| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹18.9 LAccepted-AOC | ₹18.9 L Quoted ₹16.0 L | L-1 | Accepted-AOC Due to L-1 bidder |
| 2 | Rejected-Technical | - | - | Rejected-Technical Due to L6 Bidder |
| 3 | Rejected-Technical WARD NO 29 H NO 164 PODIBAHAR KORBA CG 495677 | KORBA | CHHATTISGARH | 495677 | - | - | Rejected-Technical Due to L5 Bidder |
| 4 | Rejected-Technical MQ 99 SHAKTI NAGAR COLONY GEVRA KORBA CG 495452 | KORBA | CHHATTISGARH | 495452 | - | - | Rejected-Technical Due to L2 Bidder |
| 5 | Rejected-Technical LIG 5A DEENDAYAL AWAS HOUSING BOARD COLONY KHARMORA KORBA CG 495677 | KORBA | CHHATTISGARH | 495677 | - | - | Rejected-Technical Due to L4 Bidder |
Tender Value
₹34.4 L
EMD Value
₹43,100
Closing Date
31 May 2023, 5:00 pmClosed
GM CIVIL GEVRA AREA
Office of the General Manager , SECL, Gevra Area, PO Gevra Project, Distt.- Korba (CG)Contact No. 9425534061
Day to day checking of sick wagons in rakes placed for loading in silo 3 and 4 and siding No.1 and 2, cleaning of garbage from wagons with other miscellaneous works at Gevra Project of Gevra area.
2023_SECL_279688_1
SECL/GA/GM(C)/ETN/23-24/30 dtd. 19.05.23
Open Tender
Civil Works - Others
Item Rate
365 days
Gevra Area
Please refer Tender documents.
3 documents required · 3 mandatory
₹43,100
31 Jul 2023
20 May 2023
2 Jun 2023
20 May 2023
31 May 2023
21 May 2023
20 May 2023 - 24 May 2023
Amount
Item Description/ Heading
Assistance required for checking sick wagon in racks placed for loading in silo No.3 @ 4 and sliding 1 @ 2 and cleaning of wagon removing for materials cleaning of coal on railway track and other miscellaneous work at Junadih siding as per instruction of Engineer in charge. Note :- (1) Minimum 4 (four) labour is required in each shift. The total labour is required in all shift 12 NOS (twelve) labour per day (1st shift- 4 Nos, 2nd shift-4 NOS. 3rd shift 4Nos per day) (2) if the contractor fails to provide required No of manpower as per contract, recovery @ double the unit rate of manpower derived as per updated or awrded rate whichever is higher shall be made from contractors' bill.
Total impact of GST for the purpose of CTC
Omprakash Sharma
SUBHADRA TRADERS
SAGAR CONSTRUCTION
M/S. R.K.CONTRACTOR
EQUIPMENTS CARE
SANJU BABA CONSTRUCTION
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_289541.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .