASE II RADHIKA VIHAR MATHURA 281001 | MATHURA | MATHURA | UTTAR PRADESH | 281001 | ₹402.3 Cr+₹27.0 Cr (7.20%) | L2 | Admitted-Finance |
| 3 | L3₹405.3 Cr+₹30.0 Cr (8.00%)Admitted-Finance | ₹405.3 Cr+₹30.0 Cr (8.00%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | HEERA RAM GODARA L1 | M/s Balaji Dayalpura Infra Pvt.Ltd. L3 | SRSC Infra Private Limited L2 |
|---|---|---|---|---|---|---|
| 1.00 | Upgradation and construction work for Kekri to Deoli Section on SH 26 from 2 Lane to 4 Lane from existing Chainage 49/200 (As per existing Km. stone of SH 26) to terminating point of NH 52 at Km. 146+330 in the State of Rajasthan on Engineering Procurement and Construction (EPC) (Total Design length 53+100 Km) | 1 | One Complete Job on EPC Mode | 3,75,29,00,000 ₹3,75,29,00,000 Lowest | 4,05,30,44,000 ₹4,05,30,44,000 | 4,02,29,28,000 ₹4,02,29,28,000 |
Tender Value
₹442.1 Cr
EMD Value
₹8.8 Cr
Closing Date
19 Mar 2026, 6:00 pmClosed
GM RSRDC LTD JAIPUR
GM RSRDC LTD SETU BHAWAN, JHALANA DOONGARI, JAIPUR
Upgradation and construction work for Kekri to Deoli Section on SH 26 from 2 lane to 4 lane from existing chainage 49/200 (as per existing Km. stone of SH 26) to terminating point on NH 52 at Km 146 plus 330 in State of Raj. on Engineering Procuremen
2026_RSRDC_540564_1
RSRDC NIT No. 710/2025-26 Dated 17.02.2026
Open Tender
Civil Works - Roads
Item Rate
730 days
Upgradation and construction work for Kekri to Deo
PLEASE REFER TENDER DOCUMENTS
2 documents required · 2 mandatory
₹11,800
PD RSRDC UNIT AJMER THROUGH NEFT/RTGS/IMPS/BG
₹8.8 Cr
PD RSRDC UNIT AJMER
30 Mar 2026
20 Feb 2026
23 Mar 2026
20 Feb 2026
19 Mar 2026
6 Mar 2026
5 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Upgradation and construction work for Kekri to Deoli Section on SH 26 from 2 Lane to 4 Lane from existing Chainage 49/200 (As per existing Km. stone of SH 26) to terminating point of NH 52 at Km. 146+330 in the State of Rajasthan on Engineering Procurement and Construction (EPC) (Total Design length 53+100 Km) | 1 | One Complete Job on EPC Mode | 4,42,08,00,000 | ₹4,42,08,00,000 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.34 MB
Part_II_Drawing_Volume_KKRtoDeoPage51_100.pdf
Tender Documents • 22.07 MB
Part_III_Drawing_Volume_KKRtoDeoPage101_150.pdf
Tender Documents • 21.87 MB
Part_IV_Drawing_Volume_KKRtoDeoPage151_182.pdf
Tender Documents • 19.72 MB
Various_Act_Circulars_Orders_Notification.pdf
Tender Documents • 0.63 MB
pdbankdetails.pdf
Tender Documents • 0.01 MB
BOQ_963674.xls
BOQ • 0.28 MB
RFP_DOCUMENT.pdf
Tender Documents • 1.84 MB
QCorderdated_19042010.pdf
Tender Documents • 0.92 MB
Part_I_Drawing_Volume_KKRtoDeoPage1_50.pdf
Tender Documents • 15.81 MB
FinalEPC_Agreement.pdf
Tender Documents • 5.19 MB
CorrigendumNo1dated18032026.pdf
PDF • 0.84 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .