Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹23.3 LAdmitted-Finance 01 18 19 ANANDVAN ROW HOUSE LAM ROAD NASHIK ROAD NASH IK ROAD SAUBHAGYA NAGAR NASHIK MAHARASHTRA 422101 | NASHIK | MAHARASHTRA | 422101 | -37.25% | ₹23.3 L | L1 | Admitted-Finance |
| 2 | L2₹23.5 L+₹25,963.96 (1.12%)Admitted-Finance | -36.55% | ₹23.5 L+₹25,963.96 (1.12%) | L2 | Admitted-Finance |
| 3 | L3₹23.9 L+₹59,346.19 (2.55%)Admitted-Finance | -35.65% | ₹23.9 L+₹59,346.19 (2.55%) | L3 | Admitted-Finance |
| 4 | L4₹24.9 L+₹1.6 L (6.77%)Admitted-Finance 37A 99 1 MADHU NAGAR GWALIOR ROAD AGRA | AGRA | -33.00% | ₹24.9 L+₹1.6 L (6.77%) | L4 | Admitted-Finance |
| 5 | L5₹29.7 L+₹6.4 L (27.5%)Admitted-Finance | -20.00% | ₹29.7 L+₹6.4 L (27.5%) | L5 | Admitted-Finance |
Tender Value
₹37.1 L
EMD Value
₹3.7 L
Closing Date
11 Aug 2026, 12:00 pmClosed
CHIEF ENGINEER CIVIL
NAGAR NIGAM AGRA
Hariparvat Zone, Room No. 51 Work on interlocking and drain repair along the road shoulders on the main road and link roads in Suryalok.
2026_DOLBU_1173244_1
10-07-2026/NAGAR NIGAM AGRA/11-08-2026/20
Open Tender
Construction Works
Percentage
60 days
AGRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
NAGAR NIGAM
₹3.7 L
18 Sept 2026
3 Aug 2026
11 Aug 2026
3 Aug 2026
11 Aug 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of cement concrete or brick or granolithic floor including stacking of material as directed by E/IC within distance of 60 meters. (SI No. 697) | 71.84 | Sqm | 55 | ₹3,951.2 |
| 2 | Dismantling of stone flagged or interlocking tiled floor including stacking of material as directed by E/IC within distance of 60 meters. (SI No. 697) | 217.1 | Sqm | 35 | ₹7,598.5 |
| 3 | Earth work cutting in or in embankment in ordinary soil excavation to be in the form of a regular pits not exceeding 0.50m in depth and earth work in embankment to be in 20cm layers including ramming and dressing the surface to required levels and slopes and also including 1.5m lift and 30 m lead. The earth in form of cutting (b) to be used as spoil banks within 50m distance as directed by the engineer-in-charge including royalty 9.00 cum. {Chapter No. 4, S.I. No. 253(a)} | 544.63 | Cum | 135 | ₹73,525.05 |
| 4 | Cartage of ballast, Kankar, Coat, Grit or sand etc. including loading and unloading but excluding stacking on pucca roads.up to 8 Km distance | 573.53 | Cum | 230.1 | ₹1,31,969.25 |
| 5 | Class-150 (Non Modular) brick work in 1:4 cement and Coarse sand mortar in foundation and plinth including supply of all material, labor T&P etc. required for proper completion of work. (S.No. 6.1.1) | 49.59 | Cum | 5,600 | ₹2,77,704 |
| 6 | 12mm thick cement plaster in single coat of fair side of single of half brick wall for interior plastering up to floor two level including internal rounded angles chamfers and rounded angles not excluding 80mm in girth and finished even and smooth. No extra for mixing any additive. (c) 1 cement : 4 Coarse sand. (Chapter No. 13 S.I. No.-582(ii)) | 326.4 | Sqm | 190 | ₹62,016 |
| 7 | Providing and laying cement concrete in 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and curing complete, including cost of form work in foundation and floors. (DSR SN-4.1.3) | 15.41 | Cum | 6,500 | ₹1,00,165 |
| 8 | Providing and laying of 22.4-53mm gauge stone ballast 10cm thick (loose) coat including reparing of patches picking up to old surface spreading, ballast making medhies to retain water and carriage of metal up to 30m carriage of water upto 200m maintenance of barriers and all labour T&P including Road Roller Charges etc. required for proper completion of work The stone ballast is to be supplied to the contractor free of cost at site. {S.I. No. 755(c)} | 236.85 | Cum | 1,763.5 | ₹4,17,684.98 |
| 9 | Providing and laying of stone dust etc. all complete | 35.53 | Cum | 1,638.5 | ₹58,215.91 |
| 10 | Construction of stone ballast 10 cm thick (loose) coat including repairing of patches picking up to old surface spreading ballast making medhies to retain water and carriage of metal upto 30m carriage of water up to 200m maintenance of barriers and all labour T&P including road roller charges etc. required for proper completion of work the stone ballast is to be supplied to the contractor free of cost at site | 236.85 | Cum | 410 | ₹97,108.5 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.80 MB
BOQ_2206030.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .