Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹18.4 L
EMD Value
₹18,400
Closing Date
7 Aug 2020, 4:00 pmClosed
EX.Engineer irrrigation ompora budgam
er irrrigation ompora budgam
Construction ofLining wall onmain canal Kenz Khul at Khasipora (section 1st)t..Amount of work Rs. 18.40 lacs (Including deptt supply)
2020_IFC_100897_5
enit24of072020
Open Tender
Civil Works
Item Wise
25 days
Budgam
Please refer Tender documents.
4 documents required · 4 mandatory
₹750
Yes
ExecutiveEngg ID ompora
₹18,400
Yes
8 Aug 2020
22 Jul 2020
8 Aug 2020
22 Jul 2020
7 Aug 2020
22 Jul 2020
Amount
Earth work in excavation by manual means over areas (exceeding 30 cm and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10sqm on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed In: All kinds of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work upto plinth level.a)1:5:10 (1 cement : 5 coarse sand: 10 graded stone agg.40mm nominal size ) crushed.
b)1:3:6 (1 cement : 3 coarse sand: 6 graded stone agg.20mm nominal size ) crushed.
Centring & shuttering including structting propping etc and removal of form for:-a)foundations, footings bases of columns etc for mass concrete
Filling available excavated earth (excl. rock in trenches ,plinth, sides of foundation etc in layers not nexceeding 20 cm in depth cosolidating each deposited layer by ramming and watering lead upto 50m & lift upto 1.50m
12mm cement plaster of mix: 1:4 (1 cement: 4 fine sand)
Carriage of Materials upto site of work by Mechanical transport including cost of loading unloading and stacking. a) 40mm agg. Av 30Km
b) 20mm agg from --do--
c)sand from Marva; av. 35 km
d) cement from division store av. 16km
M/S TECHNICAL ENGINEERING CONSTRUCTIONS
M/S PRIME CONSTRUCTIONS BUDGAM
M/S AL- AMEEN CONSTRUCTIONS
PRIME ENGINEERS AND CONSULTANTS
GREEN WOODS CONSTRUCTIONS
ALAMDAR GROUP OF ENGINEERS
M/S BUKHARI ENGINEERING CONTRACTORS
M/S SHAHEEN GROUP OF ENGINEERS AND CONSTRUCTION
M/S GANI CONSTRUCTION GROUP
M/S FRIENDS ENGG. AND CONSTRUCTIONS
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .