| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC DOOR NO 7 121 KUDAL NAGAR KUDAL NAGAR KUTTALAM PATTI 626101 | VIRUDHUNAGAR | TAMIL NADU | 626101 | ₹4.9 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹5.0 LRejected-AOC | ₹5.0 L | L2 | Rejected-AOC Accepted |
| Sl No | Description | Qty | Unit | M/S K R Construction L2 | MANI M L1 |
|---|---|---|---|---|---|
| 1.00Vellore District Construction of Drainage at Gandhi Nagar Mariamman Koil Street in Seevoor Panchayat of Gudiyatham Block MLACDS (Gudiyatham) 2025 -2026 Package No 04 | |||||
| 2.00 | Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation. | 68.6 | Cu.M | 268.19 ₹18,397.83 | 263.67 ₹18,087.76 |
| 3.00 | Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete. | 9.8 | Cu.M | 5,440.14 ₹53,313.37 | 5,348.64 ₹52,416.67 |
| 4.00 | Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete | 235.2 | Sq.M | 556.64 ₹1.3 L | 547.28 ₹1.3 L |
| 5.00 | Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete | 4.02 | Sq.M | 1,113.29 ₹4,475.43 | 1,094.56 ₹4,400.13 |
| 6.00 | Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete | 27.05 | Cu.M | 6,758.81 ₹1.8 L | 6,645.13 ₹1.8 L |
| 7.00 | Supplying and fabrication of Steel to site and all labour charges for straightening, cutting to length, including all Cost and conveyance of labour charges etc.,Complete., | 0.04 | MTs. | 93,429.95 ₹3,737.20 | 91,858.54 ₹3,674.34 |
| 8.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 0.75 | Cu.M | 9,234.05 ₹6,925.54 | 9,078.74 ₹6,809.06 |
| 9.00 | Plastering with cement mortar 1:5, 20mm thick including cost and conveyance and all labour charges etc. | 44.1 | Sq,.M | 579.43 ₹25,552.86 | 569.68 ₹25,122.89 |
| 10.00 | Letering and Painting Name board | 1 | No. | 508.35 ₹508.35 | 499.8 ₹499.80 |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
29 Jan 2026, 3:00 pmClosed
The Block Development Office Gudiyatham
The Block Development Office Gudiyatham
Vellore District Construction of Drainage at Gandhi Nagar Mariamman Koil Street in Seevoor Panchayat of Gudiyatham Block MLACDS (Gudiyatham) 2025 -2026 Package No 04
2026_RDTN_645325_1
A2/1919/2025 GUD JAN 02-26
Open Tender
Civil Works
180 days
The Block Development Office Gudiyatham
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹10,000
17 Feb 2026
21 Jan 2026
29 Jan 2026
21 Jan 2026
29 Jan 2026
21 Jan 2026
Vellore District Construction of Drainage at Gandhi Nagar Mariamman Koil Street in Seevoor Panchayat of Gudiyatham Block MLACDS (Gudiyatham) 2025 -2026 Package No 04
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Supplying and fabrication of Steel to site and all labour charges for straightening, cutting to length, including all Cost and conveyance of labour charges etc.,Complete.,
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Plastering with cement mortar 1:5, 20mm thick including cost and conveyance and all labour charges etc.
Letering and Painting Name board
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_773366.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.69 MB
Tendernotice_2.pdf
PDF • 0.37 MB
BOQ_773366.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid